Electrik

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 33

Tanggal 05 Oktober 2017

Tanggal dibutuhkan 05 November 2017

No Kode Barang Nama Barang

1 Hydraulic Motor GM 454 BD 47

2 08.097.0002802 Seal Kit Hydraulic Motor GM 454 BD 47

3 08.097.0006959 Seal Kit Cylinder Lock 80 / 50-225 ; P/N 02-78744


4 Seal Kit Cylinder pintu for M3000- 100(70) -600

Seal kit cylinder drawbridge ( jembatan) for M3000-


5
100(70)762

6
Seal kit cylinder SKC7143 EV
7 2.12.115.016903 Taping Conector 70 mm

8 Seal oli 65 x 90 x 7

9
Seal oli 150 x 180 x 14
10 Custommer kabel 70 mm double bolt
11 2.12.115.016264 Isolasi Nasional/ unibel

Cylinder pneumatic type magtek SU 80 x 200 c/w


12 E/P Positioner autonic model number ATP-1000LDM
23, Supply pressure 1,4-7 kgf/cm
Catatan :

Diminta Oleh

Chandra Andrika
Ast. Maintenance
REQUEST ORDER
No : 0347/RO/SSS-SGM/X/2017

Stock
Spesifikasi SAT Kebutuhan Gudang

Hydraulic Motor GM 454 BD 47 UNIT 1

Seal Kit Hydraulic Motor GM 454 BD 47 SET 2

Seal Kit Cylinder Lock 80 / 50-225 ; P/N 02-78744 PCS 3


Seal Kit Cylinder pintu for M3000- 100(70) -600 PCS 3

Seal kit cylinder drawbridge ( jembatan) for M3000-


PCS 3
100(70)762

PCS 2
Seal kit cylinder SKC7143 EV
Taping Conector 70 mm PCS 12

Seal oli 65 x 90 x 7 PCS 4

PCS 4
Seal oli 150 x 180 x 14

Custommer kabel 70 mm double bolt PCS 12


Isolasi Nasional/ unibel PCS 25

Cylinder pneumatic type magtek SU 80 x 200 c/w


E/P Positioner autonic model number ATP- UNIT 1
1000LDM 23, Supply pressure 1,4-7 kgf/cm

Diketahui oleh

Hafid
Askep
Unit Usaha : PT. SAWIT SUMBERMAS SARANA
Unit Kerja : PKS SELANGKUN

Permintaan disetujui Keterangan

U/ Penggantian undertow no 4 , kebutuhan di bulan


1
November

2 U/ Penggantian undertow, kebutuhan di bulan November

U/ Penggantian lock transfer carriage no 1, kebutuhan di


3
bulan November
U/ Penggantian di pintu hopper no 2, kebutuhan di bulan
3
November
U/ Penggantian di jembatan rebusan no 1-2, kebutuhan di
3
bulan November
U/ Penggantian di undertow no 8, kebutuhan di bulan
2
November
U/ Penggantian jalur kabel domestik, kebutuhan di bulan
12
November
U/ Penggantian di undertow no 8,7,6,dan 3, kebutuhan di
4
bulan November
U/ Penggantian di undertow no 4,5,6, dan 7, kebutuhan di
4
bulan November
U/ Penggantian jalur kabel domestik, kebutuhan di bulan
12
November
25 U/ Alat bantu kerja, kebutuhan di bulan November

U/ Penggantian di pneumatic pendulum, kebutuhan di bulan


1
November

Disetujui Oleh

Irwansyah P. Pulungan
Mill Manager
Tanggal 05 Oktober 2017
Tanggal dibutuhkan 05 November 2017

No Kode Barang Nama Barang

1 Flexible hose R2AT 3/4 inch x 100 (0-0) NU

2 Flexible hose R2AT 3/4 inch x 100 (0-90) NU

3 Flexible hose R2AT 1/2 inch x 100 (0-0) NU


4 Flexible hose R2AT 1/2 inch x 100 (0-90) NU

5 Flexible hose R2AT 1/2 inch x 70 (0-0) NU x Mz

Flexible hose R2AT 3/8 inch x 100 (0-0) 1/2" NU x 12


6
Mz
Flexible hose R2AT 3/8 inch x 100 (0-90) 1/2" NU x
7
12 Mz

8 2.12.115.016993 Timer Omron 8 Kaki H3CR-A8 24-48VD

Micrometer merk EINHILL uk, 0-25mm

Catatan :
Diminta Oleh

Chandra Andrika
Ast. Maintenance
REQUEST ORDER
No : 0348/RO/SSS-SGM/X/2017

Stock
Spesifikasi SAT Kebutuhan Gudang

Flexible hose R2AT 3/4 inch x 100 (0-0) NU PCS 1

Flexible hose R2AT 3/4 inch x 100 (0-90) NU PCS 1

Flexible hose R2AT 1/2 inch x 100 (0-0) NU PCS 1


Flexible hose R2AT 1/2 inch x 100 (0-90) NU PCS 1

Flexible hose R2AT 1/2 inch x 70 (0-0) NU x Mz PCS 1

Flexible hose R2AT 3/8 inch x 100 (0-0) 1/2" NU x


PCS 1
12 Mz
Flexible hose R2AT 3/8 inch x 100 (0-90) 1/2" NU x
PCS 1
12 Mz

Timer Omron 8 Kaki H3CR-A8 24-48VD PCS 8

Micrometer merk EINHILL uk, 0-25mm PCS 1


Diketahui oleh

Hafid
Askep
Unit Usaha : PT. SAWIT SUMBERMAS SARANA
Unit Kerja : PKS SELANGKUN

Permintaan disetujui Keterangan

U/ Penggantian di undertow no 1 dan 2, kebutuhan di bulan


1
november
U/ Penggantian di undertow no 4 dan 5, kebutuhan di bulan
1
november
U/ Penggantian Penggantian di undertow no 8, kebutuhan di
1
bulan november
U/ Penggantian Penggantian di undertow no 8, kebutuhan di
1
bulan november
U/ Penggantian di station loading ramp, kebutuhan di bulan
1
november
U/ Penggantian di sterilizer no 1, kebutuhan di bulan
1
november
U/ Penggantian di sterilizer no 2, kebutuhan di bulan
1
november
U/ Penggantian di press,limbah dan clarifikasi, kebutuhan di
8
bulan november

1 U/ Alat bantu kerja electrik, kebutuhan di bulan november


Disetujui Oleh

Irwansyah P. Pulungan
Mill Manager
Tanggal 05 Oktober 2017
Tanggal dibutuhkan 05 November 2017

No Kode Barang Nama Barang

1 Bearing 6024

2 Bearing NJ213 E

Catatan :
Diminta Oleh

Chandra Andrika
Ast. Maintenance
REQUEST ORDER
No : 0349/RO/SSS-SGM/X/2017

Stock
Spesifikasi SAT Kebutuhan Gudang

PCS 4

PCS 4
Diketahui oleh

Hafid
Askep
Unit Usaha : PT. SAWIT SUMBERMAS SARANA
Unit Kerja : PKS SELANGKUN

Permintaan disetujui Keterangan

U/ Penggantian di undertow no 8,kebutuhan di bulan


4
November
U/ Penggantian di undertow no 8,7,6 dan 3,kebutuhan di
4
bulan November
Disetujui Oleh

Irwansyah P. Pulungan
Mill Manager
Tanggal 16 Oktober 2017
Tanggal dibutuhkan 16 November 2017

No Kode Barang Nama Barang

1 kabel NYY 4x6mm

2 Pipa PVC 2"

2 Elbow PVC 2"


2 Mist Separator 300-10A

Catatan :

Diminta Oleh

Chandra Andrika
Ast. Maintenance
REQUEST ORDER
No : 0352/RO/SSS-SGM/X/2017

Stock
Spesifikasi SAT Kebutuhan Gudang

MTR 300

PCS 13

PCS 4
PCS 3

Diketahui oleh

Hafid
Askep
Unit Usaha : PT. SAWIT SUMBERMAS SARANA
Unit Kerja : PKS SELANGKUN

Permintaan disetujui Keterangan

U/ Penggantian kabel listrik pada pompa kondensat No. 1 dan


300
2 (upgrade pompa c/w elektromotor). (urgent)
U/ Pengaman kabel listrik pada pompa kondensat No. 1 dan 2
13
(upgrade pompa c/w elektromotor). (urgent)
U/ Pengaman kabel listrik pada pompa kondensat No. 1 dan 2
4
(upgrade pompa c/w elektromotor). (urgent)
3 U/ Penggantian di compressor di St. Rebusan dan St. boiler.

Disetujui Oleh

Irwansyah P. Pulungan
Mill Manager

You might also like