The document outlines the key steps in a reclamation design flowchart:
1) Conduct geotechnical investigations and soil testing to characterize soil properties and develop a ground model.
2) Use the soil properties and ground model to design pre-loading with prefabricated vertical drains and determine construction sequencing using finite element modeling.
3) Monitor instrumentation during construction to ensure criteria are met before proceeding to next stage.
4) Conduct back analysis after pre-loading to determine ultimate and residual settlements.
The document outlines the key steps in a reclamation design flowchart:
1) Conduct geotechnical investigations and soil testing to characterize soil properties and develop a ground model.
2) Use the soil properties and ground model to design pre-loading with prefabricated vertical drains and determine construction sequencing using finite element modeling.
3) Monitor instrumentation during construction to ensure criteria are met before proceeding to next stage.
4) Conduct back analysis after pre-loading to determine ultimate and residual settlements.
The document outlines the key steps in a reclamation design flowchart:
1) Conduct geotechnical investigations and soil testing to characterize soil properties and develop a ground model.
2) Use the soil properties and ground model to design pre-loading with prefabricated vertical drains and determine construction sequencing using finite element modeling.
3) Monitor instrumentation during construction to ensure criteria are met before proceeding to next stage.
4) Conduct back analysis after pre-loading to determine ultimate and residual settlements.
estimate the key geotechnical properties G.I. Interpretation Detailed Design Instrumentation and Monitoring Back analysis of ground
Based on the geotechnical When surcharge at full height carry
properties of the ground and the Monitor the geotechnical out back analysis of settlement Geotechnical desk study Soil classification ground model determine layout and instruments against AAA levels monitoring data using Asaoka spacing of PVDs analysis to determine the ultimate primary settlement of the soil FEM modelling using Plaxis to Determine geotechnical and Record the undrained shear develop the design construction Soil sampling and laboratory testing consolidation properties of soil strength and instrumentation sequence and predict the lateral Use Asaoka analysis to determine strata to facilitate design reading at key construction stages movement of the ground back analysed ch of the Marine and check if they meet criteria to Deposits progress to next stage Develop geotechnical section and Develop Instrumentation and In-situ testing ground models Monitoring layout plans Conduct settlement analysis to If criteria not met design remedial determine the residual settlement measures using, set additional of the ground post surcharge check points and continue removal Develop checkpoints of soil monitoring strength and instrumentation readings at key construction stages Determine the surcharge removal time such that post reclamation Monitor settlement and porewater settlement are limited to 500mm in Develop AAA levels for the pressure dissipation to determine 50 years as required in the project geotechnical instruments based on the degree of consolidation specifications results of finite element analysis
Carry out settlement analysis to
determine the total consolidation settlement of the ground
Determine the settlement required
to ensure the post reclamation residual settlement are limited to 500mm in 50 years