bbv19342 PDF
bbv19342 PDF
Marine application
Civil engineering - Installation - Instruction of use
April 2012
Content
General 3
Glossary 3
Symbols 3
Recommendations 4
Standard tightening torques 4
List of bags and accessories 5
Civil engineering
Content 6
Installation
Content 16
Cubicle packaging 17
Cubicle unit packing 17
Handling instructions 18
Land packaging 18
Ocean shipment packaging 18
Handling using a sling 18
Handling by rolling 19
Storage 19
Installation instructions 21
Unpacking cubicles 21
Placing cubicles in a switchboard 21
Surface condition 22
Floor quality 22
Cubicle fastened on rails 22
Linking two cubicles 23
Assembling a MOTORPACT cubicle / MTP transition enclosure 24
Rack-in check 25
Removing the mobile part transport fixations 25
Installing the electric connections of the busbars and MV cables 26
Installing the main earth connection 28
BBV19342.indd version 02
Content
Installing busbars 29
Installing busbars between MTP and the MOTORPACT cubicle 32
Placing MV cables on AD cubicle 34
MV cable screen earthing 40
LV cable routing and connection 41
Installing the tunnels 43
Installing the end sheets 48
Tests on site 54
Checking and cocking the internal arcing detector 54
Instruction of use
Content 55
General description 56
Warning for readers 56
AD cubicle 56
TT1, TT2 cubicles 57
CL-GL cubicles 57
Withdrawable mobile part 58
Identification 60
Read the inscriptions on the front panel 60
Operating Instructions 70
Extracting or inserting the mobile part 70
Racking-in the mobile part 75
Racking-out the mobile part 76
Closing the earthing switch 77
Opening the earthing switch 79
Racking-in VT fuses 81
Racking-out VT fuses 82
Preventing access using padlocks 83
Locking with key locks (option) 85
Locking with electromagnet (option) 86
Corrective maintenance 87
Replacement of VT box fuses 87
Index 89
version 02 BBV19342.indd
General
Mobile part
LF SF6 withdrawable circuit breaker which is used in AD
and CL cubicles
ERT Tool to remove/insert the mobile part from the switchgear.
The tool allows to place the mobile part on the floor.
Symbols
Operation position.
BBV19342.indd version 02
General
Racked-in position.
Racked-out position.
Insertion/extraction position.
Recommendations
Height (H) of ceiling for installation The ceiling must be 2.6 m high for a small tunnel and 2.8 m high for a tall tunnel.
of an anti-arc IPX1 or IPX2 tunnel According to switchboard configuration, external extraction may be
recommended (consult us). The following constraints have to be considered:
- Exhaust duct as big as possible,
- Exhaust duct directed towards the top.
Installation above the switchboard All installation of equipment, such as lights is forbidden to avoid walking on
the switchgears roof to replace them.
Marking
version 02 BBV19342.indd
General
BBV19342.indd version 02
Civil engineering
Content
version 02 BBV19342.indd
Civil engineering Dimensions and weights
BBV19342.indd version 02
Civil engineering Dimensions and weights
Dimensions MTP
1250A 2500A 3150A
Width (mm) L 375 375 375
Cubicle height (mm) H1 2300 2300 2300
Total height (mm) H2 Small tunnel 2530 2530 2530
Total height (mm) H2 Tall tunnel 2732 2732 2732
Depth (mm) P1 1665 1665 1665
Depth (mm) P2 2335 2335 2335
Weight (kg) 240 275 310
version 02 BBV19342.indd
Civil engineering Space to be provided
around a switchboard
BBV19342.indd version 02
Civil engineering Space to be provided
around a switchboard
A: access to room
B: main earth bus
C: reserved floor space, if necessary,
for routing of LV cables
D: reserved floor space for routing
of MV cables
E: MV cable clamps.
A: access to room
B: main earth bus
C: reserved floor space for routing
of MOTORPACT(1) MV cables
D: reserved floor space for routing
of MCset 1-2-3 MV cables
10 version 02 BBV19342.indd
Civil engineering Space to be provided
around a switchboard
Switchboard location
in the installation room
(*): minimum dimension (in mm)
(1): AD1, CL1, TT1
(2): AD2, TT2, CL2, DI2
(3): AD3, CL3.
D: access to room
F: closing plates.
BBV19342.indd version 02 11
Civil engineering Space to be provided
around a switchboard
Position of MV cables
AD1
AD2
AD3 (1250 A)
AD3 (2500 A)
12 version 02 BBV19342.indd
Civil engineering Space to be provided
around a switchboard
AD3 (3150 A)
BBV19342.indd version 02 13
Civil engineering Floor finishing and support
members fastening
Floor finishing
Surface condition Floor flatness is such that a 2 meter rule moved over all surfaces and
in all directions, does not display a difference of more than 5 mm.
Floor Strength The floor must have a compression withstand u 33 MPa to roll the extraction
tool on it without any damage.
14 version 02 BBV19342.indd
Civil engineering Incoming configuration
of MV cables
General information The civil engineering execution and Some recommendations are given
the installation of MV cables must take below.
several inputs into account:
Other incoming configurations are
- The bending radius of the cables possible, particularly if there is greater
- Cable slack to push and pull them clearance under the FUs.
- Cable handling, according to incoming
configurations and free cable length from Note: if the cable box is used, adapt
its point of insertion in the maintenance the depth of the maintenance space.
space.
Should you have questions concerning
a configuration, contact your nearest
Schneider Electric representative.
Note: the dimensions indicated can be greater in the case of shielded medium
voltage (MV) dry cables.
BBV19342.indd version 02 15
Installation
Content
Cubicle packaging 17
Cubicle unit packing 17
Handling instructions 18
Land packaging 18
Ocean shipment packaging 18
Handling using a sling 18
Handling by rolling 19
Storage 19
Installation instructions 21
Unpacking cubicles 21
Placing cubicles in a switchboard 21
Surface condition 22
Floor quality 22
Cubicle fastened on rails 22
Linking two cubicles 23
Assembling a MOTORPACT cubicle / MTP transition enclosure 24
Rack-in check 25
Removing the mobile part transport fixations 25
Installing the electric connections of the busbars and MV cables 26
Installing the main earth connection 28
Installing busbars 29
Installing busbars between MTP and the MOTORPACT cubicle 32
Placing MV cables on AD cubicle 34
MV cable screen earthing 40
LV cable routing and connection 41
Installing the tunnels 43
Installing the end sheets 48
Tests on site 54
Checking and cocking the internal arcing detector 54
16 version 02 BBV19342.indd
Installation Cubicle packaging
Package Content
Cable floor
- Bottom plates
- Bottom closure
- Cable support sleeves
- Bag of screws and bolts
3 - Busbars
- Cable connection brackets
4 - Busbar covers
BBV19342.indd version 02 17
Installation Handling instructions
Land packaging
Functional Unit
Functional unit
FU with circuit-breaker
Assembled switchboard
18 version 02 BBV19342.indd
Installation Handling instructions
Handling by rolling
Storage
Long storage After long storage, clean insulating parts before operation.
BBV19342.indd version 02 19
Installation Installation and operation
recommendation
The switchgears resistance Need for good implementation Ensure that draughts and/or thermal
of cable-end restoration: shocks are avoided in all cubicle
to ageing in an MV substation compartments in order to avoid the
New cold retractable or slip-on creation of dew points (sources of
depends on 3 main factors: technology offers ease of installation partial discharges).
that favours resistance over time. The equipment must be installed
in conformity with the relevant IEC
Their design allows them to used in standard. Outside of these normal
polluted environments with harsh usage conditions, we recommend
climatic conditions. contacting Schneider Electric to
determine the operations to be carried
out as well as their frequency according
Impact of the relative humidity to the actual service conditions.
factor:
Ventilation control:
Installing a heating device is essential
in climates with high relative humidity Grid size must be suited to the power
levels and major temperature dissipated in the substation. These
differences. grids must be placed exclusively
in the vicinity of the transformer, in
order to avoid air circulation on the LV
switchboard.
Operation and maintenance It is strongly advised to periodically Our service center is at your
carry out, a few operation cycles on disposal at any time:
operating devices.
- To diagnose the installation,
Outside normal conditions of use,
(between -5C and 40C , absence - To offer suitable maintenance
of dust, corrosive gas, etc.), it is operations,
recommended to
examine, with our Schneider Electric - To offer maintenance contracts,
services center, the steps to be
taken, in order to ensure correct - To offer adaptations.
operation of the installation.
See the Maintenance guide (DEAI03).
20 version 02 BBV19342.indd
Installation Installation instructions
Unpacking cubicles
BBV19342.indd version 02 21
Installation Installation instructions
Surface condition Floor flatness is such that a 2 meters rule moved over all surfaces and in all
directions, does not display a difference of more than 5 mm.
Floor strength The floor must have a compression withstand u 33 MPa to roll the extraction tool
on it without any damage.
Cubicle fastened on rails Note: remove the front panel if the cubicle is fitted with VT, it is first necessary
to remove them, see the chapter Instructions for access to
the interior of a cubicle.
Pick from the two hardware bags B Place the screws and tighten them.
and C.
Pick from the two hardware bags A Place the screws and tighten them.
and B.
22 version 02 BBV19342.indd
Installation Installation instructions
Installing the inter cubicle gasket Place the self-adhesive inter cubicle
gasket along the full height of the right
side of the cubicle, except on the top
Access to the fastening points: wireway of the cubicle.
See chapter Instructions for access to the interior
of a cubicle and the chapter Removing the mobile This operation is not necessary for
part transportation devices. the cubicle at the right extremity
of the switchboard.
Assembling cubicles
BBV19342.indd version 02 23
Installation Installation instructions
Assembling a MOTORPACT
cubicle/ MTP transition enclosure
Left-hand assembly
Right-hand assembly
Implementation:
24 version 02 BBV19342.indd
Installation Installation instructions
Rack-in check Each time a cubicle is linked to another For the insertion and rack-in
one, check that the mobile can be of the mobile part as well as closing
racked-in and locked in position the door, refer to the operating manual
properly. (07897302) in the chapter on
Operating instructions.
Removing the mobile part To extract the mobile part and to open the door, refer to operating manual
in the chapter on Operating instructions.
transport fixations The operations described here after, must only be carried out once the cubicle
has been placed and secured on the floor.
On LF circuit breaker
On a ROLLARC contactor
On an EVOLIS circuit-breaker
BBV19342.indd version 02 25
Installation Installation instructions
26 version 02 BBV19342.indd
Installation Installation instructions
BBV19342.indd version 02 27
Installation Installation instructions
A: located at the base of the cubicle Pick the self adhesive gasket from
B: located in the middle of the cubicle. the hardware bag.
Install the link by sliding it from cubicle Place the bolt and tighten it.
2 to cubicle 1. Use only screws HM8x30.
28 Nm tightening torque.
Connect the earth bar to the buildings earth at the end of the switchboard, on the
right and on the left, place the specific link with the oblong hole inside the cubicle.
28 version 02 BBV19342.indd
Installation Installation instructions
Installing busbars This connection is done during Place the busbar between the 2
the installation of each cubicle. previously assembled cubicles
(refer to chapter on Principle
Access the busbars through the cubicle of assembling busbars).
side. If this is not possible, access
through the interior of the cubicle Tighten the fixation screws from
(refer to chapter on Instructions for the head side.
access to the interior of a cubicle). 50 Nm tightening torque.
1250 A busbars
BBV19342.indd version 02 29
Installation Installation instructions
2500 A busbars
3150 A busbars
30 version 02 BBV19342.indd
Installation Installation instructions
Cover assembly principle Retrieve: from package 4 of the cubicle packaging, the covers.
(depending on needs)
Close the covers on the bars by Place the half-covers on the busbar
tightening the wire ties through connection.
the notches.
BBV19342.indd version 02 31
Installation Installation instructions
A: nut
B: contact washer
C: flat washer
D: M10 x 40 screws
E: 1 x (76 x 9,5) per phase
F: 2 holes shim
G: M10 x 60 screws
H: 1 hole shim.
32 version 02 BBV19342.indd
Installation Installation instructions
A: nut
B: contact washer
C: flat washer
D: M10 x 70 screws
E: 3 x (76 x 9,5) per phase
F: 1 hole shim
G: M10 x 80 screws.
BBV19342.indd version 02 33
Installation Installation instructions
General information
A: 3 single-pole cables
B: 1 tri-pole cable.
MV cable maintenance
- Cable support
- Flanges
- Floor plates.
34 version 02 BBV19342.indd
Installation Installation instructions
Surge arrester
This operation must only be carried out after dielectric tests,
and before the connection of medium voltage cables to the FU.
Removing
Installing
Carry out the operations in the reverse order
of removal.
Tightening torque
B: 50 Nm
E: 20 Nm.
BBV19342.indd version 02 35
Installation Installation instructions
B: 50 Nm tightening torque.
36 version 02 BBV19342.indd
Installation Installation instructions
Put back the bars with new washers. Dielectric tests must be carried
Install the cable lugs inside the bars out before connecting the surge
and place the screw head outside arresters.
the bars.
Apply standard tightening torque For the connection of surge arresters,
depending on the diameter of refer to chapter on Surge arresters.
the bolt. Tightening torque:
B: 50 Nm
A: screw E: 20 Nm.
B: washer
C: nut
D: lug.
Put back the bars with new washers. Dielectric tests must be carried
Install the cable lugs inside the bars out before connecting the surge
and place the screw head outside arresters.
the bars.
Apply standard tightening torque For the connection of surge arresters,
depending on the diameter of refer to chapter on Surge arresters.
the bolt.
Tightening torque:
A: screw B: 50 Nm
B: washer E: 20 Nm.
C: nut
D: lug.
BBV19342.indd version 02 37
Installation Installation instructions
Note: assembly sequence of the bolts for the cable Connect the cables on the link.
heads:
Apply standard tightening torque
1: M10 x 30 screws depending on the diameter of
2: M10 washers the bolt.
3: M10 nuts.
The cable support is installed after
the row of cable is installed
(see chapter on MV cable
maintenance on AD cubicle).
38 version 02 BBV19342.indd
Installation instructions
AD2 1 cable per phase Place the cables through the toroids.
Note: assembly sequence of the bolts for the cable Connect the cables.
heads:
1: M10 x 30 screws Apply standard tightening torque
2: M10 washer depending on the diameter
3: M10 nuts. of the bolt.
AD2 2 cables per phase Place the cables through the toroids.
AD3 2 cables per phase
Note: assembly sequence of the bolts for the cable Connect the cables.
heads:
1: M10 x 30 screws Apply standard tightening torque
2: M10 washer depending on the diameter of
3: M10 nuts. the bolt.
BBV19342.indd version 02 39
Installation Installation instructions
For single-pole or two-pole toroid CT The braid connection is done inside In all cases, the insulated MV cable
the cubicle. screen braids must go through
the toroids before connection to
the switchboard main earth bar.
B: 2 three-pole cables
2 cables per phase
6 earthing braids
C: 3 single-pole cables
1 cable per phase
3 earthing braids
D: 6 single-pole cables
2 cables per phase
6 earthing braids.
In all cases, the MV cable screen braids The braid earth connection is done
must be insulated and go through the on the switchboard earth bars inside
zero frequence toroid before connection the maintenance space.
to the switchboards earth. Example: one cable per phase, 3 braids
to be connected. Two cables per phase,
6 braids to be connected.
40 version 02 BBV19342.indd
Installation Installation instructions
Remove the roof on each cubicle Remove the cubicle cable troughs.
(6 screws).
Place the power supply lead cable Connect the wiring to the terminal
inside the trough. Connect the wiring blocks.
from the power supply lead cable for
each cubicle through the cable glands. Reassemble the roofing sheets
Place back the trough. (6 screws per sheet).
High LV box
Place the power supply lead cable Connect the wires to the terminal blocks.
at the top of the LV boxes of the
switchboard.
BBV19342.indd version 02 41
Installation Installation instructions
42 version 02 BBV19342.indd
Installation Installation instructions
BBV19342.indd version 02 43
Installation Installation instructions
2/ Fix the feet (4) onto the cubicle using two screws
(B).
3/ Fix the roof (2) onto the sheet (1) and (3) using
two screws (D) for MCset 1 and three screws (D)
for MCset 2 and MCset 3.
4/ Fix the roof (2) on the feet (4) using two screws (D).
44 version 02 BBV19342.indd
Installation Installation instructions
2/ Fix the sheet (2) onto the tunnel feet at the front.
BBV19342.indd version 02 45
Installation Installation instructions
46 version 02 BBV19342.indd
Installation Installation instructions
1/ Mount the support sheets (1) first and the feet (5).
BBV19342.indd version 02 47
Installation Installation instructions
48 version 02 BBV19342.indd
Installation Installation instructions
BBV19342.indd version 02 49
Installation Installation instructions
50 version 02 BBV19342.indd
Installation Installation of a FU equipped with
electromagnetic locking options
Initial status:
- The earthing switch is closed,
- Selector 4 is in the locked closed
position.
Disassemble the VPIS without Insert a screwdriver via the box hole.
disconnecting the wiring.
Push back and hold in place Open the earthing switch, inserting
the electromagnet (A) using the the crank in reference 5 until the
screwdriver, then pull towards you mechanical indicator light changes
and turn the selector to the right in the status.
operation position.
BBV19342.indd version 02 51
Installation Installation of a FU equipped with
electromagnetic locking options
Figure 1
Figure 2
52 version 02 BBV19342.indd
Installation Steps to be taken
for tests and inspection
Power frequency dielectric test This test can be carried out in one This procedure requires to defeat
single operation. the interlocks.
All the VTs and surge arresters must The insulation level of the switchgear
This test must be performed be disconnected during this test. can be tested on site. The test voltage
by trained & authorized people. shall be 80 % of the rated short-
More over, one of the FU feeder must duration power-frequency withstand
have its lower panel open to connect voltage of the switchgear as specified
the test cable. in clause 7.105 of IEC 62271-200.
Raise and block the door lock rod using Press the pushbutton I to close the
a 55 mm U shim. circuit-breaker
BBV19342.indd version 02 53
Installation Tests on site
1: metal rod,
2: support.
54 version 02 BBV19342.indd
Instruction of use
Content
General description 56
Warning for readers 56
AD cubicle 56
TT1, TT2 cubicles 57
CL-GL cubicles 57
Withdrawable mobile part 58
Identification 60
Read the inscriptions on the front panel 60
Operating Instructions 70
Extracting or inserting the mobile part 70
Racking-in the mobile part 75
Racking-out the mobile part 76
Closing the earthing switch 77
Opening the earthing switch 79
Racking-in VT fuses 81
Racking-out VT fuses 82
Preventing access using padlocks 83
Locking with key locks (option) 85
Locking with electromagnet (option) 86
Corrective maintenance 87
Replacement of VT box fuses 87
BBV19342.indd version 02 55
Instruction of use General description
Warning for readers As the MCset range is very extensive and presents a vast number of front panel
options, we have decided to present a Functional Unit presentation equipped with
the maximum switchgear.
AD cubicle
AD1 630/1250 A
AD2 630/1250/1600 A Incomer/Feeder Incomer/Feeder
AD3 2500/3150 A without VT or with fixed VT with withdrawable VT fuses
56 version 02 BBV19342.indd
Instruction of use General description
BBV19342.indd version 02 57
Instruction of use General description
LF1
LF2
LF3
Disconnector truck LF
58 version 02 BBV19342.indd
Instruction of use General description
ROLLARC 400
Evolis
BBV19342.indd version 02 59
Instruction of use General description
Identification
Ex : AD functional unit
60 version 02 BBV19342.indd
Instruction of use General description
Procedure pictogram
Mobile part
Cubicle
BBV19342.indd version 02 61
Instruction of use Instructions for access
to the inside of a AD cubicle
AD cubicle
Markings Access
above
1 To the lower compartment via the maintenance space or gutter
(access to CTs also).
62 version 02 BBV19342.indd
Instruction of use Instructions for access
to the inside of a AD cubicle
Closure
BBV19342.indd version 02 63
Instruction of use Instructions for access
to the inside of a AD cubicle
Open the protection switch of the VT Remove the access panel to the Vts
secondaries which is located in fuses (6 screws).
the troughs or in the LV compartment.
Closure
To put back into operation, carry out
operations in the reverse order of
removal (closed earthing switch).
Closure To put back into operation, carry out operations in the reverse order of the removal.
64 version 02 BBV19342.indd
Instruction of use Instructions for access
to the inside of a AD cubicle
Closure To put back into operation, carry out operations in the reverse order of removal.
Disconnect the VT low voltage Remove the VTs using the handle.
connector.
Closing the MV connection To put back into operation, For fixed VTs:
carry out operations in the reverse tightening torque on VT: 30 Nm.
compartment order of removal.
BBV19342.indd version 02 65
Instruction of use Instructions for access
to the inside of a AD cubicle
Accessing busbars
Safety rules
All operations described hereafter must be carried out
in compliance with the safety standards in force, under
the responsibility of a competent person.
Upper For access to busbars, see chapter Instructions for access to the inside of the
cubicle.
Lower Access to lower busbars is possible through the maintenance space by removing
the cubicle manhole sheet.
66 version 02 BBV19342.indd
Instruction of use Instructions for access
to the inside of a AD cubicle
Safety rules
All operations described hereafter must be carried out
in compliance with the safety standards in force, under
the responsibility of a competent person.
Using a screwdriver, raise the flat The shutters will fall and will lock
spring to release the lock. in the down position.
Push the ball into the link axis. To close, pull the the shutters up until
they lock.
Using a screwdriver, raise the flat The shutters will fall and will lock
spring to release the lock. in the down position.
Push the ball into the link axis. To close, pull the the shutters up until
they lock.
BBV19342.indd version 02 67
Instruction of use Steps for the tests
MV cable tests
Voltage indicator lights are not lit. See chapter Closing the earthing
switch.
68 version 02 BBV19342.indd
Instruction of use Steps for the tests
BBV19342.indd version 02 69
Instruction of use Operating Instructions
Extracting or inserting
the mobile part
Start Note: the following operations are
described using the ERT (tool to
remove/insert the mobile part from
Cubicle + mobile part in a disconnected /test position.
the switchgear that also allows
to place the mobile part on the floor).
70 version 02 BBV19342.indd
Instruction of use Operating Instructions
BBV19342.indd version 02 71
Instruction of use Operating Instructions
72 version 02 BBV19342.indd
Instruction of use Operating Instructions
2 to .
BBV19342.indd version 02 73
Instruction of use Operating Instructions
74 version 02 BBV19342.indd
Instruction of use Operating Instructions
Selector 4 to
(open earthing switch)
position to
to .
to .
BBV19342.indd version 02 75
Instruction of use Operating Instructions
of selector 2 to .
to .
76 version 02 BBV19342.indd
Instruction of use Operating Instructions
BBV19342.indd version 02 77
Instruction of use Operating Instructions
78 version 02 BBV19342.indd
Instruction of use Operating Instructions
BBV19342.indd version 02 79
Instruction of use Operating Instructions
80 version 02 BBV19342.indd
Instruction of use Operating Instructions
Racking-in VT fuses
Selector 6 to
BBV19342.indd version 02 81
Instruction of use Operating Instructions
Racking-out VT fuses
Selector 6 to
82 version 02 BBV19342.indd
Instruction of use Operating Instructions
Rack-in forbidden if in
BBV19342.indd version 02 83
Instruction of use Operating Instructions
It can also be used as an additional lock to prevent Place 1 padlock on the push-button
rack-in and rack-out. protective flap 1.
84 version 02 BBV19342.indd
Instruction of use Operating Instructions
Closed disconnector
BBV19342.indd version 02 85
Instruction of use Operating Instructions
Preventive and corrective An MCset 17.5 kV Maintenance and Services guide is available.
It gives practical information on:
maintenance
b maintaining the equipment in good operation,
b ensuring that the equipment is safe during all installation, repair and service
operations.
DEAI03EN/ART833121
DEAI03FR/ART833120.
86 version 02 BBV19342.indd
Instruction of use Corrective maintenance
Start Racked-out fuses and VTs LV plug Remove the front panel (see chapter
unplugged (see chapter Operating Instructions for access to the inside
instructions). of a cubicle).
Removing
Pivot the striker pads C into Carefully remove the pin from
a horizontal position. the striker pads D.
Push the plug E and turn towards Remove the plug and the fuse.
the left and release.
The fuse is unlocked.
BBV19342.indd version 02 87
Instruction of use Corrective maintenance
Installing
Place the spring on the plug Insert the fuses, with the strikers facing
and check that it is flush against the front.
the bottom of the plug and placed Place the plugs on the fuses (spring
between the two clips indicated by towards the bottom).
the arrows.
Carefully insert the pin on the striker Snap the link A et lift it to place
pin C. the striker pads C in a vertical position.
88 version 02 BBV19342.indd
Index
A
Accessing busbars 66
Accessing the main contacts 67
AD, CL-GL, TT cubicles (SF6 technology) 7-56-57-62
Assembling a MOTORPACT cubicle / MTP transition enclosure 24
C
Checking and cocking the internal arcing detector 54
Civil engineering with maintenance space 10-15
Closing the earthing switch 77
Cubicle fastened on rails 22
Cubicle fitted with IPX1/ IPX2 roofs 8
Cubicle unit packing 17
E
Earthing switch with electromagnetic locking 51
Extracting or inserting the mobile part 70
F
Floor finishing 14
Floor quality 22
G
General information 15
Glossary 3
H
Handling by rolling 19
Handling using a sling 18
I
Identification 9-60
Installation against a wall 9
Installing busbars 29
Installing busbars between MTP and the MOTORPACT cubicle 32
Installing the electric connections of the busbars and MV cables 26
Installing the end sheets 48
Installing the main earth connection 28
Installing the tunnels 43
L
Land packaging 18
Linking two cubicles 23
List of bags and accessories 5
Locking with electromagnet (option) 86
Locking with key locks (option) 85
LV cable routing and connection 41
M
Middle of the room mounting 9
MOTORPACT cubicle 13
MV cable screen earthing 40
MV cable tests 68
O
Ocean shipment packaging 18
Opening the earthing switch 79
BBV19342.indd version 02 89
Index
P
Placing cubicles in a switchboard 21
Placing MV cables on AD cubicle 34
Position of MV cables 12
Power frequency dielectric test 53
Preventing access using padlocks 83
Prior to installing the front panels 52
R
Rack-in check 25
Rack-in prevention with electromagnetic locking 52
Racking-in the mobile part 75
Racking-out the mobile part 76
Read the inscriptions on the front panel 60
Recommendations 4
Removing and inserting fixed or withdrawable VTs 65
Removing front protection cover plates 63
Removing the manhole sheet 65
Removing the mobile part transport fixations 25
Removing the MV compartment separation sheet 64
Removing the stop arc sheet in the cable compartment 66
Replacement of VT box fuses 87
S
Standard tightening torques 4
Storage 19
Summary of different mounting methods 14
Surface condition 22
Switchboard location in the installation room 11
Symbols 3
T
Transition enclosure MTP (Motorpact transition enclosure) 8-10
U
Unpacking cubicles 21
V
Voltage presence on MV cables 68
W
Warning for readers 56
Withdrawable mobile part 58
90 version 02 BBV19342.indd
Schneider Electric group service centers are there to provide:
- engineering and technical assistance,
- commissioning,
- training,
- preventive and corrective maintenance,
- adaptation work,
- spare parts.
Call your sales representative who will put you in touch with your nearest
Schneider Electric group service center or directly call the following telephone
number: +33 (0)4 76 57 60 60 Grenoble France.
Schneider Electric Industries S.A.S As standards, specifications and designs change from time to time, please ask for confirmation
35 rue Joseph Monier of the information given in this publication.
CS 30323
92506 Rueil Malmaison Cedex This document has been printed
www.schneider-electric.com on ecological paper.
954 503 439 RCS Nanterre Publishing: Schneider Electric Industries SAS.
Capital social : 896 313 776 Design: Profil.
Printing: