CORRECTIVE /PREVETIVE ACTION PLAN

This section provides a detailed description of the corrective actions to be taken at the Site. The
Remedial program will include the development and submittal of documents, public outreach
Activities and implementation of the proposed actions to complete the work in accordance
with safety requirements.

REMEDIAL OBJECTIVES

The primary objectives of this remediation project are as follows:

Implement corrective actions to address toxic gas impacted soil and groundwater in Two primary
remedial areas of Ajman proposed site.

Excavate source-area soils and other media that are impacted with related Contaminants in
excess of applicable soils which exhibit nuisance characteristics, and transport and dispose these
materials offsite;

Remove (if encountered), treat, and discharge to the combined sewer impacted Ground water
from the excavations;

Perform in-situ bioremediation of groundwater by adding Oxygen Releasing Compound (ORC-


A) to the excavation prior to backfilling to further reduce contaminant
Concentrations to acceptable levels
Removal of shallow, accessible, subsurface utilities and sub-slab structures associated With Site
drainage and sewer system
Partial demolition of remaining floor slabs and foundation remnants
Development of a Remedial Construction / Closure Report and an Environmental
Management Plan

Excavation Backfill

Onsite soils will be used as backfill in the excavation(s) first before utilizing imported soils. We
Have assumed that approximately of material will be generated for potential reuse
onsite. The remaining fill will be obtained from a stockpile of clean granular soil .
Backfill will be placed in 1 to 2-ft. lifts and compacted. In the deeper reaches of the
Excavations it will not be possible to place personnel and compaction equipment due to
Safety concerns, and therefore the excavator bucket will be used for compaction of the
Deeper backfill, once the excavation depth has been reduced sufficiently, backfill
Compaction will be accomplished in lifts with a vibratory roller. A minimum of 2 in. of topsoil from a
commercial source will be placed at the surface of Level with the existing grade.