Base load operation yaitu bekerja secara konstan

General specification steam turbine and boiler

1. Steam Turbine

Main steam pressure

Min steam temp

Reheat steam temp

Rated gross output

2. Boiler : B%W radient drum boiler

BMCR Flow

Equipment Component

Makeup line , capacity x number, remark ( tank/unit)

Makeup tank

Makeup pump

Konfigurasi pump and tank

Condensate line

Condensate extraction pump

Gland steam condenser/exhauster

LP Feed water heater no.1

LP Feed water heater no.2

LP Feed water heater no.3

Deaerator

Konfigurasi CEP 2x 100%; Heater- 1x100%; Exhauster- 2x100%


Note : one condensate pump is operation, and the other is in stanby. In case outlet
header pressure reduces

Feed water line

BFP-BP

BFP

HP Feedwater heater no.5

HP Feedwater heater no.6

HP Feedwater heater no.7

Note : please refer to 1.2.2 for BFP operation

Konfigurasi : BFP 3x50% ; BFP BP 3x50% ; Heater 1x100%

MSV normally open, mengatur buka tutup valve

CV normally open, jika ada perubahan beban ,untuk mengatur flow steam ,beban naik
putaran turun, kalo beban makin tinggi maka flownya makin besar control valve
membuka lebih besar supaya steam yang masuk bertambah agar putaran turbin konstan
3000rpm 50Hz

Yang masuk ke grid merupakan daya aktifnya , diatur oleh Governor Valve,

Daya reaktif cukup dengan arus eksitasi ,

Generator 0,85
KONDENSOR
Main Steam Inlet 72.8209 0.1 45.8075 2485.419 0.9588

Main Exit 73.9216 0.1 45.498 190.5186 0

Cooling Water Inlet 4208.802 4 30 126.1061 0

Cooling Water Inlet 4208.802 4 39.4976 165.7902 0

Auxiliary Water Inlet 1.1007 1.0342 25 104.9312 0