Survey Form For DI Improvement
Survey Form For DI Improvement
Company
Water Flow to Demin Train m/hr
Water flow rate to Mix Bed m/hr
Regeneration Frequency days
Caustic 100% Consumption per regenerationkg
Price of Caustic Rs/kg
HCl 30% consumption per regeneration kg
Price of HCl Rs/kg
Neutralization HCl 30% Consumption kg
Water used for each regeneration m/hr
Price of Water Rs/m
Spent Caustic quantity kg
Spent Caustic Disposal cost Rs/kg
RO+MB ----- Put Liqui cell before MB
RO+Degassifier+MB------ Put Liqui Cell before MB
Cation+Degassifier+Anion ----Put Liqui Cell before Anion
The management of the dissolved carbon dioxide (CO2) in the water after RO plant is critical for an
CO2 typically accounts for the largest Anion load in the DI system and it is normally handled using o
for the largest anion
1) Conventional degasifying unit, such as a Forced Draft Tower
2) Liqui-Cel Membrane Contactors
Degassing is the economical and value added technology of choice for oxygen and carbon dioxide re
85-95% CO2 removal depending upon water temperature and Flow rate
Benefits
Cut Resin Regeneration Frequency
Reduce Chemicals consumption
Improve water quality
Low operating cost
easy setup
Quick Pay back
upto 95% removal of free CO2
Low Energy use and capital cost
O plant is critical for an efficient operation
ormally handled using one of the following methods