The document outlines a monthly checklist for January with maintenance tasks divided into four weeks. In each week, quarterly cranes (QC) and rubber tired gantry cranes (RTG) are assigned greasing, rope and sheave inspections, visual checks, and engine checks to inspect for leaks and noise. Various gears are also checked on a rotating basis between the cranes and weeks.
The document outlines a monthly checklist for January with maintenance tasks divided into four weeks. In each week, quarterly cranes (QC) and rubber tired gantry cranes (RTG) are assigned greasing, rope and sheave inspections, visual checks, and engine checks to inspect for leaks and noise. Various gears are also checked on a rotating basis between the cranes and weeks.
The document outlines a monthly checklist for January with maintenance tasks divided into four weeks. In each week, quarterly cranes (QC) and rubber tired gantry cranes (RTG) are assigned greasing, rope and sheave inspections, visual checks, and engine checks to inspect for leaks and noise. Various gears are also checked on a rotating basis between the cranes and weeks.