Professional Documents
Culture Documents
Urban Plan Strategy Final
Urban Plan Strategy Final
I. ................................................. 1
II. 4
- .................... 20
1. ....................................... 20
1.1. .............................................................. 20
1.2. ..................... 23
1.3.
/Trend Analysis/ ........................................................................................ 25
1.4 ........................ 31
2. ....................................... 32
2.1. ................................................................. 32
2.2. ................... 84
2.3. /Trend
Analysis/ .................................................................................................. 105
2.4 ....................... 107
3. ................................. 109
3.1. .......................................... 109
3.2. ................ 113
3.3. /Trend
Analysis/ .................................................................................................. 115
3.4 ................ 117
4.
................................................. 118
4.1. ........................................ 118
4.2. ................................................................... 122
4.3. ......................................................................... 123
4.4. ............................................................................. 124
4.5. ............................................................ 124
4.6. ... 125
4.7. ............................... 127
5. .................... 128
5.1. ....................................................................................... 128
5.2. ................................................................................. 128
5.3. ................................................................................. 128
- .............. 130
1. / .................. 130
2. ... 135
3. / ............ 151
3.1. 152
3.2. ............................................ 154
4.
............................. 156
4.1. 157
4.2. .............. 158
5. 162
5.1. ................................................................. 162
5.2. ..................................................... 164
5.3. ......................................................... 165
- .. 167
1. ............... 167
2. .............. 167
3. .......... 168
4. ................... 169
-
............................................. 170
1. ................. 170
2.
....................................................
................................................. 171
III. ............................................ 174
- .................... 176
............................................ 177
I.
-
|
... 1886.
(pattern)
(Techeste, 19861
Abercrombie,195656 )
(Techeste, 19866-
7)
-
( 14)
1979 .
( )
-
... 2009 .
(UN, 2010) 40
17
(2003 2007)
II.
... 2009 .
(UN, 2010)
40 17
2.1
17
2.2.
2.3
1
(Local
Economic Development)
/
(informal sector)
90
-
(environmental sustainability)
/
1999 .
29.2 7
100,000
10
() (Land Fill sites)
2.4
11
50%
/
(Mixed Landuse)
150,000
500
12
3
146
(Growth Corridors)
(Growth Pole)
13
750
(Local Development Plan)
2.5
(Ethiopias Climate - Resilient
Green Economy Strategy)
14
(Urban Design)
/
15
(proportion)
(urban transition)
(17%)
16
2.6
47/67
()
(/)
17
2.7
18
-
/
19
1.
1.1.
1950
12,000,000 12,000
12,000 15,000
110,000
1500 1200
(
)
20
(Urbanization Promotion Area)
(Urbanization Control Area)
21
/
/
/
/
6
/ /
(compact shape)
22
1.2.
/
2003 .
62
(
)
...
23
-
2.5 ..
5 ..
-
24
1.3.
/Trend Analysis/
38/1997
1999 /
...
/..../
e G< [e vK 1:2,000,000' 1:1,000,000 1:250,000 Se` SL G]~ T>g<
KSW[ ^ "`- }c`}M:: =IU K ?c=<
}K G^ MT p S`H w` KS T>[ vK 1:50,000 Se` ^ "` uS^ L
c=J e G< G]~ 8 KT LDM::
125,000 110,000
....
25
26
574/2000
147/1999 6
2
27
....
691/2003
750
28
317/1979
38/1997
1999 /. 120
1999. /
-
2003 / /
/
21/2003 ..
29
24
()
/
bqE yzmE t&Kl!
mC xQRT WSNnT bm bflgW m-N F_nT yzRN FT T
30
1.4
31
2.
2.1.
2.1.1.
/
-
(output)
(Structure Plan)
(Local Development Plan) (Basic
Plan) |
-
. (Structure Plan)
574/2000
10
32
20,000
(rigid)
/
(flexible)
. (Basic Plan)
20,000
-
/
( - )
33
- (maps/graphic
documents)
-
(Text Report)
(proposals)
(phasing)
2.1.2.
34
1.
2.
3.
4.
5.
6.
7.
35
8.
9.
10.
2.1.3.
36
-
/ .
-
-
37
(
, 2004)
( )
(archaeological)
. -
-
/
38
/ ../
-
/10 /
(Influence Area)
(slope)
- -
39
-
- ( )
40
/ /
/
/
( )
41
20 25
2.1.4.
/
/
/
/
20,000
42
20
7
/ /
3
20
20
/
43
2.1.5.
20 25
(pure residence)
(mixed use)
44
40 60
(
)
( )
45
20
6 12-30 ( 2-5
)
80
150
200 600 (net
density)
46
510
1020
(Central
Business District)
(neighborhood)
/Block corners/
47
/Central Business District/
/ATM/
48
/Primary market/
711
/Secondary market/ 46
2.57
49
0.51
/Cattle market/
/Primary market/
2.17 7000
/Secondary
market/ 1.17-1.51 5060
/Tertiary market/ 0.620.83
3040
/Local market/ 0.42 1520
50
(
)
10
20
(small towns) (middle towns)
(large towns) 5-10
/ 10-20
(
)
-
-
/
51
- -
(catchment area)
4-6
- -
100
- 70-175
- 500-3000
7-14
1-8
(catchment area)
100
1.5 2.5
52
15-16 9-
10
100
3-6
17-18
11-12
3-5
2.5-6
17-18
10
3-5
100
2.5-6
53
/Health Center/
60000
54
100000 40,000
15,000
1,000,000
1,500,000 3,500,000 5,000,000
30000
/2004
./ /
2-8
10
/Play lot/ /Playground/
/ Kebele level football field/
/Woreda level football field/ /Zonal level
football /stadium/ /National level football
stadium/
1
1
1992 .
55
56
(neighbourhood)
/
/ (buffer zone)
57
(Urban Macro Climate)
9
15-25%
58
2.5-5
25,000-30,000
2 0.80
5.38 3.38 ..
100 /green buffer strip/
20
10 /slope/
10
/slope/
/Recycling/
59
100,000
50-120 300
1-1.5
400
800 4-5
4,000 5,000
15-20 4
150 1000
240
2,000
60
/
(//)
2 .. (
)
/
2500 - 5000 .
2.5-5 .
61
62
/
/ /
/
. /
63
/
/
/
(
)
/ /
500-2,500 .
5,000-10,000 .
64
10,000-15,000 . /
(
)
500 ..
500-5,000 ..
5,000-10,000 ..
( )
65
(/
) 150
1,100 ..
/
( )
(Industrial park) /
66
67
/Block corners/
/Parking/
/Parking/
68
15-25
/Principal Arterial/
/Sub-Arterial/ /Collector road/
/Local road/
(express way)
/Principal Arterial/
/Sub-Arterial/
69
/Collector road/
/Local road/
/Core areas, Intermediate Zone, Expansion Areas /
/Principal Arterial/ 30 -120
/Sub-Arterial/ 20 - 25
/Collector road/ 11 - 20
/Local road/ 4 - 12
/Principal Arterial/ 1.5
/Sub-Arterial/ 0.8-1.5
/Collector road/ 300-800
150
/Road Junction/
T-
Junction / /, Cross-
Junction / /, Multiple-Junction/Grade-separated-
Junction / / Round Abouts
// Junction
70
Junction
Junction
90
3
Junctions 500
Junctions
Junctions
Round Abouts
80
/Density/
/Slope/
15
/Area/
15-22 12
(Legend)
71
15-20
2.5
2.3
/
/Principal arterial/
3.5 - 5
7-10 /Sub-
arterials/ 2.5 - 4 5-8
2 4
Urban motorway
2 5
20 5 50 3.5
72
2.25 /
/Motorized Transportation/
0.37- 0.61 0.63- 1.02
1.04- 1.82 1.86- 2.67
5
73
0.48-0.9 1.03-
1.6 1.63-3.0 3.73-4.40
/
/
/ /
/Parking/
/On street parking facilities/
/Off-street parking facilities/
/restricted/ /unrestricted/
/
74
10
5
40
5
2
40
60
14.75 /2.5 x 5.9 /
/Principal
and sub arterial roads / 40 60 /
/Collector roads/ 30 /
/Local roads/ 20 30 /
/Utilitites/
75
/
/
15 (cesspools)
76
45 1.5
0.7 1
100 150
80
0.4 450 0.4
400 15
600
50
0.4 800
15 850
0.4
550 500 15
600
0.4 15
250 250
400 15
300
77
200
300
50
200 5
32 (Buffer Zone) 330-500
10 220-330
8 150-200 . 6 110-150 . 5
35-110 . 4 20. 2
470 550
0.4 /
50
100
30
0.5
20 100
100 1.5
0.5
1
0.7
78
(sub-stations)
/ /
50
40
50
450 550
80
1
30
15
45
manholes 200
chambers or cable vaults/trenches
//
1.25 basements
2 2.5
1.5
1 Manholes
150
79
/ /
(dump site or
sanitary landfill)
(Buffer)
/
(Buffer)
80
(
)
(community & public toilets)
/ /
. /Special Functions/
(Special
Function)
( )
(
) (
.) - -
( .)
15-20
81
-
- -
2.1.6.
. - -
82
/ /
. /Phasing Plan/
83
2.2.
2.2.1.
691/2003
84
750
...
85
/
/
..
86
(Evironmental Issues)
2.2.2. /
/
87
574/2000
56 2
57 1
574/2
88
89
2.2.3.
1999. /
2003 / / /
lW ysW
`YL BT SB_RM k dL bflgW dr Y YgL
b!W lKLlC ktC
yxQM GN yg# |CN lkwN ySCl# WSN q$q$C yt&Kl!
mC bmn# lktC KLlC kt PN ZGJT xf[M Y xSt"
90
61
50
/
bqE yzmE t&Kl!
91
/
/
92
50
7
2.2.4.
(LDP)
93
/ /
/
2003.
62
/
94
/ /
/Taylor & Williams,
1982 :26 and 27/
/ / -
95
20
/ /
45 4
/ /
4
45
/
//
96
//
( )
-
2.5 .
5 .
- -
97
/
/
/ /
98
-
1
30
25
... 2004 ..
2015 /
225,000 (UNHABITAT,
2010)
2002 /
200,000
99
-
/
/
100
-
/
/
- ( )
/
(buffer zone)
/Network/
101
/ /
/
/accessibility//
/
102
(Special Functions) -
2.2.5.
103
104
2.3.
/Trend Analysis/
/ /Trend/
//
105
/area/
/hatching/
106
GIS, IT, Documentation Audiovisual
/
hard copy soft copy
/
2.4
107
/Major Land Use Functions/
/
/
108
/ scheme /
3.
3.1.
/ -
/
(urban renewal)
109
41 (Urban Renewal)
(structures)
43 (Urban Upgrading)
/
/
-
/ (
)
110
.
20,000
100,000
/ (parcellation)
111
/
/
112
3.2.
113
/ /
/Spatial/
-
(Zoning change)
114
3.3.
/Trend Analysis/
115
2000 .
1994 ..
42
(LTPA, 2010: 23)
( )
/ /
116
(paradigm shift in urban
planning)
3.4
1. /
2.
3.
(Urban Design)
4.
/
/
5.
6.
117
/
7.
8.
9.
10.
4.
4.1.
(paradigm shift)
- 43 2 89
6
118
? ?
/
/
?
/ /
119
(FUPI, 2009)
/
/
(Proposal)
120
/
(facilitators)
121
4.2.
122
-
-
4.3.
123
(Database Management System)
4.4.
( )
/
/
( 100000 )
/
4.5.
124
/
/
4.6.
125
yL kt LT NSTK>N n!St&R
126
4.7.
127
5.
5.1.
5.2.
5.3.
128
/Compact settlement/
129
/ -
/
1. /
130
/Major Land Use Functions/
131
(Urban Design)
/
/scheme/
132
/
/
133
134
2.
1)
1.1.
135
1.2.
1.2.1.
136
S
I
un w
1.2.2.
20,000
20,000
GNNS Receivers GPS
137
GIS
/Architect or Urban Planners, Surveyors, Draft Persons/
1.2.3.
K
vu=
e` T
u T> a ::
nkU
/
2)
138
62
/
/ / -
- -
2.1.
139
2.1.1.
2.1.2.
2.1.3.
140
(Revenue basis)
141
2.1.4.
2.2.
/ /
/ /
/ / -
142
2.2.1.
/
/
/
2.2.2.
143
2.2.3.
2.2.4.
2.2.5.
144
/ /
/
2.2.7.
145
2.2.8.
2.2.9.
(
)
/
/
146
2.3.1.
/
/
/accessibility//
2.3.2.
147
intersections
/Parking/
148
2.3.3.
149
/Neihgbourhood
plan/
2.3.4.
150
3. /
/
/
/
/
/
151
3.1.
3
/
/
3.1.1.
152
/ /
3.1.2
/
/
153
3.2.
/ /
3.2.1
3.2.2
154
3.2.3
/ /
155
4.
156
4.1.
4.1.1.
4.1.2.
157
4.2.
4.2.1.
/
(paradigm shift)
158
4.2.2.
/ 14
-
/
4.2.3. /
/
(Municipal Level)
(Grassroot Level)
/ /
159
( )
/
4.2.4. / (Facilitators)
/ (Facilitators) /
(Facilitators)
(facilitation)
4.2.5.
/
(LDP)
160
(interactive discussions)
/
/
4.2.6.
(Participation Manual)
4.2.7.
()
161
5.
5.1.
5.1.1
162
5.1.2 -
/ -
163
/ /
/
5.2.
5.2.1
20,000
20,000
GNNS
Receivers GPS
164
GIS
/Architect or Urban Planners, Surveyors, Draft Persons/
5.2.2.
(Database
Management System)
5.3.
165
//
166
1.
2.
167
/ /
/
/ /
/
3.
2006 /
168
4.
/ /
/ /
169
1.
/ /
170
2.
171
/
/
172
173
III.
- -
- -
174
()
175
1 2004.
3
/
2 2004.
3
3 2004.
4
4 2004.
4
5 2006
.
6
176
Federal Urban Planning Institute ( FUPI)(2009). Participation Manual for Urban Planning, Ministry of
Urban Development and Construction, Addis Abeba
Federal Urban Plann Coordinating Bureau ( FUPCB)(2011). Manual on Stamdard and Norms for Urban
Planning (Draft Manual), Ministry of Urban Development and Construction, Addis Abeba
Lyon Town Planning Agency (LTPA) (2010). Evaluation of the Master Plan (2001-2010), Addis Abeba,
City Government of Addis Abeba, Addis Abeba.
Office for the Revision of the Addis Ababa Master Plan (ORAAMP)(2000). Assessment of Addis
Ababas Housing Sector, Key Areas of Intervention, Strategies &Policy Measures for a Housing
Policy, (Draft report), Addis Ababa.
-----------------------(2000). Summary Report on the Urban Transport and Road Network of Addis Abeba
-----------------------(2002). Project Proposal for Addis Ababa Transport Sector, Municipality of A.A, Addis
Ababa.
-----------------------(2002). Addis Ababa City Road Network (Final Draft), Addis Abeba.
177
Taylor, J.L and Williams, D.G. (1982). "Problems and Issues in Asian Urban Areas-and the Response of
Planning Practice", in J.L.Taylor and D.G. Williams(eds.) Urban Planning Practice in Developing
Countries, Pergamon Press, G. Britain.
Techeste Ahderom (1986). Basic Planning Principles and Objectives Taken in the Preparation of the
Addis Abeba Master Plan, Past & Present, a paper presented to the International Symposium on
the Centenary of Addis Abeba, Addis Abeba.
(http://esa.un.org/unpd/wup/index.htm)
/ (1997E.C).
(2000). .
574/2000
--------------------------------(2003E.C).
/ -
(2003-2007)
178