TURBINE SIDE DEFECTS

TM-II SIDE DEFECTS:


1) GD TANK PUMP-2 NOT AVAILABLE.
2) DR-17 VALVE INOPERATIVE FROM MECHANICAL SIDE.
3) BPE2 VALVE HAVING BODY LEAKAGE.
4) AS PER POG: MS-508, MAL-12, MAL-27, MAL-15 ARE PASSING.
5) SEAL OIL COOLER (AIR SIDE)-2NOS. CHOCKUP.
6) MDBFP-5D S/H, R/H SPRAY LINE NRV PASSING.
7) MAL-56 VALVE LEVER NOT AVAILABLE.
8) MAL-11, MAL-12, MAL-13, MAL-14 INOPERATIVE.
9) CEP-5A, 5B & 5C WATER LEAKAGE THROUGH STUFFING BOX.
10) SEAL WATER PUMP-5B DISCHARGE LINE NRV PASSING.
11) TDBFP-A TURBINE R. J. BEARING SHAFT VIBRATION FRANT SHOWING 75micron AT DAS &
LOCAL 74micron.
12) TDBFP-5B OIL FILTER (PCR SIDE) SUSPECTED LEAKAGE.
13) CRH TO DEAEARATORLINE NRV FLANGE LEAKAGE (UNIT-6 SIDE).
14) HPH-5A DRIP LINE TO DEAEARATOR LEAKAGE BEFORE IMPULSE LINE ISOLATING VALVE.

EM-II SIDE DEFECTS:


1) CCW-5A,ABNORMAL SOUND IN MOTOR
2) CCW-5B ABNORMAL SOUND IN MOTOR
3) GTR TRAN. R, Y, B PHASE OIL LEVEL GAUGE GLASS READING NOT SHOWING.
4) SAT-3A & 3B GAUGE GLASS READING NOT SHOWING.
5) UAT-5A, 5B & 5C GAUGE GLASS READING NOT SHOWING.
6) GTR TRANSFORMER B OIL LEAKAGE DROP BY DROP NEAR INSULATOR.
7) ALL SF6 GAS BREAKER NEED TO CHECK GAS PRESSURE. (CCW SIDE)
8) HT & LT TRANSFORMER SILICA GEL COLOR CHECK & REPLACE.
9) 24VDC BATTERY ROOM COOLER PCR-5 SIDE NOT WORKING.

TST-II SIDE DEFECTS:


1) CWPA BOARD BUS COUPLER BREAKER AUTO PICKUP PROBLEM.
2) VACCUME PUMP-5A, SYSTEM I/L VALVE NOT OPERATING ON AUTO.

I & C SIDE DEFECTS:


1) ACW-5C, DISCHARGE PRESS GAUGE LEAKAGE.
2) CEP-5A THRUST BEARING TEMP. GAUGE FAULTY.
3) CCW SIDE ALL TRANSFORMER GAUAGE CALIBRATION. (CCW SIDE)
4) TDBFP-5A R J BEARING SHAFT VIBRATION HIGH.
ODP II SIDE DEFECTS:
1) ACW-PUMP R/C VLV U7 SIDE, INOPERATIVE
2) ACW-5C, AIR VENT ISOLATING VLV LEAKAGE
3) ACW R/C LINE TINY PUNCTURE NEAR R/C VLV
4) CCW-5B BFV OPERATING PROBLEM.
5) CT FAN 5A/6 CCW HOT LINE LEAKAGE.

Boiler Side Defect


BM-2 Defects
1) Atomizing lines drain line leakage near AS 210.
2) PRDS low capacity line 1st drain valve not operative.
3) At 23m. CBD 1st Isolation valve (PCR side) gland leakage.
4) CBD VALVE 63m gland leakage.
5) S-76 valve gland leakage
6) At 76m HRH line 1 puncture (PCR side).
7) ESP Hopper D-11 Foreign Material.
8) WWSB NO.55 work pending from BM-2 side.
9) ESP CRM 5A tripping frequently.
10) ID fan 5B Lop no. 2 leakage & high vibration.

EM-2 Defects
1) D-pass I/c from EEP-B main leaver not working properly.
2) 02. B-pass I/c from EEP-B main leaver not working properly.
3) 03. SAH-5B standby motor G/B abnormal sound.

Testing Defects
1) FLY ash control panel switch not operating properly. Water v/v A1, A2, A3, B2, C1, D1, D2, not
operate. Indication not showing.
2) ESP fields 4C1, 1D1, 5D1 under voltage.
3) HEH-4A, 3B NOT getting on.
4) HESH-1C RYB not showing.
5) HESU 2A Not getting on.

INC-2 Defects
1) AS-208 PRDS CV DIAPHRAGM CHECKING WORK.