Project
Contractor
Desain Mix Formula
NOMOR Kadar Aspal TEBAL BENDA UJI BERAT BENDA UJI STABILITAS
BENDA Terhadap Berat T1 T2 T3 Trata-rata KERING DALAM AIR SSD BACAAN FLOW
UJI Agregat ALAT
% (mm) (mm) (mm) (mm) (gram) (gram) (gram)
1 5.0 70.75 71.50 71.25 71.17 1,244.50 694.80 1,249.30 436.00 2.13
2 5.0 71.00 71.35 71.05 71.13 1,257.90 697.50 1,262.20 420.00 1.50
3 5.0 71.50 71.50 71.50 71.50 1,266.70 711.10 1,272.60 300.00 2.50
1 5.5 69.75 68.50 70.65 69.63 1,231.30 689.90 1,238.30 385.00 2.43
2 5.5 69.75 70.00 72.75 70.83 1,247.80 701.70 1,255.20 328.00 1.83
3 5.5 71.20 71.20 71.20 71.20 1,257.50 711.70 1,265.50 450.00 3.30
1 6.0 68.50 69.30 71.50 69.77 1,255.00 700.50 1,258.90 425.00 2.80
2 6.0 71.30 71.80 71.20 71.43 1,250.00 714.70 1,266.90 360.00 2.82
3 6.0 71.30 71.30 71.30 71.30 1,253.60 708.40 1,257.50 460.00 3.30
1 6.5 71.30 72.50 72.90 72.23 1,222.90 697.30 1,239.30 338.00 3.63
2 6.5 69.50 70.00 71.50 70.33 1,224.40 692.90 1,235.00 364.00 3.23
3 6.5 71.50 71.50 71.50 71.50 1,249.60 704.30 1,254.00 410.00 4.00
1 7.0 61.80 62.30 62.10 62.07 1,283.50 724.30 1,288.80 306.00 4.63
2 7.0 72.00 72.00 71.50 71.83 1,181.20 660.30 1,186.30 273.00 4.34
3 7.0 71.00 71.00 71.00 71.00 1,227.30 686.80 1,229.80 290.00 3.50
0070C0
LABORATORIUM BAHAN ASPAL DAN JALAN000000
POLITEKNIK NEGERI UJUNG PANDANG
MIX DESAIN
ASPHALT CONCRETE WEARING COURSE
(AC - WC)
PROYEK :
KONTRAKTOR :
Project :
Contractor :
Desain Mix Formula : ASPHALT CONCRETE WEARING COURSE (AC-WC)
I Perbandingan Campuran
1 BATU 2 - 3 0%
2 BATU 1 - 2 16%
3 BATU 0,5-1 59%
4 ABU BATU 21%
5 SEMEN PC 4%
II Bahan Additive
Bahan additive anti stripping 0,2 % Terhadap Berat Aspal
NOMOR TEBAL KADAR ASPAL TERHADAP BERAT BENDA UJI ISI BERAT CAMPURAN BERAT STABILITAS KADAR HASIL
BENDA BENDA BERAT BERAT CAMP KERING DALAM AIR SSD BENDA UJI PADAT MAKSIMUM ISI VIM VMA VFB BACAAN SETELAH SETELAH FLOW ASPAL BAGI
UJI UJI AGREGAT (BULK) TEORITIS ALAT KALIBRASI KOREKSI EFEKTIF MARSHALL
a b c d=100/(100+c)*c e f g h=g-f i = e/h j=100/{(100-d)/t k l=100-100(k/j) m=100-(100-d) n=100*(m-l)/m o p q r x = c - absr * y = q/r
(mm) (%) (%) (gram) (gram) (gram) + d/u} *i/s (100-c)/100
1 71.33 6.30 5.93 1,253.30 704.40 1,257.50 553.10 2.266 2.374 2.266 4.554 15.952 71.451 355.00 1498.10 1213.64 2.80 6.30 4.33
Project
Contractor
Desain Mix For : ASPHALT CONCRETE WEARING COURSE (AC-WC)
BERAT KOEFISIEN
KADAR ASPAL ISI VIM VMA VFB STABILITAS FLOW MARSHALL KET
(KN/mm)
5.50 2.227 7.117 16.765 57.692 4076.44 1.33 3072.69
6.00 2.233 6.308 16.956 63.664 3191.46 1.43 2237.00
6.50 2.247 5.113 16.805 69.755 2424.10 1.78 1361.86
7.00 2.312 1.774 14.797 88.141 2802.90 2.27 1234.76
7.50 2.292 2.066 15.947 87.148 2241.52 2.81 797.69
5.00
3500.00
4.50
FLOW
3000.00 4.00
2500.00 3.50
3.00
2000.00
2.50 f(x) = 0.2904761905x^2 - 3.0141904762x + 9.097047619
1500.00 R = 0.9972886129
2.00
1000.00 1.50
1.00
500.00
5.00 5.50 6.00 6.50 7.00 7.50 8.00
5.00 5.50 6.00 6.50 7.00 7.50 8.00
KADAR ASPAL
KADAR ASPAL
4200.00
19.000
4000.00
VMA
KADAR ASPAL
KADAR ASPAL Vs VFB
VFB
7.50 8.00
ANALISA HASIL UJI TEKAN MARSHALL
RENDAMAN 45 MENIT SUHU 60 Oc
Project
Contractor
Desain Mix For : ASPHALT CONCRETE WEARING COURSE (AC-WC)
NOMOR TEBAL KADAR ASPAL TERHADAP BERAT BENDA UJI ISI BERAT CAMPURAN BERAT STABILITAS KADAR HASIL
BENDA BENDA BERAT BERAT CAMP KERING DALAM AIR SSD BENDA UJI PADAT MAKSIMUM ISI VIM VMA VFB BACAAN SETELAH SETELAH FLOW ASPAL BAGI
UJI UJI AGREGAT (BULK) TEORITIS ALAT KALIBRASI KOREKSI EFEKTIF MARSHALL
a b c d=100/(100+c)*c e f g h=g-f i = e/h j=100/{(100-d)/t k l=100-100(k/j) m=100-(100-d) n=100*(m-l)/m o p q r x = c - absr * y = q/r
(mm) (%) (%) (gram) (gram) (gram) + d/u} *i/s (100-c)/100
1 67.10 5.50 5.21 1,251.08 704.93 1,259.73 554.80 2.255 2.398 2.255 5.955 15.723 62.127 1070.00 4515.40 4106.06 1.19 4.75 34.50
2 66.50 5.50 5.21 1,235.98 681.70 1,241.72 560.02 2.207 2.398 2.207 7.956 17.517 54.580 1052.00 4439.44 4106.11 1.22 4.75 33.66
3 66.80 5.50 5.21 1,242.25 685.85 1,245.58 559.73 2.219 2.398 2.219 7.441 17.055 56.370 1038.00 4380.36 4017.14 1.57 4.75 25.59
1 66.30 6.00 5.66 1,246.68 709.88 1,252.33 542.45 2.298 2.383 2.298 3.552 14.513 75.527 817.00 3447.74 3207.08 1.35 5.25 23.76
2 65.85 6.00 5.66 1,244.17 679.43 1,246.90 567.47 2.192 2.383 2.192 7.990 18.447 56.687 840.00 3544.80 3340.08 1.41 5.25 23.69
3 68.40 6.00 5.66 1,242.24 682.47 1,245.34 562.87 2.207 2.383 2.207 7.382 17.908 58.779 818.00 3451.96 3027.22 1.52 5.25 19.92
1 67.30 6.50 6.10 1,250.94 706.05 1,256.43 550.38 2.273 2.368 2.273 4.028 15.854 74.590 627.00 2645.94 2392.58 2.00 5.76 11.96
2 65.90 6.50 6.10 1,251.33 700.33 1,257.06 556.73 2.248 2.368 2.248 5.093 16.787 69.659 510.00 2152.20 2025.00 1.21 5.76 16.74
3 65.95 6.50 6.10 1,251.01 696.66 1,259.92 563.26 2.221 2.368 2.221 6.218 17.773 65.017 720.00 3038.40 2854.73 2.13 5.76 13.40
1 66.30 7.00 6.54 1,260.37 711.21 1,260.54 549.33 2.294 2.354 2.294 2.532 15.455 83.614 657.00 2772.54 2579.01 0.98 6.26 26.32
2 68.50 7.00 6.54 1,306.28 743.60 1,308.37 564.77 2.313 2.354 2.313 1.743 14.770 88.198 650.00 2743.00 2398.86 2.21 6.26 10.85
3 66.30 7.00 6.54 1,261.92 720.44 1,262.19 541.75 2.329 2.354 2.329 1.047 14.166 92.612 874.00 3688.28 3430.83 3.62 6.26 9.48
1 66.55 7.50 6.98 1,271.56 722.76 1,273.51 550.75 2.309 2.340 2.309 1.334 15.319 91.294 632.00 2667.04 2463.29 2.88 6.77 8.55
2 65.20 7.50 6.98 1,267.40 715.52 1,268.91 553.39 2.290 2.340 2.290 2.126 15.999 86.714 610.00 2574.20 2471.44 2.85 6.77 8.67
3 67.60 7.50 6.98 1,277.96 718.37 1,279.88 561.51 2.276 2.340 2.276 2.737 16.524 83.434 473.00 1996.06 1789.82 2.70 6.77 6.63
Project :
Contractor :
Desain Mix : ASPHALT CONCRETE WEARING COURSE (AC-WC)
100
GRADASI SPESIFIKASI
NO.SARINGAN BATU 2 - 3 BATU 1 - 2 BATU 0,5-1 ABU BATU SEMEN PC GABUNGAN AC-WC 90
0.0% 16.0% 58.8% 21.0% 4.2% 100.0% KASAR
80
37,5 (1,5") 100.00 100.00 100.00 100.00 100.00 100.00 100
70
25 (1") 84.24 100.00 100.00 100.00 100.00 100.00 100
19 (3/4") 38.21 100.00 100.00 100.00 100.00 100.00 100
60
12,7 (1/2") 0.38 37.87 100.00 100.00 100.00 90.06 90 - 100
9,5 (3/8") 0.03 17.27 100.00 100.00 100.00 86.76 77-90 50
No.4 0.00 0.49 75.53 99.81 100.00 69.65 53-69
No.8 0.00 0.00 46.40 89.39 100.00 50.25 33-53 40
No.16 0.00 0.00 34.96 66.31 100.00 38.68 21-40
No.30 0.00 0.00 23.72 13.50 100.00 20.98 14-30 30
No.50 0.00 0.00 9.58 3.21 100.00 10.51 9-22
No.100 0.00 0.00 2.58 0.81 100.00 5.88 6-15 20
No.200 0.00 0.00 0.94 0.57 100.00 4.87 4-9
10
Project :
Contractor :
Mat. Sample: ABU BATU
Quarry :
COMULATIVE
WEIGHT RETAINED PERCENT RETAINED PERCENT PASSING
SIEVE SIZES RETAINED
SAMPEL 1
100.00
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
UKURAN AYAKAN
Sieve Analysis of Aggregate
(ANALISIS SARINGAN AGREGAT KASAR & HALUS)
ASTM C-33
Project :
Contractor :
Mat. Sample: BATU PECAH 0,5/1 (CRUSHED STONE)
Quarry :
COMULATIVE
WEIGHT RETAINED PERCENT RETAINED PERCENT PASSING
SIEVE SIZES RETAINED
SAMPEL 1
100.00
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
UKURAN AYAKAN
Sieve Analysis of Aggregate
(ANALISIS SARINGAN AGREGAT KASAR & HALUS)
SNI 03 - 1968 - 1990 / AASHTO T-27-82
Project :
Contractor :
Mat. Sample : BATU PECAH 1/2 (CRUSHED STONE)
Quarry :
PERCENT
WEIGHT COMULATIVE PERCENT
SIEVE SIZES PASSING
RETAINED RETAINED RETAINED
NO.200
2" 0.00 0.00 0.00 100.00
1 1/2 " 0.00 0.00 0.00 100.00
25 (1") 0.00 0.00 0.00 100.00
19 (3/4") 0.00 0.00 0.00 100.00
12,7 (1/2") 1747.43 1747.43 62.13 37.87
9,5 (3/8") 579.46 2326.89 82.73 17.27
No.4 471.81 2798.70 99.51 0.49
No.8 13.92 2812.62 100.00 0.00
No.16 0.00 2812.62 100.00 0.00
No.30 0.00 2812.62 100.00 0.00
No.50 0.00 2812.62 100.00 0.00
No.100 0.00 2812.62 100.00 0.00
No.200 0.00 2812.62 100.00 0.00
PAN 0.00 2812.62 100.00 0.00
P E R C E N T PA S S IN G
100.00
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
SIEVE SIZES
Sieve Analysis of Aggregate
(ANALISIS SARINGAN AGREGAT KASAR & HALUS)
SNI 03 - 1968 - 1990 / AASHTO T-27-82
Project :
Contractor :
Mat. Sample : BATU PECAH 2/3 (CRUSHED STONE) DISARING 1 1/2"
Quarry :
PERCENT
WEIGHT COMULATIVE PERCENT
SIEVE SIZES PASSING
RETAINED RETAINED RETAINED
NO.200
2" 0.00 0.00 0.00 100.00
1 1/2 " 0.00 0.00 0.00 100.00
25 (1") 471.85 471.85 15.76 84.24
19 (3/4") 1378.42 1850.27 61.79 38.21
12,7 (1/2") 1132.82 2983.09 99.62 0.38
9,5 (3/8") 10.52 2993.61 99.97 0.03
No.4 0.85 2994.46 100.00 0.00
No.8 0.00 2994.46 100.00 0.00
No.16 0.00 2994.46 100.00 0.00
No.30 0.00 2994.46 100.00 0.00
No.50 0.00 2994.46 100.00 0.00
No.100 0.00 2994.46 100.00 0.00
No.200 0.00 2994.46 100.00 0.00
PAN 0.00 2994.46 100.00 0.00
P E R C E N T PA S S IN G
100.00
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
SIEVE SIZES
KARAKTERISTIK GABUNGAN AGREGAT
Project :
Contractor :
Desain Mix For : ASPHALT CONCRETE BASE COURSE (AC-BASE)
Project :
Contractor :
Mat. Sample : ABU BATU
Quarry :
KEGIATAN A B Rata-rata
Berat Jenis
Kering permukaan jenuh 500 / (B + 500 - Bt) 2.65 2.56 2.606
Penyerapan
(Absorsi) {(500 - Bk) / Bk} X 100 % 2.29 2.27 2.281
PENGUJIAN BERAT JENIS DAN PENYERAPAN AGGREGAT HALUS
SK.SNI.M09.1989.F / SNI.03-1969-1990
Project :
Contractor :
Mat. Sample : BATU PECAH MEDIUM
Quarry :
KEGIATAN A B Rata-rata
Berat Jenis
Kering permukaan jenuh 500 / (B + 500 - Bt) 2.53 2.53 2.532
Penyerapan
(Absorsi) {(500 - Bk) / Bk} X 100 % 1.15 1.42 1.287
PENGUJIAN BERAT JENIS DAN PENYERAPAN AGGREGAT KASAR
SK.SNI.M09.1989.F / SNI.03 -1969 - 1990
Project :
Contractor :
Mat. Sample : BATU PECAH 1/2 (CRUSHED STONE)
Quarry :
KEGIATAN A B Rata-rata
Project :
Contractor :
Mat. Sample : BATU PECAH 2/3 (CRUSHED STONE) DISARING 1 1/2"
Quarry :
KEGIATAN A B Rata-rata