12 11 10 9 8 7 6 5 4 3 2 1

24MM DGU GLASS CONSISTS OF:


+17.40 TOP ROOF 6MM NANO MISTY BLUE(KNT-755)
+16.70 ROOF TEMPERED GLASS+ 12MM AIR SAPCE + 6MM CLEAR
TEMPERED GLASS.

28MM DGU GLASS CONSISTS OF:


6MM NANO MISTY BLUE(KNT-755)
TEMPERED GLASS+ 16MM AIR SAPCE + 6MM CLEAR
TEMPERED GLASS.
+12.90 PENTHOUSE

JOTASHIELD COLORLAST MATT (1819)


JOTASHIELD COLORLAST MATT (1819)

+9.40 SECOND FLOOR

PAINT FINISH ORIGINAL


TRAVANTINE ( 1115)
PAINT FINISH ORIGINAL PAINT FINISH ORIGINAL
TRAVANTINE ( 1115)
TRAVANTINE ( 1115)

+5.20 FRIST FLOOR JOTASHIELD COLORLAST MATT (1819)

TO BE EXTENT TO BE EXTENT
DARK COLOUR PAINT

HAND RAIL PROPOSED BLOCK WORK


+1.00 GROUND FLOOR
ACP CLADDING
+0.00
RAMP UP

RIGHT SIDE ELEVATION


1:150
ALUMINIUM PANELS DARK COLUR PAINT FINISH ALUMINIUM PANELS
JOTASHIELD COLORLAST MATT (1819) DARK COLUR PAINT FINISH

JOTASHIELD COLORLAST MATT (1819)

1 2 3 4 5 6 7 8 9 10 11 12

+16.70 ROOF

+15.90 +15.90

+17.40 TOP ROOF

+12.90 PENTHOUSE

+9.40 SECOND FLOOR

PAINT FINISH ORIGINAL


TRAVANTINE ( 1115)

JOTASHIELD COLORLAST MATT (1819)

+5.20 FRIST FLOOR


PAINT FINISH ORIGINAL A - APPROVED
TRAVANTINE ( 1115)
B - APPROVED AS NOTED
C - NOT APPROVED
D - REGECTED

HAND RAIL
+1.00 GROUND FLOOR

+0.00
RAMP UP 01 01-12-2016 AS BUILT DRAWING ayoob shabeer

LEFT SIDE ELEVATION 00 02-03-2016 ISSUE FOR APPROVAL ayoob shabeer

1:150
NO DATE ISSUE FOR DWN. CHECK.
JOTASHIELD COLORLAST MATT (1819)
PROPOSED PLASTERING GROOVE REVISION

OWNER:

A B C D
PLASTERING GROOVE
PLASTERING GROOVE
+17.40 TOP ROOF
+16.70 ROOF
D C B A LOUVERS PROJECT:

+17.40 TOP ROOF


+16.70 ROOF
PROPOSED LOUVERS

+12.90 PENTHOUSE
CONSULTANT

PAINT FINISH ORIGINAL


TRAVANTINE ( 1115)
+12.90 PENTHOUSE

+9.40 SECOND FLOOR


ACP CLADING MAIN CONTRACTOR

+9.40 SECOND FLOOR


PAINT FINISH ORIGINAL
TRAVANTINE ( 1115)
Hamton International WLL

TILE FINISHING +5.20 FRIST FLOOR


TEL : +974 - 40052150/201 P.O. BOX NO: 37965
FAX : +974 - 40052157 DOHA - QATAR
Email : hamton@hamtonqatar.com

DRAWING TITLE:
+5.20 FRIST FLOOR
PLASTERING
GROOVE OPTION -01
ELEVATIONS
+1.00 GROUND FLOOR

+0.00 SCALE : DWG. NO. :


DESIGNED :
1 : 100 HI/CVL/AM/AS/AR/EL/08
DRAWN :
ayoob
+1.00 GROUND FLOOR
CHECKED : Smitha
BACK ELEVATION DOOR COLOUR pm
REV. : DATE :

+0.00 TO MATCH TRAVANTINE APPROVED : 17-01-2017


1:150
DOOR COLOUR RAMP DWN
TO MATCH TRAVANTINE
ALUMINIUM PANELS PROJECT CODE : HI /cv/1401

FRONT ELEVATION