Professional Documents
Culture Documents
N R Ks N/R (1/6) R/Ks Y.estim Normalaized Error 2
N R Ks N/R (1/6) R/Ks Y.estim Normalaized Error 2
N R Ks N/R (1/6) R/Ks Y.estim Normalaized Error 2
C
d
n R n/R^(1/6) X(ft/sec)
0.033 10.9 0.0221620292 1.27
0.036 7.38 0.0258004001 1.27
0.035 6 0.0259642731 1.27
0.029 3.97 0.0230462135 1.34
0.028 3.89 0.0223271401 1.38
0.028 3.35 0.0228902515 1.27
0.025 3.2 0.0205943622 1.28
0.036 3.06 0.0298778216 1.84
0.038 2.57 0.032468439 1.6
0.042 3.92 0.0334478556 1.66
0.044 3.32 0.0360243646 1.5
0.047 3.01 0.0391144092 1.23
0.039 2.76 0.0329290923
0.088 5.27 0.0667084582
0.107 4.52 0.0832135478
0.098 3.6 0.0791605845
(estimated-actual)^2 A 14.2267441694
0.000000617 b 2.6721189541
6.22937752301483E-06
3.77814696070469E-06
1
n/R^91/6)
6.46560446036269E-06
1.11853655358314E-05
1.15916786035955E-05
0.000034783
1.01781915762163E-05 0.1
2.49026982095051E-05
0.000011742
f(x) = -0.0054481181 ln(x) + 0.0569770973
5.29333766272989E-06 R = 0.2523025979
1.47414424886298E-08
0.01
1.30890933279196E-05
10 100 1000
0.001334415 meas ured
R/Ks
0.0027191422 Logari thmi c
0.0021783885 (meas ured)
0.0063718159 estimated
10.7848597397
0
0.045
Y.Estimated Normalized error ^2 (estimated-actual)^2
0.04
0.0197126741 0.012214747 5.99934063566E-06
n/R^1/6
0.035
0.0197126741 0.0556746264 3.706040765084E-05
0.03
0.0197126741 0.0579735499 3.9082490703382E-05
0.025
0.0235266243 0.0004345367 2.3079458110318E-07
0.02
0.0255323041 0.0206079276 1.0273076355443E-05
0.015
0.0197126741 0.0192704181 0.000010097
0.020283064 0.0002284844 9.6906560713532E-08 0.01
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0 meas ured
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9
Estimated
V Logari thmi c
(Estimated)