Professional Documents
Culture Documents
LBB Level Check: Dept./Sect: Pme/Pmn Unit: 1 Location: TNP Date: 12-Okt-17
LBB Level Check: Dept./Sect: Pme/Pmn Unit: 1 Location: TNP Date: 12-Okt-17
PMN-FR18-221/0
REFERENCE DRAWING :
POSITION A B
MEASURING TRUE LEVEL MEASURING TRUE LEVEL
Over
Over
DISASSEMBLY
Over 9.25
3.5 6
Over
Over
Over 6
11 1
Over 4.5
8Over
1
Over
Over Over
over
Over
Over
Over
7
2.25
2 2.5
FINAL ASSEMBLY
1 1.5
12
0.5 2
1 0.5
2
INSPECTOR Haposan mS DATE
APPROVED CHECKED PREPARED
NAME Jhony Samosir Sunarno A.R Denny.P
POSITION M JM AS
SIGN
DATE