CHECK FOR HYDRAULIC

FOLLOWING VALVES SHOULD BE CLOSED:


1. BOILER OUTLET V/V & THEIR BYPASS V/V SHOULD BE CLOSED & HAND
TIGHTENED.
2. DRAIN V/V BEFORE BOILER OUTLET V/V CLOSED.
3. SOOT BLOWER MANUAL I/V KEPT CLOSED.
4. CBD ISOLATING V/V CLOSED.
5. CBD CLOSED.
6. PRDS INLET & BYPASS V/V CLOSED.
7. S/H &R/H SPRAY BLOCK V/V CLOSED.
8. EBD BS 4 & BS 5 - CLOSED.
9. S/H DRAINS (AT 27 M) CLOSED.
10.BFPs S/H & R/H SPRAY V/V CLOSED. (ALL BFPS EXCEPT RUNNING BFP)
11.BD V/V & ITS ISOLATING V/V, ITS DRAIN V/V CLOSED.
12.DRUM GUAGE GLASS ISOLATING V/V CLOSED.
13. DRAIN V/V OF BFP & HP HEATERS CLOSED. (FEED LINE DRAIN AT 8.5 M
LEVEL ALSO CLOSED)

FOLLOWING VALVES SHOULD BE OPEN:


1. ALL DRUM VENTS, S/H (73 MTR), R/H (73MTR), ECONOMISER VENT V/V
OPEN.
2. TURBINE SIDE MS, RH, CRH ATMOSPHERIC DRAIN V/V OPEN.
3. ECONOMISER INLET V/V E-2 OPEN.
4. FEED CONTROL STATION V/V FD-48 & FD-50 OPEN.
5. R/C V/V OF BFP OPEN.
6. IN ORDER THAT R/H SHOULD NOT BE PRESSURISED, R/H SPRAY DRAIN V/V
CAN BE OPENED.

BY ADJUSTING FD-49 & SCOOP, PRESSURE CAN BE RAISED BY BFP BUT


ENSURE THAT THE FLOW SHOULD BE SUCH THAT R/C V/V SHOULD NOT
GET CLOSED. FLOW LESS THAN 520 T/HR.