This document outlines the schedule and process for a B.Tech project review at Vitam College of Engineering. It includes 13 steps from deciding project batches to final project report submission. Key dates are provided for each step, including literature review from August to September, three project reviews from October to February, and final report submission on February 18th. The document also provides spaces for recording project details like subject guide, batch number, and project title and status.
This document outlines the schedule and process for a B.Tech project review at Vitam College of Engineering. It includes 13 steps from deciding project batches to final project report submission. Key dates are provided for each step, including literature review from August to September, three project reviews from October to February, and final report submission on February 18th. The document also provides spaces for recording project details like subject guide, batch number, and project title and status.
This document outlines the schedule and process for a B.Tech project review at Vitam College of Engineering. It includes 13 steps from deciding project batches to final project report submission. Key dates are provided for each step, including literature review from August to September, three project reviews from October to February, and final report submission on February 18th. The document also provides spaces for recording project details like subject guide, batch number, and project title and status.
1. Deciding Project Batches 19.07.2016 2. Guide Allocation 20.07.2016 3. Title and Abstract Submission 04.08.2016 05.08.2016 4. Literature review to 20.09.2016 5. Project Review I 18.10.2016 15.11.2016 6. Data Collection / Material Procurement to 30.11.2016 01.12.2016 7. Testing, Analysis & Survey to 28.12.2016 29.12.2016 8. Design calculations to 21.01.2017 9. Project Review II 25.01.2017 10. Rough copy for corrections 01.02.2017 11. Project Review III 10.02.2017 12. Pre talk 15.02.2017 13. Project report submission-Final copy 18.02.2017
Project Co-ordinator HOD, CIVIL
VITAM COLLEGE OF ENGINEERING (52) DEPARTMENT OF CIVIL ENGINEERING
B.Tech Project Review Report (2013 Batch)
Subject Guide : Batch No.: Regd Nos.:
Project Title :
Project status as on :
S.No. Description Date Remarks
1. Deciding Project Batches 19.07.2016 2. Guide Allocation 20.07.2016 3. Title and Abstract Submission 04.08.2016 05.08.2016 4. Literature review to 20.09.2016 5. Project Review I 18.10.2016 15.11.2016 6. Data Collection / Material Procurement to 30.11.2016 01.12.2016 7. Testing, Analysis & Survey to 28.12.2016 29.12.2016 8. Design calculations to 21.01.2017 9. Project Review II 25.01.2017 10. Rough copy for corrections 01.02.2017 11. Project Review III 10.02.2017 12. Pre talk 15.02.2017 13. Project report submission-Final copy 18.02.2017
Recommendations from review committee
Review committee member I Review committee member - II
Project Co-ordinator HOD, CIVIL
VITAM COLLEGE OF ENGINEERING (52) DEPARTMENT OF CIVIL ENGINEERING
B.Tech Project Schedule (2013 Batch)
1. Deciding Project Batches 19.07.2016
2. Guide Allocation 20.07.2016 3. Title and Abstract Submission 04.08.2016 05.08.2016 4. Literature review to 20.09.2016 5. Project Review I 18.10.2016 15.11.2016 6. Data Collection / Material Procurement to 30.11.2016 01.12.2016 7. Testing, Analysis & Survey to 28.12.2016 29.12.2016 8. Design calculations to 21.01.2017 9. Project Review II 25.01.2017 10. Rough copy for corrections 01.02.2017 11. Project Review III 10.02.2017 12. Pre talk 15.02.2017 13. Project report submission-Final copy 18.02.2017