Daily System Report For 23/oct/2017 State Load Despatch Center, Airoli (MSETCL) Monday Statement I I Generation (Mus) Ii Exchanges (Mus)
Daily System Report For 23/oct/2017 State Load Despatch Center, Airoli (MSETCL) Monday Statement I I Generation (Mus) Ii Exchanges (Mus)
Daily System Report For 23/oct/2017 State Load Despatch Center, Airoli (MSETCL) Monday Statement I I Generation (Mus) Ii Exchanges (Mus)
2 of 6
State Load Despatch Center,Airoli (MSETCL) Annexure-2
Hourly Load Data As on 23/Oct/2017
1 4644 61 275 4980 346 3578 0 0 4962 4708 -1360 12252 0 12252 2317 14569 49.95
2 4310 66 286 4662 391 3578 0 0 4656 5092 -1186 12537 0 12537 2143 14680 49.93
3 4255 66 275 4596 418 3580 0 0 4622 4762 -1061 12295 0 12295 2019 14314 49.97
4 4317 61 275 4653 430 3585 0 0 4692 4728 -983 12414 0 12414 1940 14354 49.95
5 4417 66 276 4759 435 3633 0 0 4690 4861 -944 12743 0 12743 1901 14644 49.97
6 4666 66 286 5018 391 3767 0 0 5145 5315 -998 13493 0 13493 1955 15448 49.92
7 4967 60 276 5303 384 4024 0 9 5793 4992 -1046 13667 0 13667 2020 15687 49.94
8 4921 70 277 5268 337 4115 0 83 5626 5717 -1124 14396 0 14396 2149 16545 49.96
9 4631 186 275 5092 262 3846 0 214 5758 6151 -1338 14227 0 14227 2566 16793 49.93
10 4761 340 282 5383 355 3894 0 331 5740 5895 -1430 14428 0 14428 2827 17255 49.89
11 5095 230 271 5596 397 4246 0 400 5997 5842 -1745 14736 0 14736 3137 17873 49.93
12 5092 65 267 5424 364 4314 0 442 6579 6377 -1553 15368 0 15368 3166 18534 49.94
13 5063 65 266 5394 265 4261 0 445 6550 6465 -1505 15325 0 15325 3156 18481 49.94
14 5019 65 255 5339 225 4409 0 425 6060 6342 -1445 15295 0 15295 3087 18382 49.96
15 5087 206 263 5556 222 4467 0 343 6120 6134 -1359 15363 0 15363 3120 18483 49.94
16 5241 149 266 5656 197 4512 0 270 6150 6088 -1342 15381 0 15381 3128 18509 49.94
17 5297 264 265 5826 205 4521 0 137 5729 5810 -1280 15219 0 15219 3069 18288 49.89
18 5351 214 269 5834 177 4450 0 25 5232 5272 -1182 14576 0 14576 2960 17536 49.94
19 5361 259 270 5890 204 4509 0 0 5700 5492 -1200 14894 0 14894 2965 17859 49.94
20 5412 166 274 5852 191 4520 0 0 5941 5724 -1222 15065 0 15065 2875 17940 50.01
21 5467 99 274 5840 214 4419 0 0 5895 5401 -1503 14370 0 14370 2763 17133 50.03
22 4812 171 274 5257 274 4129 0 0 5615 5713 -1469 13904 0 13904 2580 16484 50.00
23 4724 84 285 5093 358 3983 0 0 5237 5501 -1329 13605 0 13605 2529 16134 49.96
24 4669 69 276 5014 296 3979 0 0 5167 5028 -1335 12982 0 12982 2424 15406 49.93
117.5
MUs 3.15 6.56 127.28 7.34 98.32 0.00 3.12 133.66 133.41 -30.94 338.53 0.00 338.53 62.80 401.33 49.95
8
NOTE : ALL VALUES IN MW
Mumbai Net Exch is shown with reference to MSETCL system and (-) sign indicates MSETCL periphery to Mumbai system.
3 of 6
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 23/Oct/2017
Position as on 6.30 Hrs of 24/Oct/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date
PLANNED OUTAGE
MSPGCL Chandrapur Unit 3 210 12/09/2017 00.00 23/10/2017 23.40 Coal Shortage
MSPGCL Uran Unit 7 108 05/10/2017 00.06 Continued. Gas Turbine Work
MSPGCL Uran Unit B0 120 05/10/2017 00.11 Continued. Gas Turbine Work
Problem in submerged
IPP RPL(AMT) U-1 270 06/10/2017 00.45 Continued.
Scrapper chain. (Coal
4 of 6
State Load Despatch Center,Airoli (MSETCL) Statement-VI
Details of Generating Unit Outages/Trippings for 23/Oct/2017
Position as on 6.30 Hrs of 24/Oct/2017
Generating Name of Generating Unit Capacity Tripped Tripped Sync.Date Sync. Time Reason of Outage Expected
Company Date Time Date
shortage)
MSPGCL Parli Unit 6 250 14/10/2017 17.04 Continued. zero schedule by msedcl.
MSPGCL Nasik Unit 5 210 14/10/2017 21.05 Continued. zero schedule by msedcl.
Flame Failure Converted
IPP RPL(AMT) U-4 270 16/10/2017 14.47 Continued. into zero schedule.(21.30
hrs. Dt 16-10-2017)
IPP RPL(AMT) U-2 270 18/10/2017 02.57 23/10/2017 03.34 zero schedule.
aph support bearing
IPP Adani U-2 660 18/10/2017 05.58 Continued. abnormal sound and oil
leakage.
Zero Schedule By
MSPGCL Parli Unit 8 250 18/10/2017 22.18 23/10/2017 06.03
MSEDCL
MSPGCL Chandrapur Unit 5 500 20/10/2017 18.40 Continued. Boiler Tube Leakage
MSPGCL Chandrapur Unit 6 500 21/10/2017 19.25 Continued. Boiler Tube Leakage
MSPGCL Khaparkheda Unit 4 210 24/10/2017 02.52 Continued. Boiler Tube Leakage
5 of 6
State Load Despatch Center,Airoli (MSETCL) Statement-VII
Details of Line outages/Trippings for 23/Oct/2017
Position as on 6.30 Hrs of 24/Oct/2017
Name of Line Inter State / Tripped Tripped Sync. Date Sync. Outage Reason of Outage
Intra State Date Time Time Type
Kharghar Trombay IntraState 23/10/2017 07.10 23/10/2017 07.26 T tripped only from end.
Padghe - Jindal IntraState 23/10/2017 07.25 Continued. T 766 line crossing work.
Talandge-Hamidwada IntraState 23/10/2017 10.05 23/10/2017 16.42 PO ct Oil Leakage Attending work.
Karad(400kv) -Mudshingi Ckt 2-Tak IntraState 23/10/2017 10.15 23/10/2017 16.25 PO Routine Maintenance Work
Malharpeth - Karad(400kv) IntraState 23/10/2017 10.36 23/10/2017 15.09 EO Attending Hot Spot
Padegaon-Sawangi IntraState 23/10/2017 15.30 23/10/2017 18.13 PO To attend red hot on CB.
Tata Borivli MSETCL Borivli 5 IntraState 23/10/2017 15.40 Continued. EO Attending Hot Spot
HT : Hand Tripping, MT : Multiple Tripping, T : Tripping, PO : Planned Outage, EO : Emergency Outage, OO : Opportunity Outage