I.O.C.L Combined Foundation of Boiler & Deaerator & Conveyor-Layout1
I.O.C.L Combined Foundation of Boiler & Deaerator & Conveyor-Layout1
I.O.C.L Combined Foundation of Boiler & Deaerator & Conveyor-Layout1
3950 830
1135
970
830
9700 7000
550
550
This drawing read in conjunction with
R4 1225 1830
JB0996-50990100-STR-01 and
B0996-50990100-FLD-02
3950
3950
6500
6500
830 830 830
F1
550
550
550
1585
1060 1995
1415
550 550
2T20+2T16
7500
800
3 7000 7000
1 100 100
100
3400 1500 2000
T16-200 CONVEYOR FOUND. TIE BEAM PLAN CONVEYOR TIE BEAM PLAN 2T20+2T16
2000
T16-150
1500
T16-200
@ which level? @ (+)2.70
50 THK.
STEELCOL. STEELCOL.
900
4300
200
LVL.+0.25 Level ? LVL.+0.25
250
225
T12-200
1900
R3
T8-200 T8-200
400
400
400
150
2000 LVL.-0.3 250
T16-120 N.G.L/E.G.L 200
1350
150 150 3T16
6500
1100
150
1700
7150 2 900
100THK. 100THK.
250
Foundation design shall be provided. PCC.1:4:8 PCC.1:4:8
3T16
MIN. 3 RINGS
850
2LT10-100 4
1250
1250
AS/PLAN
T16-200 2T12 MIN. 3 RINGS
300
300
300
R4
TYP.
900
150
T20-140
8350
750
3000
1250
2500
T20-180
T25-180 1-1
CF-4 foundation
2200
11200
8300
RCC.COL.
1800
AS/SWAS ROOM
FOUNDATION
500
FILLING
3000
900
LVL.-3.30
AS/PLAN SEC.2-2
2T12 2T12
Z
3400
KEY PLAN
750
X
LVL.-3.30
CF2
AS/PLAN
APPROVED
A Releasedistributionprints.
7000
9700 5250 6200 6800
APPROVEDWITHCOMMENTS
B Proceedwithfabrication/manufacture/
constructionconsideringcomments
155
LONGI.REINF- 14T25 T10-100
150 530 150
This foundation is under hold. C
NOTAPPROVED
Correcttheoriginaldrawingduly
Incorporatingourcommentsandresubmit
Digitally signed by Neeraj Dwivedi
DN: cn=Neeraj Dwivedi, o=STEAG
ISOLATED FOOTING SCHEDULE TIES- 4SETS(1a+1b+1c+1d) T10-100
Energy Services India Pvt. Ltd., ou, REINFORCEMENT T10-100
Please incorporate the cleated
forapproval/information.
d
550
240
email=nk.dwivedi@steag.in, c=IN FOOTING
Date: 2017.10.18 18:40:25 +05'30' S. NO. SIZE OF D BOTTOM TOP
MARKS
conveyor column (DUCON)
ETG043-ISGEC-5-C-17-280
FOOTING ALONG X AXIS. ALONG Z AXIS. ALONG X AXIS. ALONG Z AXIS.
c
155
D
INFORMATIONNOTED 1. CF4 11200X8350 900 AS/PLAN AS/PLAN AS/PLAN AS/PLAN a b
Informationfurnishedinthedrawingis
noted.
2. CF5 AS/PLAN 750 AS/PLAN AS/PLAN AS/PLAN AS/PLAN CONVEYOR PEDESTAL- 830X550
3. CF6 4000X5000 750 AS/PLAN AS/PLAN AS/PLAN AS/PLAN
( ) TOP R/F
INFORMATIONNOTED
H Informationfurnishedinthedrawingis ( ) BOTTOM R/F
noted.
1. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN M.
2
4. SAFE BEARING CAPACITY IS TAKEN 18 T/M