BLAST DESIGN

Drill & Blast Section


Job Site ADMO

Form. No.ADMO/DB/11/F-020
GEOMETRI KEBUTUHAN BAHAN PELEDAK ACCESSORIES BAHAN PELEDAK REMARK
Hari : SABTU Burden 8 Mtr Burden 8 Mtr Emulsion Blend 8880 Kg Remote Firing 15 Mtr 1 Pcs Tie - Up /IP
BOXCUT / TIMUR
Tanggal : 19 AGUSTUS 2017 Spacing 10 Mtr Spacing 9 Mtr Ammonium Nitrate Kg In Hole 500 Ms 12 Mtr 74 Pcs
Jam : 12.40 WITA Depth Hole Hole Depth Hole Hole Power Gel - Pcs In Hole 500 Ms 18 Mtr 0 Pcs Single Decking 74 Hole
PIT : NORTH - N4 FLOOR T115 4 - 11 62 Hole 4 - 11 12 Hole Booster 400 Gram 74 Pcs ECHELON Double Decking Hole
Block : 17969 - 18081 Strip : 3251 - 3387 Luas Area 4960 Mtr2 Luas Area 864 Mtr2 Powder Factor SD 0.19 Kg/Bcm TLD 25 Ms 12 Mtr 7 Pcs Service By,
Elevasi, Act : 101 - 106 RL : 96 Volume of Blasting 36960 Bcm Volume of Blasting 8784 Bcm Powder Factor DD Kg/Bcm TLD 67 Ms 12 Mtr Pcs Matrik Isian HARD
Luas Area :: 1708014N4FT115_P96 5,824 4 6 Hole 10 10 Hole 4 1.3 50 Kg/Hole TLD 109 Ms 12 Mtr 57 Pcs Jalur Pengecekan
Volume : 45,744 5 0 Hole 11 2 Hole 5 1.5 60 Kg/Hole TLD 176 Ms 12 Mtr Pcs
Tanggal WO : 6 4 Hole 12 0 Hole 6 2.2 86 Kg/Hole CONTROL LINE Jalur Memutar
ID 7 14 Hole 13 0 Hole 7 2.8 112 Kg/Hole TLD 42 Ms 12 Mtr 10 Pcs
8 26 Hole 14 0 Hole 8 3.9 154 Kg/Hole DUMMY TLD 42 MS 12 Mtr Pcs
9 12 Hole 15 0 Hole 9 4.7 187 Kg/Hole LIL Pcs -

Legend :
17 Ms Dibuat, Diperiksa, Menyetujui,
25 Ms
42 Ms
67 Ms
100 Ms / 200 Ms
109 Ms / 218 Ms ( Taufik Prayudho ) ( Taufik Prayudho N. ) ( )
150 Ms DB Engineer Sr. DB Engineer Drill Blast PT. Adaro Indonesia
176 Ms