PLUMBING Course
...............................................
Course contents
1- Domestic network : " "
1-1 Cold water network (for wet area toilet, kitchen)
1-2 Hot water networks ( separate heating, central heating)
1-3 Hot water return
1-4 Hot water maintenance
1-5 Heat maintenance tape
1-6 Boiler \ clarifier \ EWH Electrical water heater
1-7 Tank design (capacity, connections)
1-8 Domestic system Pumps (Booster set, Transfer set, Circulation set)
1-9 Water hammer arrestor
2- Drainage network
2-1 Gravity networks:
2-1-a drainage networks (Drainage main or Waste soil or soil black waste k.w)
2-1-b Vent networks (Trap) (drainage by Gravity regulations)
2-1-c Storm drainage network
Steps of design
1- Count the number of sanitary ware S.W served fed by this
pipe
2- Count water supply fixture unit WSFU for this sanitary ware
(by table A-2)
3- Convert fixture unit WSFU to GPM (by chart A-2 OR A-3)
4- BY GPM we get pipe size (by friction chart A-5)
*****************
EX: -
Steps of design
1- Count the number of sanitary ware served fed by this pipe
2- Count water supply fixture unit WSFU for this sanitary ware
(by table A-2)
WSFU W.C
1- Flush tank: 2- flush valve
Private Public
-
sanitary ware W.C 2Lav SH BT
WSFU 2.5 1*2 4 4 12.5 WSFU
Flush tank
friction V= 8 GPM
F < 10 100
* In case of F > 10 take the larger size for the same line of GPM
-
10 GPM D=
sanitary diameter
WSFU GPM
ware size
* Point 1:
sizing 4 -
sanitary diameter
WSFU GPM
ware size
:
S. W1 , FU1 , 1 , D1
* Point 2:
Point 1
:
S. W2 , FU2 , 2 , D2
* Point 3:
GPM3 A-3 FU3 FU2 FU1
:
S. W4 , FU4 , 4 , D4
* Point 5:
Point 3
:
S. W6 , FU6 , 6 , D6
* Point 7:
Point 5 , Point 3
* Point 1:
S.W = 3wc, 3lav, 3sh, 3ur
FU = 7.5+ 3 + 12 + 12 = 34.5 FU
GPM 45 GPM
1
D=1 ,f=8 100 Sizing
2
* Point 4:
FU4 = FU1 + FU2 = 34.5 + 34.5 = 69
From chart A-3 by FU4 we get GPM4
From chart A-5 by GPM4 we get D4
* Point 5:
FU5 = FU4 + FU3 = 69 + 34.5 = 103.5
From chart A-3 by FU5 we get GPM5
From chart A-5 by GPM5 we get D5
****************************
Steps of design
1- Count the number of sanitary ware S.W served fed by this
pipe which have hot water connection
*( W.C, UR, Dish Washer D.W , Washing Machine W.M ) this sanitary ware havent hot water connection
2- Count water supply fixture unit WSFU for this sanitary ware
(by table A-2) and Multiply it with
3
4
*
sanitary ware
which have hot water 3/4 WSFU GPM diameter size
connection