Introduction

A multi-storey of 25 floors high class condominium will be build.


It will be a hillside sea-view condominium.
It will be done in a period of 18 months.
wHO ARE clients ?
People / groups that are direct beneficiaries of a project or
service.
Normally called as clients internally of a company, while as
customer if they are outside the company.
It is a very important role which can be hugely provided ideas
and resources for the project.
ROLE OF A CLIENT
Being responsible for the execution of the project from the
initial idea to implementation
Choosing the players involved in all stages from design
through construction to long term management
Ensuring that the needs of building users/customers are met
ROLE OF A CLIENT
Responsible for cooperate with the contractor and other
professionals
Take handover of the land or buildings when complete.
Ensuring that the permissions are secured in partnership with
the professionals appointed to the project
CLIENT vs DESIGNER
Client VS Designer
Preparing or modifying designs by taking account of
any pre-construction information provided by the
client.
~ General requirement and topography provided by
client.

Determines the probable cost of construction based on


various design alternatives appropriately meeting the
client objectives.
~ Client can choose the best drawing for the project.
Provide design information to the client and principal
contractor to help them comply with their duties.

Responsible to keep all the cost within the clients


budget.
Final Drawing Selected:
Client VS Project Manager
Discuss
with the client to produce a project
schedule.

Manage all the schedule of the project activities


in the site so that the project can be completed
within the period set by the client.

Report the project activities in site to the client.


CLIENT vs CONSULTANTS
Safety and Health
to environment of ground and sea
green building

Choice of form of competition


consultant assists in choosing the most appropriate
form for completing the specific project
Quality assurance
Materials(foundation)
Quality
commitments are met by the provides a
documented process
systematic and reproducible
Drainage system (water level)
Providing
advice on setting up and defining
the project and co-ordinating the design.
Contract administration
Invitingand processing tenders.(client can choose best
contractor)
Preparing contract documents for execution.
Inspecting the work of contractors.
CLIENT vs CONTRACTOR
Cost and time overflow

Relationship between them is not cooperative

he said/she said blame games


Increasing expenses for claim and
anti claim management

Lowest price-principle
COMMUNICATION!!!
Client

Responsible for functional expression of


needs

But does not necessarily have the


technical competency
1. Choose one point of contract
Client Delegate/Client Assistance
Act as an interface to help client make its needs clear and
verify the technical feasibility of objective with client
Avoid blame game

2. Communicate via visuals


Didnt understand the 2-D plans and elevation
Request the contractor take advantage of 3-D construction
technology
Customers who ask questions are our favourite customers! Theyre prepared,
and theyve done their homework. Theyre ready.
Ariel Istueta, Director of Marketing for Istueta Roofing in Miami

1. How long have you been in this business?

- Created systems and controls

- Do your research

- Can starting him off with a smaller project


2. What is our timeline for completion?

- Clear picture of start and complete a project

- Be aware of circumstances that might affect


- Do you have any currents bids that havent been
finalized that could impact this job?
3. What is the payment schedule?

- Important to discuss payment terms before


construction
- Be aware of exactly how much is due and
when
CLIENT vs M&E
RELATIONSHIP BETWEEN
CLIENT AND MECHANICAL&ELECTRICAL
ENGINEER
MECHANICAL
ENGINEER

ROLE Investigate the accident or dangerous occurrence during


maintenance and construction
Incoming inspection
Maintenance of various machine using at the site
Ensure all equipment is erected, pre-commissioned and
commissioned (tested if needed)
Supervises all installations of machines and equipment at the
site
Planning and installing the electronic machine part of the
building
RELATIONSHIP BETWEEN
CLIENT AND MECHANICAL&ELECTRICAL
ENGINEER
ELECTRICAL
ENGINEER

ROLE
Design high voltage equipment
Calculate the cost needed for the equipment
Scheduling delivery dates for supplies
Detect building construction electrical issues
Provide technical advice within expertise
Read and study the electrical plans
RELATIONSHIP BETWEEN
CLIENT AND MECHANICAL&ELECTRICAL
ENGINEER
RELATIONSHIP FROM CLIENT TO M&E

Get professional advice from M&E


Keep promise that made in the contract with M&E
Discuss about the setting and design with M&E
Oversea and follow up the design and work done by M&E
Manage cooperation with M&E well
Request reasonable enquiries and work to M&E if needed
Control the budget and interest towards M&E
Provide pre-information about the construction to M&E
RELATIONSHIP BETWEEN
CLIENT AND MECHANICAL&ELECTRICAL
ENGINEER
Mutual confidence Mutual trust

But a good relationship must come up with Engineering agreements


It will establishing and retaining effective working relationships between
clients and engineers
A good engineering agreement can optimize the relationship between
clients and engineers by minimizing such common causes for
misunderstanding as:
- services expected of the engineer
- the clients responsibility
- fees, disbursements and payments
- matters relating to confidential data and disclosure
- schedule and budget
- ownership of documents.