Faculty of Engineering
B.Sc. Engineering
Level 2 - Semester 2 (07 Batch)
ADDITIONAL MATERIAL:
Graph sheets available.
INSTRUCTIONS TO CANDIDATES:
This examination accounts for 70 % of the module assessment. The total maximum
mark attainable is 100. The marks assigned for each question & sections there of are
indicated in square brackets.
Assume reasonable values for any data not given in or with the examination paper.
Clearly state such assumptions made on the script.
If you have any doubt as to the interpretation of the wording of a question, make your
own decision, but clearly state it on the script.
All Examinations are conducted under the rules & regulations of the University.
Page 1 of5
,.'
Page 2 of5
Question 1
Specification notes
Question 2
(a) Discuss the facilities that should be provided In a computer- aided
estimating system. (4 marks)
(b) Explain the tasks to be carried out in direct cost estimating. (4 marks)
(d) What are the factors that should be included in a tender evaluation report?
(2 marks)
Page 3 of5
",
(e) List 10 important factors that a contractor should consider in making the
decision to tender for a project. (6 Marks)
(f) Calculate the quantities of the following items of the house shown in
Figure Q1. Assume wall height of 3m and a concrete flat roof. Provide
Data
Cement: Weight of a bag of cement =50kg
Bulk density in bag form =1442kglm3
Man hours
Description
Mason hours unskilled labour hours
Page 4 of5
','j
-- --- -- - ---- ------'''---~
Cost data
Cement - Rs 750/ bag
Sand - Rs 2400/m3
Quarry dust - Rs. 1600/m3
Metal(20mm) - Rs 1800/m3
Water - Free
Rubble - Rs 1400 /m3
Mason (8 hours day) - Rs 800/day
Unskilled labour (8 hours day)- Rs 600/day
":,' .
-',' i
"
....'~-'-'--' "'--7""",
.:'
e
a.3m THK. BRICK WORK
n
1: 3 CEMENT: SAND
~AYER
65mm THK.
II' . zd! CONCRETE LAYER
I m 1)( I I
E If v I COMPACTED EARTH
E
<~1
If)
c "
U
j'-, "\, .:: \ f \,
FOUNDATION DETAIL
1
\. I
""--F;r;0L102 3- ,
\
, \
\ \