The document contains an hourly electricity generation estimate for Cooperativa La Cruz Azul over a 10 day period. It shows the estimated kilowatt hour production for each hour between October 17th and 27th. Production is estimated to be 750 kWh from 8-9am and 450 kWh from 9-10am daily. All other hours are estimated to have 0 kWh production. The total estimated production for October 17th was 613 kWh.
Original Description:
CNAC
Original Title
Generación Horaria 17-10-2017 y Estimación de Generación
The document contains an hourly electricity generation estimate for Cooperativa La Cruz Azul over a 10 day period. It shows the estimated kilowatt hour production for each hour between October 17th and 27th. Production is estimated to be 750 kWh from 8-9am and 450 kWh from 9-10am daily. All other hours are estimated to have 0 kWh production. The total estimated production for October 17th was 613 kWh.
The document contains an hourly electricity generation estimate for Cooperativa La Cruz Azul over a 10 day period. It shows the estimated kilowatt hour production for each hour between October 17th and 27th. Production is estimated to be 750 kWh from 8-9am and 450 kWh from 9-10am daily. All other hours are estimated to have 0 kWh production. The total estimated production for October 17th was 613 kWh.