A vertical curve connects an upgrade slope of 2.5% to a downgrade slope of 2% for a road with a design speed of 60 Kmph. The problem is to calculate the length of the vertical curve connecting these two slopes given the design speed.
A vertical curve connects an upgrade slope of 2.5% to a downgrade slope of 2% for a road with a design speed of 60 Kmph. The problem is to calculate the length of the vertical curve connecting these two slopes given the design speed.
A vertical curve connects an upgrade slope of 2.5% to a downgrade slope of 2% for a road with a design speed of 60 Kmph. The problem is to calculate the length of the vertical curve connecting these two slopes given the design speed.