Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

STANDARD OPERASIONAL PROSEDUR DEPARTEMEN ELEKTRIKAL

START

SITE VISIT:
- DOCUMENT EXISTING
- TIE IN (DARI EXISTING)

REPORT
NO

APPROVAL PM

YES

ELECTRICAL DEPARTMENT

DRAWING SPECIFICATION CALCULATION DATASHEET REPORT

DRAFTER/DESIGNER ENGINEER ENGINEER DRAFTER/DESIGNER


ENGINEER

NO NO
DRAFT DRAFT
SPECIFICATION SPECIFICATION FINAL REPORT
ENGINEER ENGINEER

FINAL
YES SPECIFICATION
YES
DED (DETAIL
ENGINEERING DESIGN)
QA/QC QA/QC QA/QC

NO QA/QC

APPROVAL

YES

DED (FOR
CONSTRUCTION)
APPROVED

FINISH

You might also like