Professional Documents
Culture Documents
2017-09-15 NCR No 14 Quick Filling UFRO Chamber 2
2017-09-15 NCR No 14 Quick Filling UFRO Chamber 2
2017-09-15 NCR No 14 Quick Filling UFRO Chamber 2
SPECIFICATIONS/DOCUMENTS/DRAWINGS WorkInspectionRequestNo.5989
REFERENCES:
DESCRIPTIONOFNONCOMPLIANCE/NONCONFORMANCE:
AsperSection9ofBS8007standards,therateoffillingofwaterinsidethetankstructureshallbe2mper24hours.This
is to avoid the tank structure from experiencing sudden stresses during filling of water that may adversely affect the
structurestructurally.
However,Chamber2oftheUFRObasementtankwasfilledupto2mduringthefirsthouroffilling.
ThisisnotanacceptablepracticeatthesiteandAJFisadvisedtopreventthisinstancefromrecurring.
PenaltyCost(PhP):________________________
Preparedby: Notedby:
AngeloLandicho/15September2017 FranzAlbertoFrancisco/15September2017
SiteEngineerConsultant CM/PMConsultant
ACTIONTAKEN:
____________________________________________________________________________________________________
____________________________________________________________________________________________________
AgreedDateofCompliance:_____________________________________________________________
ROOTCAUSEANALYSIS:
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Contractor:_____________________________________Date:_______________________
ACTIONVERIFIEDANDNONCONFORMANCECLOSEDTHRU:
Validatedby: NotedforClosureofNCR:
AngeloLandicho FranzAlbertoFrancisco
SiteEngineerConsultant CM/PMConsultant
PMDOPCON01F52CS MAYNILADWATERSERVICES,INC.MWSSCOMPLEX,KATIPUNANAVE.,BALARA1105QUEZONCITY,PHILIPPINES
Rev.0 TEL.NO.+6329813438to39
Page1of1