with the successful completion of this minor training report . First of all, gratitude
towards my university which provided me the opportunity to undergo the summer
training of 1 month during on 23-06-2017 to 23-07-2017 . I would like to express
my gratitude to Mr. Deovrat Yamraj (site Engg.) & Er. Abishek kumar and staff
who gave necessary guidance and support during the tranning and provided
relevant data, drawing & documents .I paying my sincere gratitude towards all who
guided me to prepare of this report .
Details Of Project
1. Types of bridge Rail Over Bridge
Based on Function
Based on Level of Foot bridge
Crossing
Highway bridge
Over bridge Rail way bridge
Tensile Strength 617.7 651.7 639.2 661.8 08% more then actual 0.2%
(N/mm2) 4 proof stress but not less then
545 N/mm2
Yield Stress (N/mm2) 504..7 532.4 538.8 538.5 Not less then 500N/mm2
1
Elongation % 20.0 25.0 23.7 19.0 Minimum - 12%
Material test Results
Cement :-
S.n. Test Result
1. Specific Gravity 3.150
3. Normal Consistency 32 %
6. Soundness of cement 1 mm
Cement
1. 10 100%
2. 4.75 97.97%
3. 2.36 94.47%
4. 1.18 77.07%
5. 0.6 50.70%
6. 0.3 8.50%
7. 0.15 0.10%
Test of Aggregate
Coarse Aggregate :-
20 mm 1. Specific Gravity 2.760