RAB Gazebo
RAB Gazebo
KEGIATAN :
PEKERJAAN :
LOKASI :TANJUNG
C GAZEBO(3Unit) 31,308,949.10
I PEKERJAANPERSIAPAN
2 Pengukuran&PemasanganBowplank 30.00 m' 2 37,780.05 1,133,401.50
3 PapanNamaProyek 1.00 Ls 350,000.00 350,000.00
1,483,401.50
II PEK.RANGKABAWAH
1 TongkatUlin5/102m+Sunduk 0.29 m3 3 8,681,447.50 2,484,630.27
2 Galamdia.10cm2mterpasang 54.00 btg 10,000.00 540,000.00
3 SloofUlin5/7(ukur) 0.15 m3 3 8,681,447.50 1,312,634.86
4 Gelagar4/6(ukur)Ulin 0.09 m3 3 8,681,447.50 750,077.06
5,087,342.20
III PEK.TIANG,LANTAIPAPAN
1 Lantaipapanulin2/18 17.28 m2 6 162,443.05 2,807,015.90
2 Pas.TiangUlin5/10(ukur) 0.16 m3 4 9,195,890.00 1,434,558.84
3 Pas.Pagar 0.21 m3 7,920,000.00 1,675,080.00
4 Pas.SuaiTiang 0.02 m3 7,920,000.00 166,320.00
6,082,974.74
IV PEK.RANGKAKAPATAP
1 KudakudaAtaplanan5/10&Gording5/10 0.20 m2 7 4,185,588.00 822,719.18
2 RangkaAtapLanan 55.37 m2 8 59,274.05 3,282,134.55
3 AtapGentengMetal 55.37 m3 9 123,234.87 6,823,785.87
4 ListPlank2x2/20 27.48 m3 11 177,424.50 4,875,625.26
5 Pemuung/NokAtapMetal 12.90 m' 10 66,536.64 858,322.59
6 RingBalk5/7(ukur)Lanan 0.10 m3 4 9,195,890.00 926,945.71
17,589,533.16
V PEKERJAANPENGECATAN
1 Catdasar+Catkilappadatiang,pagar, 34.90 m2 12 30,539.25 1,065,697.49
listplankdansuaiTiang ls
1,065,697.49
RENCANA ANGGARAN BIAYA
KEGIATAN :
PEKERJAAN :
LOKASI : TANJUNG
4 Gording 4/6 dan suai angin 4/6 kayu galam Gording 3.00 0.04 0.06 4 12 m3
Suai angin 2.50 0.04 0.06 2 5
V PEKERJAAN PENGECATAN
1 Cat kilap pada tiang, pagar dan listplank tiang 2.60 0.05 0.1 4 m2 3.12
pagar ver 2.20 0.05 0.05 8 m2 3.08
hor 0.45 0.05 0.05 40 m2 3.60
listplank 9.16 0.20 m2 1.83
11.63
ANGGARAN BIAYA
VOUME
m3
0.09
0.01
0.10
0.05
0.03
0.05
0.07
0.01
0.04
0.02
0.06
0.03
0.01
0.04
0.01
0.00
0.01
0.00
0.02
-
0.03
ANALISA HARGA SATUAN
KEGIATAN :
PEKERJAAN : TANJUNG
LOKASI 0
1 BAHANBANGUNAN
1 BatuKali/Gunung M3 77,000.00
2 KoralBeton M3 66,000.00
3 PasirUrug M3 71,500.00
4 PasirPasang M3 49,500.00
5 PasirBeton M3 44,000.00
6 BatuBelah23 M3 176,000.00
7 Sirtu M3 77,000.00
8 Aspal Kg 10,010.00
9 KayuBakar M3 220,000.00
10 TempatMemasakAspal Bh 165,000.00
11 AlatBantu Set 110,000.00
12 TimbunanPilihan M3 38,500.00
13 TimbunanBiasa M3 33,000.00
14 Batapress Bj 2,200.00
15 SemenPC50Kg Zak 66,000.00
16 Batu bata Bj 550.00
17 Besi beton Kg 13,750.00
18 Kawat Beton Kg 17,600.00
19 Kayu Begisting M3 1,320,000.00
20 Minyak Begisting Ltr 22,000.00
21 Kayu Galam dia 8-10 cm pjg 4m Btg 22,000.00
22 BalokLanan M3 2,750,000.00
23 PapanLanan M3 3,025,000.00
24 BalokUlinKlas1 M3 6,600,000.00
25 PapanUlinKlas1 M3 7,150,000.00
26 Plywoodtbl9mm Lbr 134,200.00
27 GentengMetaltbl0,3mm m2 96,250.00
28 PemuungMetal lbr 37,400.00
29 PakuGentengMetal Kg 24,200.00
30 PakuBiasa Kg 19,800.00
31 PakuUlin Kg 24,200.00
32 Keramik20x20 M2 57,750.00
33 Keramik30x30 M2 60,500.00
34 Keramik40x40 M2 91,300.00
35 PipaPVC2" M' 5,270.83
36 PipaPVC3/4" M' 1,370.42
37 PipaPVC4" M' 15,285.42
38 KacaRaybentbl5mm M2 165,000.00
39 KunciTanam bh 99,000.00
40 EngselPintu bh 16,500.00
41 BesiSiku Kg 8,250.00
42 Kalsiboard3mm Lbr 60,500.00
43 Kalsiplank M' 71,500.00
44 ListPlafondGipsum M' 22,000.00
45 ClosedJongkok bh 66,000.00
46 SemenWarna kg 5,500.00
47 CatTembok kg 19,250.00
48 CatKilap kg 39,600.00
49 CatDasar kg 18,700.00
50 Dempul kg 18,700.00
51 MinyakCat Ltr 23,100.00
52 Amplas Lmbr 4,400.00
1 2 3 4
2 TENAGAKERJA
1 Mandor Orang/hari 73,920.00
2 KepalaTukang Orang/hari 73,920.00
3 Tukang Orang/hari 58,712.50
4 PembantuTukang Orang/hari 43,890.00
5 Pekerja Orang/hari 53,240.00
6 Operator Orang/hari 140,800.00
7 PembantuOperator Orang/hari 70,400.00