0.85 Fc'
ec' = 0.003 Sc
es'
As' - Aub Cc
Cub
50 43
As +
es
7 ST
20 dia e dia s
M-= 9.28 Tm
M =+
7.6
} d= 0.8
Persamaan Deformasi/Kompatibilitas :
1. ec' Cub
=
es d - Cub
0.003 Cub 0.129 - 0.003Cub = 0.002Cub
=
0.0020 43-Cub 0.129 = 0.002 Cub +0.003 Cub
Cub = 25.8 cm
aub = 0.85 x 25.8 = 21.93 cm
1. S H = 0 Sc + Cc = ST
3275.9 As + 111843= 4000 As
111843 = 724.1 As
Asb = 154.46 cm2
As'b = 126.50 cm2
Design
Cu = 24.8 cm
Au = 0.85Cu = 0.85 x 24.8= 21.08 cm
Persamaan Deformasi/Kompatibilitas :
1. S H = 0 Sc + Cc = ST
3276 As + 107508 = 4000 As
107508 = 724 As
As = 148.49 cm2
As' = 121.61 cm2
PERSAMAAN :
1. S H = 0 Sc + Cc = ST
Sc = 25.3 x 4000 = 101200.00 kg
Cc = 0.85 x 300 x 21.08 x 20= 5100.00 kg
St = 30.9 x 4000 = 123568.00 kg
2. S M = 0 Sc (d - d') + Cc (d - 0.5au) = Mn
Mn = 3808746.00 kg cm
Mu = f Mn Mu = 3046996.80 kg cm
= 30.47 Tm > M = 9.28 Tm
OK, dimensi & tulangan cukup
6d24 6d24
50 50
50 50
7d24 6d24
20 20
Tumpuan Lapangan
PERHITUNGAN DIMENSI & TULANGAN RANGKAP PADA BALOK
0.85 Fc'
ec' = 0.003 Sc
es'
As' - aub Cc
Cub
35 30
As +
es
5 ST
20 dia e dia s
Mu = 6.4 Tm
} d= 0.5
Keadaan Balance
Persamaan Deformasi/Kompatibilitas :
1. ec' Cub
=
es d - Cub
0.003 Cub 0.09 - 0.003Cub = 0.002Cub
=
0.0020 30-Cub 0.09 = 0.002 Cub + 0.003 Cub
Cub = 18 cm
aub = 0.85 x 18 = ### cm
1. S H = 0 Sc + Cc = ST
2000 As + 65025 = 4000 As
65025 = 2000 As
Asb = 32.51 cm2
As'b = 16.26 cm2
Persamaan Deformasi/Kompatibilitas :
1. ec' Cu ec' 10
= =
es' Cu - d' es' 10 - 5
0.003 10
=
es' 5
0.015 = 10 es'
es' = 0.0015 < 0.002
kg/cm2
karena tulangan tekan belum leleh,maka Fs'= 3000 kg/cm2
1. S H = 0 Sc + Cc = ST
1500 As + 36125 = 4000 As
36125 = 2500 As
As = 14.45 cm2
As' = 7.23 cm2
PERSAMAAN :
1. S M = 0 Sc (d - d') + Cc (d - 0.5au) = Mn
Mn = 18551993.75 kg cm
Mu = f Mn Mu = 14841595.00 kg cm
= 148.42 Tm > M = 6.4 Tm
OK, dimensi & tulangan cukup
52d24 52d24
35 35
104d24 52d24
20 20
Tumpuan Lapangan
PERHITUNGAN PEMERIKSAAN TULANGAN KOLOM DUA SISI
0.5 As
55
50
Pu
Mu
0.5 As
5
30
0.5 As
Sc
-
Cu = d = 50 au Cc Pnd
Mnd
es = 0 St 0
dia e
au = 0.85 x Cu = 0.85 x 50 = 42.500 cm
Sc = 0.5As.Fy = 10.05 x 2400 = 24120.000 kg
Cc = b x au x 0.85Fc = 30 x 42.5 x 0.85 x 300 = 325125.000 kg
St = 0 (Decompresi)
Persamaan statika :
(1). S H = 0
Sc + Cc - St - Pnd = 0
24120 + 325125 - 0 = Pnd
Pnd = 349245.0 kg
Pud = 0.65 x Pnd = 227009.250 kg
= 227.009 ton
(2). S M = 0
Sc(d - d') +Cc (d-0.5au) - Pnd (0.5h-d') - Mnd = 0
Mnd = ( 24120 x 45) + (325125 x 28.75) - (349245 x 22.5)
= 2574731.25 kgcm
= 25.747 tm
Mud = 0.65 x Mnd = 0.65 x 25.747
= 16.736 tm
3. Keadaan Balance :
ec' = 0.003 0,85fc'
es' Sc
Cu - au Cc
Pnb
+ Mnb
es
St
es = e y
Persamaan Deformasi/Kompatibilitas :
ec' Cu
=
es d - Cu
0.003 Cu 0.15 - 0.003Cu = 0.0012Cu
=
0.0012 50 - Cu 0.015 = 0.0012 Cu +0.003 Cu
Cub = 35.71 cm
au = 0.85 x 35.71 = 30.354 cm
Pnt
Mnt
+
es < e y St
Persamaan Deformasi/Kompatibilitas :
ec' Cu
=
es d - Cu
0.003 40
=
es 50 - 40
es = 0.00075
Fs = es x 2.106 = 1500 kg/cm2
Fy = 2400 kg/cm2
Fs < Fy , berati tulangan tarik belum leleh maka, Fs = 1500 kg/cm2
Persamaan statika :
(1). S H = 0
Sc + Cc - St - Pnt = 0
Pnt = 24120 + 260100 - 15075
Pnt = 269145.000 kg
Put = 0.65 x 269145 = 174944.25 kg
Put = 174.944 ton
(2). S M = 0
Sc(d - d') +Cc (d-0.5au) - Pnt (0.5h-d') - Mnt = 0
Mnt = ( 24120 x 45) + (260100 x 33) - (269145 x 22.5)
= 3612937.5 kgcm
= 36.129 tm
Mut = 0.65 x Mnt = 0.65 x 36.129
= 23.484 tm
5. Keruntuhan Tarik1 :
Coba, Cu = 28 cm < Cub = 35.71cm .
au = 0.85 x 28 = 23.8 cm
ec' = 0.003
es' Sc
- Cu Cc
d = 50
Pnr
+ Mnr
es
St
es > e y
Persamaan Deformasi/Kompatibilitas :
ec' Cu
=
es' Cu - d'
0.003 28
=
es' 28 - 5
es' = 0.0025
Fs = es' x 2.106 = 4929 kg/cm2 > fy --> tul.tekan sdh lleh
Fy = 2400 kg/cm 2
Fy < Fs', tulangan tarik sudah leleh maka Fs' = Fy = 2400 kg/cm2
Persamaan statika :
(1). S H = 0
Sc + Cc - St - Pnt = 0
Pnt = 24120 + 182070 - 24120
Pnt = 182070.0 kg
Put = 0.65 x 182070 = 118345.500 kg
Put = 118.346 ton
(2). S M= 0
Sc(0.5h - d') +Cc (0.5h-0.5au) + St (0.5h-d') - Mnr = 0
Mnr = (24120 x (27.5 - 5)) + (182070 x (27.5 - 11.9)) + (24120 x (27.5-5))
= 3925692.000 kgcm
= 39.257 tm
Mut = 0.65 x Mnt = 0.65 x 39.257
= 25.517 tm
6. Keadaan Tarik2 :
Coba, Cu = 10 cm < Cub = 35.71cm .
au = 0.85 x 10 = 8.5 cm
ec' = 0.003
es' Sc
- Cu Cc
d = 50
Pnr
+ Mnr
es
St
es > e y
Persamaan Deformasi/Kompatibilitas :
ec' Cu
=
es' Cu - d'
0.003 10
=
es' 10 - 5
es = 0.0015
Fs' = es' x 2.106 = 3000 kg/cm2
Fy = 2400 kg/cm2
Fy < Fs, tulangan tarik sudah leleh Fs' = Fy = 2400 kg/cm2
Persamaan statika :
(1). S H = 0
Sc + Cc - St - Pnr = 0
Pnr = 24120 + 65025 - 24120
Pnr = 65025.0 kg
Pur = 0.65 x 65025 = 42266.25 kg
Pur = 42.266 ton
(2). S Mditengah kolom = 0
Sc(0.5h - d') +Cc (0.5h-0.5au) + St (0.5h-d') - Mnr = 0
Mnr = (24120 x (27.5 - 5)) + (65025 x (27.5 - 4.25)) + (24120 x (27.5-5))
= 2597231.250 kgcm
= 25.972 tm
Mur = 0.65 x Mnr = 0.65 x 25.972
= 16.882 tm
Ringkasan M & P dalam 5 kondisi
No. Kondisi M P
( Tm ) (T)
1. Normal 0.0 304.8
2. Decompresi 16.7 227.0
3. Tekan 23.5 174.9
4. Balance 25.7 150.9
5. Tarik1 25.5 118.3
6. Tarik2 16.9 42.3
Diagram Interaksi
350
Aksial (ton)
300
250
200
150
100
50
0
0 5 10 15 20 25 30 35
momen (ton-meter)
kekuatan
batas
35 40
DESAIN KOLOM TULANGAN DUA SISI
Perhitungan Desin
assumsi : luas tulangan = 2 % dari luas Beton
As max = 6 % dari luas Beton
r min = 0.0058 As min = r b d
Pu0 = 2 x Pu = 436 Ton
Pno = Pu/ 248
Pn0 = ( Ac x 0.85Fc' ) + ( As x Fy )
= ( b x h ) x 0.85Fc' + ( 0.02 x b x h ) x Fy
= ( b x h ) x 0.85 x 300 + ( 0.02 x b x h ) x 2400
= ( 255+48 ) x ( b x h ) = 303 x ( b x h )
436000 = 303 x (b x h)
( b x h ) = 436000 / 303
( b x h ) = 1438.94 Jika h= 1.5 b
b x (1.5b)) = 1438.94
b2 = 959.29 b= 959.29 = 30.97
b= 30.00 cm
h= 45.00 cm
ec' = 0.003 Sc
es'
Cub Cc
60 55 Pnb
Mnb
5 St
es = e y
30
Persamaan Deformasi/Kompatibilitas :
ec' Cub
=
es d - Cu
0.003 Cub 0.165 - 0.003Cu = 0.0012Cub
=
0.001 55 - Cub 0.165 = ( 0.003 + 0.0012 )Cub
Cub = 39.29 cm
aub = 0.85 x 39.29 33.40 cm
Persamaan statika :
(1). S H = 0
Sc + Cc - St - Pnb = 0
Pnb = 28944 + 255483.23 - 28944
Pnb = 255483.23 kg
Pub = 0.65 x 255483.23 = 166064.0995 kg
Pub = 166.06 ton
(2). S M = 0
Sc(d - d') +Cc (d-0.5au) - Pnb (0.5h-d') - Mnb = 0
Mnb = ( 28944 x 50) + (255483.23 x 38.30175) - (255483.23 x 25)
= 4845574.05 kgcm
Mub = 0.65x4845574.05 = 3149623.13 kg
Mub = 31.5 tm < Mu = 12.8tm ok ukuran kolom cukup.
3. Keadaan Decompresi
es = 0 St 0
dia e
Persamaan statika :
(1). S H = 0
Sc + Cc - St - Pnd = 0
28944 + 357637.5 - 0 = Pnd
Pnd = 386581.5 kg
Pud = 0.65 x Pnd = 251277.98 kg
= 251.278 ton
(2). S M = 0
Sc(d - d') + Cc (d-0.5au) - Pnd (0.5h-d') - = 0
= ( 28944 x 50) + (357637.5 x 52.5) - (386581.5 x 25)
= 3092948.44 kgcm
Mnd= 30.929 tm
Mud = 0.65 x Mnd = 0.65 x 30.929
= 20.104 tm
No. Kondisi M P
( Tm ) (T)
1. Normal 0.0 336.0
2. Decompresi 20.1 251.3
3. Balance 31.5 166.1
Diagram Interaksi
400
350
300
Pu
250
200
150
100
50
0
0 5 10 15 20 25 30 35
Mu
kekuatan batas gaya luar
salah!! yg terpasang, hrs lebih besar dari n
< As min
PERHITUNGAN DIMENSI & TULANGAN TUNGGAL PADA BALOK
ec' = 0.003 0,85fc'
cub - aub Cc
36
As +
es = ey
4 ST
20 dia e dia s
M-= 10.24 Tm
Fc' = 250 kg/cm2
Fy = 4000 kg/cm2 KEADAAN BALANCE
- Persamaan Deformasi/Kompatibilitas :
ec' Cub
=
ey d - Cub
0.003 Cub 0.108 - 0.003Cub = 0.002Cub
=
0.0020 36-Cub 0.108 = 0.002 Cub +0.003 Cub
Cub = 21.6 cm
aub = 0.85 x 21.6 = 18.4 cm