POWER HOUSE Doc.REF.NO.

PH-IMS-SP010-FR01
REV/ISSUE: 01/01

NON CONFIRMITY DATE : 01/04/2015

NOTIFICATION Pages :2

Identification
1- Originator name 2- Date
Mahmoud H. Elshafei , Ahmed Menshawy 11-01-2016 3-Code N/A

4- Supplier N/A 5- PR.NO. N/A 6- NCN NO. 1-2016

7- WO.NO. N/A 8- Part description 3 Way Valves .

9- Part NO. N/A 10- Quantity 4 11- Drawing NO./SAMPLE N/A

12- Found in What Activity? Incoming Inspection


In-Process Inspection
Final Inspection
Other

13- Discription of non confirmity

1. Found scratch and corrosion on all valves


2. Found 3 solenoids not working .

14- Corrective Action

Responsible manager Responsible Sector Manager

field service MANGER OPERATION MANGER

Signature &Date Signature &Date


15- Preventive Action

Preventive action will written


by

16- Approval of corrective and preventive action

QC manager Signature &Date

17- Closing of non confirmity

TQM manager Signature &Date