MEASUREMENT OF MOISTURE
All textile materials are more or less hygroscopic. They contain a certain amount of moisture
depending upon the relative humidity of surrounding atmosphere.
Cotton 8.5%
Wool 17%
Viscose 11-13%
Silk 11%
Jute 14%
Polyester 0.3-0.4%
Acrylic 3-4%
Nylon 4.2%
Absolute Humidity:
Weight of water in a unit volume of moist air. It is usually denoted by gm/m 3 or grain/f3.
Relative Humidity:
It is the ratio of actual vapor pressure divided by the saturated vapour pressure multiply by 100.
R.H% = 98.6
Original weight:
This is the wt. Of material in its original condition containing any level of moisture. It is usually
denoted by O.W.
Dry weight:
The weight of material dried at oven state. The temperature in the oven is 105 0C.
C.C.W =
Regain:
Moisture content:
Proof:
We know that
Q. Oven dry wt. Of 500 grains of lint was found to be 400grains, calculate:
1. Wt. Of moisture
2. CCW of lint
3. R%
4. M.C%
Sol.
2. CCW = D 1.085
3.
=25%
4.
Q. Moisture regain, if cotton was found to be 10.5. What will be the value of content % age?
Sol.
R = 10.5 %
We know that,
COTTON PURCHASE
Q. A spinning unit has purchased lint of 20,000kg at 8.5% moisture regain. Calculate the
reduction in wt. If the moisture regain is found to be 10.2%.
Sol.
= 17960kg
CCW = D 1.085
= 17960 1.085
= 19486.60kg
= 513.40kg
Q. A consignment of 400kg of lint cotton was dispatched to a station where oven dry wt.
Of 1000gm sample was found to be 850gm. Calculate CCW for which the supplier is to be paid
by the consigny. Also calculate the value of R and M and excessive moisture regain %age.
Sol.
1000gm = 1kg
850gm = .85kg
CCW. = D 1.085
= 60100/340 = 17.65%
M = W100/(W+D)
= 60 100/(400) = 15%
Q. A representative sample of 9.5 oz. Drawn from a consignment of 1200 lbs of lint cotton
gave the oven dry wt of 8.5 oz. Determine the CCW of consignment and the amount of money
to be paid by the purchaser if the price per lbs is 45Rs.
Sol.
CCW. = D 1.085
= 52422.63 Rs
Q. A representative sample is taken from the consignment of 2 lots with bale wt of 170
kg. Sample wt was 13oz and dry wt was 11oz find out the conditioned wt of consignment and
conditioned price if price per lbs is 60 Rs. Also calculate M.R and M.C.
Sol.
= 34000kg
CCW. = D 1.085
R% = W100/D
= 2100/11 = 18%
M% = W100/ (W+D)
We know that,
Hence,
= 5.26%
Q. A spindle point yarn of 40s contains 5% moisture, what will be the count of yarn when
moisture added becomes 8.5% which is the standard moisture?
Hence,
Q. Calculate the conditioned count of 500m of cotton yarn in tex. If its oven dry weight is
10gm, what is count at dry wt?
Dry wt = 10gm
= 10.85gm
Q. Calculate conditioned count of 20km cotton yarn, if its oven dry weight is 800gm. Also
calculate denier count?
Dry wt = 800gm
= 868gm
We know,
Denier = Tex 9
Q. Calculate the MR, MC% & CCW of 100gm of cotton yarn if its oven dry weight is 94gm.
Also calculate tex and denier counts at dry wt & CCW. Take 1 hank of yarn?
O.W = 100gm
D = 94gm
W = 100 94 = 6gm
= 6.38%
= 6%
= 102gm
Q. A warper beam contains 500 ends of cotton yarn each end has a length of 3500 yds.
The yarn contains moisture up to extent of 5% above the standard moisture and wt is now
100lbs. calculate the count of yarn on dry wt, CCW, & present?
Sol.
No of ends = 500
We know that,
So,
Hence,
Soln:
Pa = 60 Rs Wa = 1000
Pb = 55Rs Wb = 2000
= 56.67 Rs/Kg
Solution:
(2500+Wb)40 = 112500 + 35 Wb
100000 + 40 Wb = 112500 35 Wb
Wb = 12500/5 = 2500 Kg
Q. The Price of cotton A is 64Rs/Kg While Price of Cotton B is 70Rs/Kg .If total
quantity of two cottons is same , what will be average price of mixing.
Solution:
Suppose wt of samples = W
We know that,
Q. The average mixing price per kg in a mill is Rs 45.The price of components A is 38Rs/Kg
while price of 2nd component 38Rs/Kg.
Slon:
Given data
Pm = 45
Pa = 38
Pb = 48
% Age of components
A= 3/10100=30%
B= 7/10100=70%
= 15000bales
=35000bales
Q. The average mixing price for making PC yarn is Rs 52/Kg.The price of 1Kg cotton is 42Rs
while price of 1Kg polyester is 64Rs calculate
Soln:
Given data
Pm = 52
Pc = 42
Pp = 64
Cotton =12/22100=54.55
Polyester =10/22100=45.45
=321bales
=228bales
Pm = 42
Pa = 48
Pb = 43
Pc = 38
Soln:
Qa = 4/1525000=6666.67kg
Qb = 4/1525000=6666.67Kg
Qc = 7/1525000=11666.67Kg
PIPING CALCULATIONS
Q. The main pipe in a blow room have to feed 3-branch pipes, their respective dias are
2.5, 1.5, and 1.25. calculate dia of main pipe?
Soln:
= 10.0625 = 3.17
Soln:
A=
D = 13.82
Q. A tower of blow room is 82 ft in section discharging into base by pipe with particulars:
Soln:
Area of tower = 8 8 = 64 f2
V = V 1 + V2 + V3
= 11633.17 f3
Velocity = volume/area
Soln:
= 0.3927 yd2
Velocity = 16200/0.3927
= 41252.9 yds/30min
= 4125.3 f/min
Growth rate checking is used to find out fiber demage due to the beaters. In growth rate
checking increase in percentage of short fibers is determined afer beating action of beater, if
there is increase in percentage of short fibers afer beating growth rate is not good and its mean
that fiber is demaging up by the beater.
Mean:
It is the average value of two or more values e.g. X1, X2, X3, X4, are any values there mean is
calculated as:
X = X1 + X2 + X3 + X4+./n
Standard diviation:
The standard deviation is the square root of the mean of the squares of the deviations of the
observations from their mean.
Coefficient of variation:
By expressing the standard deviation as a percentage of tegh mena we obtain the coefficient of
variation, C.V.% .
Q. 80 bales of cotton each of 167kg, are being fed daily in a 2-scutcher blow room line.
Actual production per 2-scutcher per day is 12000kg. calculate the total quantity of waste
throughout whole blow room line & waste %age.
Soln:
Output = 12000 kg
Q. The production per scutcher per hour in a 2-scutcher blow room line is 325 lbs. waste
from whole blow room line is 700 kg/day. Calculate the no of bales required per day for given
blow room line. (1 bale = 167 kg).
Soln:
Waste = 700 kg
Q. Production per hour from scutcher of 3-scutcher blow room line is 310 lbs. waste %age
of blow room is 6.5%. calculate the no. of bales to be fed in given blow room per month
provided that one bale is os 168 kg.
Soln:
= 10828.6 * 30/168
= 1934 bales
Q. 63 bales of cotton are being fed daily in a blow room line consisting of 2-scutchers. The
blow room is to be kept stopped for one hour after each shift for maintenance. If waste %age
is 6.5% , what will be the production per scutcher in kg/hour, while 1 bale = 166kg.
Soln:
= 9778.23 kg/day
= 232.82 kg/hour
Q. 80 bales of cotton are being fed in a blow room line daily. If the pure weight of cotton
per bale is 168 kg and waste% of blow room line is 6%.
What will be the wt. of cotton lap received per day from scutcher.
Calculate the no. of laps prepared per day if the wt. of one lap is 22kg.
If lap rod is 2kg then calculate no. of pure lint laps.
Soln:
Waste = 6%
= 806.4 kg
= 12633.6 kg/day
No of laps/day = 12633.6/22
= 574.2 laps
= 631.68 laps
Q. The total material fed into a step cleaner was 800 lbs/hr. The cleaning effeciency of
machine was found to be 35%. The total material delivered per hour was found to be 2% less
than the fed material. Calculate total quantity of waste as well as trash per hour. If there is
80% trash of total waste.
Soln:
Waste% = 16 * 100/800 = 2%
Trash = 16 * 80/100
= 12.8 lbs
Q. A lap of 50 lbs with a length of 55yds is being prepared on scutcher in 4.5 min. if the
waste %age of blow room line 7%, what should be required no. of bales to be fed daily, if bale
wt = 170kg
Soln:
= 666.67 lbs
= 16000 lbs/day
Hence,
No of bales = 17204.3/2.2046*170
= 46 bales
PRODUCTION CALCULATIONS
Q. Calculate Blow Room Production, if number of scutchers is 3,shell roll speed is 13rpm shell
roll dia is 9, lap weight is 12oz/yd, and efficiency is 85%.
Soln.
Blow room Production = shell roll dia* shell roll rpm*3.14* oz/yd* 60*3*8* number of scutchers* efficiency
36 * 16
36 * 16
36 * 16
= 16188232.3/576
Q. If Blow Room Production is 30000 and number of scutchers are 3, shell roll dia is 9, lap weight is
13oz/yd, and efficiency is 85% then calculate shell roll speed
Sol
Blow room Production = shell roll dia* shell roll rpm*3.14* oz/yd* 60*3*8* number of scutchers* efficiency
36 * 16
36 * 16
36 * 16
rpm = 30000 * 36 * 16
rpm = 17280000/1349019.36
Q. If Blow Room Production is 30000 and number of scutchers are 3, shell roll speed is 13rpm, shell roll
dia is 9, and efficiency is 85% then calculate lap weight.
Soln.
Blow room Production = shell roll dia* shell roll rpm*3.14* oz/yd* 60*3*8* number of scutchers* efficiency
36 * 16
36 * 16
36 * 16
oz/yd = 30000 * 36 * 16
oz/yd = 17280000/1349019.36
Q. In a spinning mill there are 30 ring frames each have 480 spindles and producing 20s count with TM
4.1. Spindle speed is 1600rpm and efficiency is 90%. The yield age of mill is 83%. In blow room there
are 3 scutchers with shell roll speed is 12rpm wt of bale is 170kg. Vary the ozs/yard calculate:
c) Total no of laps?
Soln.
= 16000 x 0.254/18.33 x 20
= 11.1 x 0.90 x 3
= 29.92ozs
Production = 1.8lbs
= 260bags
= 31228.90/2.24 = 13194/170
= 82bales
= 29355.10lbs
36 x 16
= (9 x 12 x 3.14 x 11.5 x 60 x 8 x 3) x 3
36 x 16
= 29349.5lbs
1 lap = 50yards
1 lap = 11.50ozs/yard
16
= 816 laps
= 272 laps
Q. Prepare the production plan of a spinning mill with the given statically data While the yield
age is 82 %, bale wt. is 170 Kg., blow room has 2 Scutcher, efficiency 85 % and waste %age is
6%.
Soln.
TPI
For 20 Nec
MUHAMMAD GHUFRAN (05TE-16) Page 26
(SPINNING CALCULATION-1)
Tpi =C
= 4.120
=18.33
For 30 Nec
Tpi = C
= 4.230
= 23.0
For 40 Nec
Tpi = C
= 4.340
= 27.1
For 50 Nec
Tpi = C
= 4.550
= 31.81
OPS
For 20 Nec
OPS= TPI Ct
16000 0.2540.90
= 18.3320
= 9.98
For 30 Nec
OPS= TPI Ct
16500 0.2540.94
= 23.030
= 5.71
For 40 Nec
Sp Speed 0.254 where 0.254= 60816/ 36840
OPS= TPI Ct
17000 0.2540.95
= 27.140
= 3.78
For 50 Nec
Sp Speed 0.254 where 0.254= 60816/ 36840
OPS= TPI Ct
18000 0.2540.96
= 31.850
= 2.76
For 20 Nec
Production(bags/day)= OPS 0.90 No. of Frames Whereas 0.90 =3480/16 100
= 9.98 0.90 10
= 89.82
For 30 Nec
Production(bags/day)= OPS 0.90 No. of Frames Whereas 0.90 =3480/16 100
= 5.71 0.90 8
= 41.11
For 40 Nec
Production (bags/day)= OPS 0.90 No. of Frames Whereas 0.90 =3480/16 100
= 3.78 0.90 15
= 51.03
For 50 Nec
Production (bags/day)= OPS 0.90 No. of Frames Whereas 0.90 =3480/16 100
= 2.76 0.90 5
= 12.42
Bale required = ?
Production of ring 45.36
194.38 45.36
= 0.82 170
Suppose OZ / yd = 13
36 16
N = 3.14 9 60 24 .85 13 2
N= 14.49 ~ 15 (RPM)
L = 100*72*54*16*33*9*/1*112*13*70*35*36
L =0. 628*L.L.C
Q. The value of LLC is .628 size of L.L.C.M is 80T. Time for lap formation is 4.25 min. calculate
the production of the blow room line consisting of 2-scutchers with a hank of 0.0017?
Soln.
L.L.C.W = .628
L.L.C.W=80T
Scutcher = 2
L =0.628*80
L =50.24 yards
= 450.6 kg/hour
Q. Production per hour from a 3-scutcher blow room line is 800 kg. Lap wt is 15 oz/m and
time for making full lap is 4.5 min. Calculate value of L.L.C.W When L.L.C is 0.628.?
Soln.
= 587.87 lbs/hr
= 587.87*16/(60*13.72)
= 11.43 yds/min
L.L = L.L.C.W*L.L.C
= 51.46 yds
CARD CALCULATIONS
Q. calculate following from sketch given below; when cylinder is rotating at 180 rpm. Pully on
cyliner shaft is 18 driving a pulley 7 on taker-in; hank sliver is 0.135s and production
efficiency is 84% .
Production in kg/hr
Prod constant
Induvidual draft
Total draft
Drft constant
Size of dcp for giving actual draft of 85 with a waste of 5%
Condensation factor
Size of barrow wheel for gettingh 5% higher prod
Time required to fill a can with a size of 18 * 40, if can capacity is 40lbs
Density of packing can
Soln;
Production=
*2/36[180*18.25*7.25*5.25*20*216*31*20*20/7.25*7.25*10.25*100*30*15*20*20]*60*.84/840*0.135
= 53.55 lbs/hr = 24.3 kg/hr
*2/36[180*18.25*7.25*5.25*1*216*31*20*20/7.25*7.25*10.25*100*30*15*20*20]*60*1/840*1
= 0.0043 lbs/hr
=0.001953 kg/hr
D1 = 48*2.5/18*6 = 1.11
D2 = 120*40*27/18*40*2.5 = 72
D3 = 216*4/30*27 = 1.067
D4 = 31*2/15*4 = 1.033
M.D = 48*120*216*31*2/18*18*30*15*6=88.18
Density = mass/volume
Volume = d2*L/4
= 3.14*(18)2*40/4
= 10178.76 inch3
Density = 40/10178.76 = 0.0039 lbs/in 2
Q. If the doffer speed of flat card is 40rpm and its diameter is 27, grains/yards are 65, Tension
draft is 1.03, and the efficiency of card is 85% then calculate the production of card in pounds
per day if there are 8 cards in department.
Data:
Doffer dia= 27
Efficiency %= 85
No. of cards = 8
Production (lbs/day) =?
Solution:
= 36*7000
40*27*3.14*65*60*8*3*.85*8
= 36*7000
= 8565lbs/day
Question:
If the production of card is 8565lbs/day, doffer diameter is 27, grains/yards are 65, Tension draft is
1.03, and the efficiency of card is 85% then calculate the doffer speed if there are 8 cards in
department.
Data:
Doffer dia= 27
Efficiency %= 85
No. of cards = 8
Doffer speed= ?
Solution:
36*7000
36*7000
So,
card production*36*7000
Doffer speed =
8565*36*7000
Doffer speed =
27*3.14*65*60*8*3*.85*8
Approximately 40rpm
Q. 65 bales of cotton are feed in 2 scutcher daily; each bale contains 165 kg cotton. Waste
%age through out the b/r line is 6.5%. Doffer speed is 30 rpm. Tension draft is 1.07.
Production effy is 88%. Sliver wt, per yard is 65 grain. Calculate the total no. Of carding m/c
required per scutcher for proper balance of production. Waste %age of card is 6%.
Solution:
=65*170
=11050 Kg
= 718.25 Kg
= 10331.75 Kg
= 5165.875 Kg
= 3.14*27*30*60*24*65*1.07*.88/36*7000
= 889.52 lb/day
= 946.29 lb
= 12 CARDS
Q. IF SPEED OF DOFFER IS 40RPM WITH .125Nec COUNT AND EFFY IS 88% CALCULATE CARD
PRODUCTION AND ALSO CALCULATE NUMBER OF SCTHURES REQUIRED TO MEET CARD
PRODUCTION, IF WASTE %AGE OF B/R IS 6.5% AND OF CARD IS 6%? TENSION DRAFT IS 1.07.
IF SHELL ROLLER RPM IS 12. AND OUNCES PER YARD IS ALSO13.
SOLUTION:-
=3.14*27*40*60*24*1.07*.88/36*840*0.125
=1064.38 lb
= 1132.32lb
= 16984.8 lb