Professional Documents
Culture Documents
Costing Short Film Obsesi Kelabu
Costing Short Film Obsesi Kelabu
Costing Short Film Obsesi Kelabu
ESTIMATED
NO ELEMENT BREAKDOWN
(RM)
A PRE-PRODUCTION
RM
ii)PRODUCTION CREW RM
RM
(LIST THE PRODUCTION CREW POSITION RM
RIGHT HERE) RM
RM
RM
SUB TOTAL: RM
iii) TALENT /ARTIST
Main Talent
Usop RM 2000
Muhedi RM 2000 Rm6500
Cikgu Aisyah RM 1500
Ibu Usop RM 1000
1
Extras:
Ah Kia Rm50
Pelajar Rm50 x 20 pax
Cikgu Disiplin Rm50
Lelaki 1 Rm50
Rm1150
SUB TOTAL: Rm
SUB TOTAL: RM
SUB TOTAL: RM
TOTAL RM
CONTINGENCY 10% RM
GRAND TOTAL RM
Remarks:
1. CONCEPT CONSULTATION: If you are not consults any other person or production house for
concept consultation, then this is not necessary to be include in costing/budgeting.
2. Contingency 7% or 10% (maximum) from the whole budget/costing.
3. Technical equipment rental price must base on the actual rental price. Therefore, you have to
get at least 2 price quotations from any rental company to compare the price before make the
final decision to rental equipment. The price quotation should be attached together with your
budgeting.