Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

H

t j
Beton Rabat K 225
0.10

Tebal = 10 cm
0.30

1.35
j j Drain Hole Pipa PVC 2" @ 2 m
H H 996 Gebalan Ijuk, t. 10 cm
i t 5,
996 996
0.50 1 : 84
1 .5
Pas. Batu Kali

30
Finishing Siaran
0.80

0.
01 1
.3
Mid. Cap K 225
1,5
Ukuran 0,6 x 0,6 m
Plesteran + acian
996 996 Tebal 2 cm
Drain Hole Pipa PVC 2" @ 2 m

0.27
Beton Lantai K 125 3, Gebalan Ijuk, t. 10 cm
Tebal = 15 cm 1 :
0.40 0.60 1
29 07 Drain Hole Pipa PVC 2" @ 2 m
.1 .5
0.30

1.00 Gebalan Ijuk, t. 10 cm


f Pas. dolken L=3.0m Pas. Batu Kali
216 @1.5m dia.13-15cm Finishing Siaran
0.15

10-150 93
.2
1 Drain Hole Pipa PVC 2" @ 2 m
03
.5 Gebalan Ijuk, t. 10 cm
1,3
Plesteran + acian
Beton Lantai K 125 Tebal 2 cm
Tebal = 15 cm
1 Base Concrete K 225
Ukuran 1,5 x 0,6 m
1,5

1.50
1.20
216
DETAIL LINDUNGAN TEBING
1 : 50
0.60 10-150 0.60
07 Pas. CSP L= 10,0 m
Mini Pile 20x20x300 cm .5
CCSP-W325- 1000 A

10.00
1
L = 10.00 m

L = 10.00 m

1,3 0.30
Urukan Pasir t. 10 cm
Base Concrete K 225
Ukuran 1,5 x 0,6 m
DETAIL FRAME CONCRETE
1 : 50

1.20
8 16
10 -
150
Pas. CSP L= 10,0 m
CCSP-W325- 1000 A
30
42
30
400

400

24
20 2 20

150
120
776 220 220 776 8 16

60
H

30
30
DETAIL CONCRETE SHEET PILE 10 - 150
No Rev Tgl Yang Direvisi Oleh Direnc Diset
1 : 20 60
60
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROPINSI JAWA TIMUR
D I R E K T O R A T J E N D E R A L S U M B E R D A Y A A I R Pekerjaan : Proteksi Tebing Dan Groundsill
BALAI BESAR WILAYAH SUNGAI BRANTAS
DETAIL JOINT FRAME S N V T P E L A K S A N A A N J A R I N G A N S U M B E R A I R B R A N T A S
Muara Kali Ngrowo
Kabupaten Tulungagung
DETAIL BASE CONCRETE DETAIL MID CAP CONCRETE (POT. 1-1) Jl. Jayengkusuma 123 Telp. 0355 - 321013 Fax. 321014 Tulungagung 66224, Email : pbps_2@yahoo.co.id ( Panjang = 141.00 m )
Skala : 1 : 125
1 : 20 1 : 20 1 : 20
DETAIL CONCRETE SHEET PILE, DETAIL FRAME CONCRETE,
DETAIL BASE CONCRETE, DETAIL MID CAP
Kabupaten : Tulungagung
Diukur : Heri Suyono No Register : TA. 2015/ TB. 002
KEGIATAN : SUNGAI DAN PANTAI I Digambar : Andi Kurniawan No Lembar : 03
Direncana : Bakti Yudi F.A.Md Tanggal : No Kontrak :
Diperiksa : Pelaksana Teknik : Budiyono, ST.
Disetujui : PPK : Ir. Siswo, SP.1
Diketahui : Ka. Satker PJSA BRANTAS : Ir. Gandes Sawitri, MT.

You might also like