Professional Documents
Culture Documents
Production Schedule
Production Schedule
Production Schedule
Please include location, time of film, what you are filming and team
members including actors
Date: 9/10/2017
Monday Tuesday Wednesday Thursday Friday
Planning Planning Filming the Evaluation Final
interviews of filming evaluation
(inside the (verbal) of filming
oracle) (verbal)
Introductory Filming the More Maybe
footage b-roll (river filming (b- begin to
outside the by oracle, roll inside edit basic
oracle (paris train college structure
talking) station, grounds)
track, park, Acquire
railway archive
bridge, footage
inside the
oracle,
people)
Introductory Finalizing
voiceover the script
Radio studio
(paris
talking)
Date: 16/10/2017