I&P 49 A305: METHOD STATEMENT FOR RELOCATION OF FLOOR TRAP

1) Check the site condition of any obstruction such as debris or loose materials.

2) Mark the new floor trap position on slab to be relocated.

3) Use drilling machine to drill new hole for the floor traps.

4) Make sure the drilled materials doesnt fall or damaging other structure.

5) Clean the drilled area from debris or loose materials.

6) Install a new floor trap sleeve with non-shrinkage grout to surrounding of sleeve.

7) For old holes, install formwork and cast the holes to cover it.