Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Production Schedule

DATE TIME LOCATION ACTORS PROPS SHOTS

29/10/17 10 AM HOUSE AND ROB


COMPASS
1 - 33

GARDEN AMANDA
SWISS ARMY 101 - 102

DEREK KNIFE 114 - 115

117

2/11/17 12 AM CAR AND ROB


WATCH 33 - 51

ROAD AND AMANDA


51 - 84

FOREST DEREK 130 - 135


4/11/17 ROB 84 - 129

RISK HOW IM GOING TO AVOID THE RISK

FILMING IN THE CAR ENSURE A SEATBELT IS WORN AT ALL TIMES AD


SETTING UP THE CAMERAS BEFORE WE SET
OUT.

FILMING THE FALL ENSURE THERE IS A SOFT GROUND IN WHICH


ROBERT FALLS ONTO. I WILL PACK A MEDICAL
KIT IF CUTS OR SCRATCHES EMERGE.

USING THE SWISS ARMY KNIFE GIVE ROBERT TRAINING ON HOW TO OPEN IT
SAFELY. WE WILL MAKE SURE ITS ALWAYS
CLOSED UNTIL NEEDED IN THE SHOT.

FILMING CIVILIANS THEY MAY NOT WANT TO BE FILMED WHICH


VIOLATES THER RIGHTS SO BEFORE FILMING I
WILL CLEAR THE AREA.

You might also like