FOR SPECTRAA

ENQUIRY L V BUSDUCT SPECIFICATIONS TECHNOLOGY


25-07-2011 Document no : STL221-E11, Rev. 0 SOLUTIONS

Technical Specifications of
L V BUSDUCT WORK
For

A. M. Breweries Pvt. Ltd, Tamilnadu,


India
Project Code: STL 221
Document Ref: STL221-E11-Rev. 0

Electrical Engineering Services By

SPECTRAA TECHNOLOGY SOLUTIONS PVT.


LTD
No. 28, Ground Floor, 4th Cross, Veerappa Reddy Layout,
Munnekolala, Marthahalli, Bangalore- 560037, India
Phone : +91 80 4213 4238
E Mail : info@spectraa.net & sales@spectraa.net
Web : www.spectraa.net

Rev 0 25-07- Initial Issue BI DK SS


2011
Rev Date Remarks Prep By Chkd Appd
History By By

Page 1 of 5
FOR SPECTRAA
ENQUIRY L V BUSDUCT SPECIFICATIONS TECHNOLOGY
25-07-2011 Document no : STL221-E11, Rev. 0 SOLUTIONS

1. Name of Purchaser : A. M. BREWERIES PVT. LTD.

2 Location : Tamilnadu.

3 Equipment & Quantity :

D1 : 3200A LV Busduct from 1600kVA transformer TR-1 to PCC panel.


D2 : 3200A LV Busduct from 1600kVA transformer TR-2 to PCC panel.
D3 : 3200A LV Busduct from 1500kVA DG Set DG-1 to PCC panel.
D4 : 3200A LV Busduct from 1500kVA DG Set DG-2 to PCC panel.

4 List of documents attached to this specification.

a. General Terms & Condition of Purchase

5 Delivery Schedule

As mentioned in purchase order.

Page 2 of 5
FOR SPECTRAA
ENQUIRY L V BUSDUCT SPECIFICATIONS TECHNOLOGY
25-07-2011 Document no : STL221-E11, Rev. 0 SOLUTIONS

6.1 Vendors scope of work :

(a) Design of Equipment


(b) Document submission for Approval
(c) Manufacturing as per approved drawings
(d) Assembly
(e) Stage inspection & testing
(f) Final inspection as per schedule prescribed with purchasers witness
(g) Packing & Forwarding
(h) Transportation upto destination prescribed in Purchase order
(i) Commissioning Assistance
(j) Installation & Maintenance manuals
(k) Service support & Guarantee support.

6.2 Vendors scope of Supply :


(a) Removable canopy for Outdoor portion of busduct.
(b) Support frame & structure for busduct.
(c) Breather with silica gel for each busduct outdoor portion.
(d) Resin cast DMC support for busduct

6.3 Purchasers scope of supply & work :


a. Approval of Vendors drawing
b. Statutory approval before & after the installation at site
c. Unloading a site
d. Safe temporary storage at site

Page 3 of 5
FOR SPECTRAA
ENQUIRY L V BUSDUCT SPECIFICATIONS TECHNOLOGY
25-07-2011 Document no : STL221-E11, Rev. 0 SOLUTIONS

7 Busduct Specifications : Tag D1, D2, D3, and D4.

a. Service Receiving 2MVA power from


Transformer / DG set to PCC panel
b. Nominal System voltage 415, +/- 10%
c. Rated Frequency 50 Hz., +/- 5%

d. System Three phase 4 wire, (with


neutral)
e. System neutral earthing Solidly grounded
f. One minute power frequency withstand
voltage 2.5kV
g. Maximum system fault level 50kA for one second
h. Rated current 3200A Minimum
i. Maximum current density 0.8A / mm2
j. Ambient design temperature 50 deg. Celcius
k. Temp. rise for busbar joints 40 deg. Celcius
l. Temp. rise for plated busbar joints 50 deg. Celcius
m. Input connection & Entry Transformer / DG set terminals.
n. Output connection PCC panel Top entry
o. Earth busbar Required along entire length
p. Rainhood canopy Required along entire outdoor
length
q. Busduct support structure Required along entire length
with one coat of primer and two coats of epoxy paint.
r. Busduct Flexible Required at span not more
than 4.0m
s. Busbar material Aluminium, EL-91 grade.
t. Flexible Material Aluminium
u. Earth busbar size 50mm x 6mm
v. Phase busbar size 2 Nos x 200mm x 10mm or
Equivalent
w. Neutral busbar size 1 Nos x 200mm x 10mm or
Equivalent
x. Degree of Protection Outdoor part IP55 (Without louvers)
y. Degree of Protection Indoor part IP42 (With Louvers)
z. MOC for enclosure MS CRCA, 2.0mm Thick
aa. MOC for canopy MS CRCA, 1.2mm Thick

Page 4 of 5
FOR SPECTRAA
ENQUIRY L V BUSDUCT SPECIFICATIONS TECHNOLOGY
25-07-2011 Document no : STL221-E11, Rev. 0 SOLUTIONS

8. Documentation :

The vendor shall submit following drawings and documents in 3 number


of prints specified below.
All the drawings and documents shall be submitted to Purchaser within the
time from date of purchase order

1. Busduct datasheet With Quotation


2. Quality plan for approval 2 Weeks.
3. Copies of Type test/CPRI Test Certificates of Identical Rating - 2
Weeks.
4. General arrangement drawing for Approval 2 Weeks
5. Bill of Material 2 Weeks.
6. Final General Arrangement drawing - 4 Weeks.
7. Busduct test reports Before dispatch.

Page 5 of 5