3950

3950 830

1135
970
830
9700 7000

550

550
This drawing read in conjunction with
R4 1225 1830
JB0996-50990100-STR-01 and
B0996-50990100-FLD-02

3950
3950

6500
6500
830 830 830
F1

550
550

550
1585
1060 1995

1415
550 550
2T20+2T16
7500

155 240 155 LVL.+2.70


TOC.

800
3 7000 7000
1 100 100

100
3400 1500 2000

T16-200 CONVEYOR FOUND. TIE BEAM PLAN CONVEYOR TIE BEAM PLAN 2T20+2T16

2000
T16-150
1500

T16-200
@ which level? @ (+)2.70

50 THK.
STEELCOL. STEELCOL.

900
4300

200
LVL.+0.25 Level ? LVL.+0.25

250

225
T12-200

1900
R3
T8-200 T8-200

400

400

400
150
2000 LVL.-0.3 250
T16-120 N.G.L/E.G.L 200

1350
150 150 3T16
6500

1100
150

1700
7150 2 900
100THK. 100THK.
250
Foundation design shall be provided. PCC.1:4:8 PCC.1:4:8
3T16

MIN. 3 RINGS
850
2LT10-100 4
1250

1250

AS/PLAN
T16-200 2T12 MIN. 3 RINGS

300

300

300
R4

TYP.

900
150
T20-140
8350

750
3000

X-370.29 T16-200 300 300 300 300 300 300


Y-840.78 T25-180 LVL.-3.30
300 300
This SWAS room AS/PLAN
AS/PLAN
1250 1250 foundation also to
T20-200 SEC.3-3
be merged with
1250

1250

2500

T20-180
T25-180 1-1
CF-4 foundation
2200
11200
8300

RCC.COL.

6500 This foundation


can be merged

1800
AS/SWAS ROOM
FOUNDATION

RCC.COL. with CF-4

500
FILLING
3000

900
LVL.-3.30

AS/PLAN SEC.2-2
2T12 2T12
Z
3400

KEY PLAN

750
X
LVL.-3.30
CF2

AS/PLAN
APPROVED
A Releasedistributionprints.



7000
9700 5250 6200 6800
APPROVEDWITHCOMMENTS
B Proceedwithfabrication/manufacture/
constructionconsideringcomments

I.O.C.L COMBINED FOUNDATION OF BOILER & DEAERATOR & CONVEYOR


andresubmitforapprovalandstamping.


T10-100
830

155
LONGI.REINF- 14T25 T10-100
150 530 150
This foundation is under hold. C
NOTAPPROVED
Correcttheoriginaldrawingduly
Incorporatingourcommentsandresubmit
Digitally signed by Neeraj Dwivedi
DN: cn=Neeraj Dwivedi, o=STEAG
ISOLATED FOOTING SCHEDULE TIES- 4SETS(1a+1b+1c+1d) T10-100
Energy Services India Pvt. Ltd., ou, REINFORCEMENT T10-100
Please incorporate the cleated
forapproval/information.
d

550
240
email=nk.dwivedi@steag.in, c=IN FOOTING
Date: 2017.10.18 18:40:25 +05'30' S. NO. SIZE OF D BOTTOM TOP
MARKS
conveyor column (DUCON)

ETG043-ISGEC-5-C-17-280
FOOTING ALONG X AXIS. ALONG Z AXIS. ALONG X AXIS. ALONG Z AXIS.
c

155
D
INFORMATIONNOTED 1. CF4 11200X8350 900 AS/PLAN AS/PLAN AS/PLAN AS/PLAN a b
Informationfurnishedinthedrawingis
noted.
2. CF5 AS/PLAN 750 AS/PLAN AS/PLAN AS/PLAN AS/PLAN CONVEYOR PEDESTAL- 830X550



3. CF6 4000X5000 750 AS/PLAN AS/PLAN AS/PLAN AS/PLAN

( ) TOP R/F
INFORMATIONNOTED
H Informationfurnishedinthedrawingis ( ) BOTTOM R/F
noted.


1. ALL DIMENSIONS ARE IN MM. ALL LEVELS ARE IN M.

2
4. SAFE BEARING CAPACITY IS TAKEN 18 T/M

6. ALL ISOLATED FOOTING SHALL BE PLACED W.R.T COLUMN AXIS.