Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

m.

.00
10
= r
R.L illa
B M T AP
T
BIW

TA
Pil
lar
SPEL Project Area
BIW

r Ltd Project
Pilla Sinha People's Ene
rgy
TA 5000 m3
BIW
Close Point
Nahid-Kabir
By

HFO Tank

23.60

Op
Std 3

en
Flo
nd U

or
er

S
Co

pa
ce
str n
uc
tio

SPL Project Area


Bu n

TBM R.L = 00.00m SPEL Project Area


ild
ing

Fence Line
Fence Line

Property Line

Pil
lar
Legend:
Pil

Property Line
lar

67.68
Dit
c
65.85

h
ROAD Unloading way option- 01
Unloading way option- 02
124.08

4.85
Slope 0.35 Other owners Land

6.07
7.57
9.02

0.92

12.12 7.61
6.23 Unloading Line
Slope1.97
SEL Project Area
49.03

2.84
6.00

Brick Field Area 5.16


6.00

5000 / 3000 m3
6.00

15.6
HFO Tank 1

5.79
42.0
Slope 6

6.09
7.30 SEL Project Area 15.
49
56.0

2
0

4.1
18.44
13.17
56.24

6.89

13.73
4.11

12.71
15.04 Unloading Pipe Other owners Land

Pi

9
lla

8
12.8
6.4
rL

3
4.45

ine
Slope

14.3
13.43 al
Can

7
9.1
Slope

01/B
Part- qm
Area 83S
Unloading way option- 02 8.9
125 Acre
1
Are 0.31
aP Are
66 art-
02 aP
0.1 2.795 /B art-
204.51

28
Unloading way option- 01 64
Ac Sqm
1
0.6 4.18 1/C
0
re 95 3 S
204.49

Are Ac q
re m
17 a Par
3 t-
0.4 4.228 02/C
29
Ac Sqm
re
Can
l a

Ship movement way

Vacant
Pontoon
Jetty
al
Can

20.46 34.84

Canal

Canal

Electric Tower

Line
Electric Transmission

You might also like