1.0 GENERAL
1.1 This standard / specification cover minimum technical requirements for the design, Manufacture,
supply and inspection of foam tank.
1.2 Any conflicting requirements between various applicable technical codes & specifications and this
requisition shall be referred to the PRL for review and consent.
4.0 Design
4.1 The vendor shall design the foam tank, keeping the dimensions/volume of the vessel same.
4.2 The location and no. of nozzles/ and openings shall be as per existing drawings except one EXTRA
OPEING IS REQUIRED ON TOP OF VESSEL FOR ENTRY.
4.3 The unit shall be placed on existing supports, Vendor shall ensure the same in design.
4.4 The design shall be based on ASME sec viii, Div. 1
4.5 Corrosion allowance shall be 3mm on all parts.
4.6 MDMT shall be -5o C.
4.7 Wind load shall be 160KPH while seismic Zone shall be 2b.
TECHNICAL REQUIREMENTS
EQUIPMENT: FOAM TANK CRUDE REV 00; Date: 26TH JULY17
INSP-TR-FOAMTANK PUMP AREA PAGE: 2 of 3
5.0 MATERIAL
5.1 The material of construction shall be Carbon steel and shall conform to one of the specification of
ASME section ii.
5.2 The material containing Zinc shall be avoided, Galvanized material shall not be used.
5.3 All material shall be new and FULLY KILLED.
5.4 Origin of material shall be of renowned mills (with clientele e.g. Shell, ExxonMobil, Chevron etc)
from Western Europe, USA, Japan or South Korea. All materials used shall be new, with MTCs &
Traceability and shall meet the requirements of the applicable Codes.
10.0 DEVIATIONS/NON-CONFORMANCE
10.1 The supplier should provide compliance statement to this document clearly and state separately
the deviation or non-conformance if any from this document
11.0 DRAWING
11.1 PRL