Avic-Mixed Development Project

Engineer: Supervision Consultant: Contractor:


Central Engineering Consultancy
AVIC Hotels Lanka Pvt Ltd. CSCEC
Bureau

SITE DIARY
Date: 11/12/2015 Name : Situge S.M.J.M.T

Location Work Inspected (RFA No: ) / Observed work in progress at site


At Avic office meeting plumbing issues discussed with Avic ,DG5 Architecture and CSCES
specially below the transfer level
podium at 23A-24/D piece of 160 two supply pipes for reflection tank isn't adequate to be embedded
podium at 12-16/A-D inspected column formwork removal
podium at 23A-32/A-D inspected slab reinforcement progressing area
Discussion had with HE engineer's representative on issues came in water
proofing membrane at retaining wall

Did you notice no


any non approved
Materials used at site /
Material used but don't know the status ?

Defects Noted/
Verbal instruction given to contractor
regarding defects

Referred Method statements ,Drawings


and Engineer's comments.

Collected information

Plant & Labor Observations

General Comments:

Signature:.. Date:..