Hail Surface Facilities Eps Project: Page 1 of 2
Hail Surface Facilities Eps Project: Page 1 of 2
Hail Surface Facilities Eps Project: Page 1 of 2
Target
ADOC
Discipline Rev. Drawing Project ITP ITP Title Activity Location Remarks
TPI
TR
No. No. Inspection Inspection Inspected Status TR RFI No.
No. No. No. No.
RFI-HSF-
06.00 AM TO Radiographic Film Interpretation HD-EC-CM-
11 Module Piping TARGET-TF- 0 2-Oct-17 - ITP for Module Installation 4.8 W W W W Mubarraz - - Intertek Format Mechanical
06.00 PM for Module Piping ZQXS-5011
MEC-0199
RFI-HSF-
06.00 AM TO Surface preparation,paint HD-EC-CM- ITP for Surface Preparation and 2.1,
13 Painting TARGET-TF- 0 2-Oct-17 - H W S Mubarraz - - AE 328 Painting
06.00 PM application & Final DFT check ZQXS-5001 Coating 2.2
PAINT-0022
DATE 1-Oct-17