Avic-Mixed Development Project

Engineer: Supervision Consultant: Contractor:


Central Engineering Consultancy
AVIC Hotels Lanka Pvt Ltd. CSCEC
Bureau

SITE DIARY
Date: 07/12/2015 Name : S.M.J.M.T.SITUGE

Location Work Inspected (RFA No: ) / Observed work in progress at site


Alone the CEB access road Capping beam breaking
podium at grid 24,29/A,D Slab & drop wall reinforcement fabricating
Basement & ground floor Crack inspection was done for Tower 1 Tower 02 and W1 wall
At site office followed the lists of work flow to separate the plumbing WF and document

Did you notice no


any non approved
Materials used at site /
Material used but don't know the status ?

while concreting columns, grout was spread out to r/f and thickly
Defects Noted/ covered with its surface
Verbal instruction given to contractor
regarding defects

Referred Method statements ,Drawings and


Engineer's comments.

Collected information

Capping beam breaking 3 labour/


Plant & Labor Observations

General Comments:
inspected sheet pile diving machine and pre boring process