NHAI DBM GRADING-2 MIX DESIGN WITH RAP

VARANASI-AURANGABAD SECTION OF NH-2 As PerMS-2,6th Revison


1250
RAP 20 3.5 4 4.5 5 5.5
AGG 80 1219.1 1212.9 1206.6 1200.4 1194.1
RAP 20% 243.8 242.6 241.3 240.1 238.8
AGG 80% 975.3 970.3 965.3 960.3 955.3
37.5 - 26.5 13.5 13.4 13.3 13.3 13.2
26.5-19 172.9 172.0 171.1 170.3 169.4
19-13.2 133.8 133.1 132.4 131.8 131.1
13.2-4.75 238.3 237.0 235.8 234.6 233.4
4.75-2.36 79.7 79.3 78.9 78.5 78.0
2.36-300m 241.7 240.4 239.2 238.0 236.7
300-75m 62.0 61.7 61.4 61.1 60.8
75m -0 9.1 9.0 9.0 8.9 8.9
Lime 24.4 24.3 24.1 24.0 23.9
975.4 970.2 965.2 960.5 955.4
Total Bitumen 43.8 50.0 56.3 62.5 68.8
RAP Binder 12.6 12.5 12.4 12.4 12.3
Fresh Bitumen 31.2 37.5 43.9 50.1 56.5
RAP
37.5 - 26.5 0 0 0 0 0
26.5-19 20.2 20.1 20 19.9 19.8
19-13.2 29.5 29.3 29.1 29 28.8
13.2-4.75 66.3 66 65.6 65.3 65
4.75-2.36 32.7 32.5 32.4 32.2 32
2.36-300m 64.9 64.5 64.2 63.9 63.5
300-75m 19.8 19.7 19.6 19.5 19.4
75m -0 10.5 10.4 10.4 10.3 10.3
243.9 242.5 241.3 240.1 238.8
Total 1250.5 1250.2 1250.4 1250.7 1250.7
Total Bitumen 43.8 50.0 56.3 62.5 68.8

For SOMA For SIVATPL For ICT