BASIC WELL SERVICE OPERATION

Syafruddin ZUBAER
Freelance Instructor & Consultant
07/04/2014
MAIN TOPICs

DAY-2 :

2.1 Basic of Snubbing Operation


2.2 Basic of Coiled Tubing Operation
2.3 Basic of Water Shut Off &Stimulation

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 2
07/04/2014
2.2 Basic of
COILED TUBING OPERATION

Syafruddin ZUBAER
( Freelance Instructor & Consultant )

07/04/2014
COILED TUBING - Overview

COILED TUBING

Principles:
Operation almost same
as to Snubbing unit
Working under press.
Different:
Snubbing ~Jointed pipe
CT ~ Continous pipe

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 4
07/04/2014
COILED TUBING - Overview

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 5
07/04/2014
COILED TUBING - Overview

Coil Tubing on Land

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 6
07/04/2014
COILED TUBING - History

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 7
07/04/2014
COILED TUBING - History

1944: Project Operation PLUTO (Pipe Line Under


The Ocean) for fuel transportation from England
to European Contingent
Successfull fabrication and spooling of cont.
flexible pipeline inspiring modern CT.
Late 1940s:injection of cont.tbg&cables into live
well
Early 1950s:drilling w/cont. flexible string

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 8
07/04/2014
COILED TUBING - History

Early 1960s (Bowen Tools):antenna deployment


aboard sub merged submarine(0.625 brass
600) using Contra-Rotating Chain Drive principle
CT Injector.
1962: Bowen Tools & California Oil adopted the
antenna deployment for injector design.
1962: 1st fully functioning CT unit for washing
out sand bridge in wells.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 9
07/04/2014
COILED TUBING - History

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 10
07/04/2014
COILED TUBING - Evolution
CT Pipe Size Evolution :
1989
1986 1988
1970 1978
1965

3/4-in. 1-in. 1-1/4-in. 1-1/2-in. 1-3/4-in. 2-in.

1995

1992
1990
1989

2-3/8-in. 2-7/8-in. 3-1/2-in. 4-1/2-in.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 11
07/04/2014
COILED TUBING - Evolution
CT length evolution :
10000 ft reel 1965 250 ft strip lengths (Republic Tubing, USA)

40 welds
1983 1000 ft strip lengths
10 welds
1985 1700 ft strip lengths
6 welds
1986 3500 ft strip lengths (Japanese Suppliers)
3 welds

1987 Tubing milled continuously


No welds
Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 12
07/04/2014
COILED TUBING - Evolution

CT pipe evolution

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 13
07/04/2014
COILED TUBING - Manufacturing&Material
How CT made ?
Weld surface finished and
WELD SURFACE FINISHED
heat treated
AND HEAT TREATED
In line seam
IN-LINE SEAMwelding
WELDING

Sheet Alloy
SHEET ALLOY

ROLLERS
Rollers PRESSING
pressing sheet into
SHEET INTO tubeTUBE

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 14
07/04/2014
COILED TUBING - Manufacturing&Material

CT made:Butt Weld
A complete interruption of Butt weld
the load bearing material

Large area affected by


welding heat to either side

Filler material has


completely different
mechanical properties

Now relegated to field repair Heat affected zone (HAZ)

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 15
07/04/2014
COILED TUBING - Manufacturing&Material

CT made: Bias Weld

Strips preparation

Weld completed

and area

heat treated

Tube formed

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 16
07/04/2014
COILED TUBING - Manufacturing&Material

Tapered String

Heavier wall

Intermediate

Lighter wall

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 17
07/04/2014
COILED TUBING - Manufacturing&Material

True tapered
Intermediate section
Heavier wall Lighter wall
tapered over length

Bias weld Bias weld


Eliminate section change stress
Intermediate sections specially milled
Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 18
07/04/2014
COILED TUBING - Manufacturing&Material

Coil Tubing Material


H2S Resistant
High Strength Properties: Against Tensile, Burst,
Collapse and Compressive Failures
Corrosion & Erosion Resistant: Acids or Wellbore
Fluids, Solids Laden Fluids
Ductile
Repairable: Replace or remove damaged sections
Maximum Possible Life: Low Cycle Fatigue Resistant
Economical

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 19
07/04/2014
COILED TUBING - Manufacturing&Material

Coil Tubing Material


Almost all CT is manufactured from:
Low alloy carbon steel A606 Type 4, Modified
Drivers for alternative materials include desire
for:
Improved working life or fatigue resistance ($/job)
Higher strength to weight ratio
Resistance to corrosion
Alternative materials under investigation include:
Quench and tempered chrome-molly alloy steel
Titanium
Composite materials
Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 20
07/04/2014
COILED TUBING

Coil Tubing operation


Drilling Operation
Production Tubing *
Sediment Washing & Drilling
Cementing,Acidizing,Pumping chemicals
Fishing & Milling operation (*)
Killing well
Well Start Up, Unload liquid
Logging (new coil tbg developmnt)

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 21
07/04/2014
COILED TUBING - Operation Principles

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 22
07/04/2014
COILED TUBING - Operation Principles

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 23
07/04/2014
COILED TUBING Operation Principles

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 24
07/04/2014
COILED TUBING- Unit Component

Coiled Tbg
Surface Equip. Main
component

Power Pack
Control Cabin
Tubing Reel
Injector Head
PCE stack
Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 25
07/04/2014
COILED TUBING Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 26
07/04/2014
COILED TUBING - Unit Component

CT operation Principles:

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 27
07/04/2014
COILED TUBING - Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 28
07/04/2014
COILED TUBING - Unit Component

CTU Control Cabin


Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 29
07/04/2014
COILED TUBING Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 30
07/04/2014
COILED TUBING - Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 31
07/04/2014
COILED TUBING - Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 32
07/04/2014
COILED TUBING - Unit Component

CT Injectors

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 33
07/04/2014
COILED TUBING - Unit Component
Coiled tubing injector head

Inside tension

Outside tension

Load cells

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 34
07/04/2014
COILED TUBING - Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 35
07/04/2014
COILED TUBING - Unit Component

Stabbing Coil Into Injector

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 36
07/04/2014
COILED TUBING - Unit Component

Injector Head Specification

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 37
07/04/2014
COILED TUBING - Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 38
07/04/2014
COILED TUBING - Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 39
07/04/2014
COILED TUBING - Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 40
07/04/2014
COILED TUBING - Unit Component

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 41
07/04/2014
COILED TUBING - Pressure Control Equip.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 42
07/04/2014
COILED TUBING Pressure Control Equip.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 43
07/04/2014
COILED TUBING - Pressure Control Equip.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 44
07/04/2014
COILED TUBING - Pressure Control Equip.

Goosneck

Coiled Tbg Rig Up:


Surface Stack &
Well Control

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 45
07/04/2014
COILED TUBING - Pressure Control Equip.

Coiled Tbg
BOP :
-Blind
-Shear
-Kill Port
-Slip
-Pipe

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 46
07/04/2014
COILED TUBING - Pressure Control Equip.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 47
07/04/2014
COILED TUBING - Pressure Control Equip.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 48
07/04/2014
COILED TUBING - Pressure Control Equip.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 49
07/04/2014
COILED TUBING Down Hole Tool

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 50
07/04/2014
COILED TUBING Down Hole Tool

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 51
07/04/2014
COILED TUBING CT Connector Schlm.

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 52
07/04/2014
COILED TUBING CT Connector - Hall

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 53
07/04/2014
COILED TUBING CT Connector - Hall

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 54
07/04/2014
COILED TUBING CT Connector - Hall

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 55
07/04/2014
COILED TUBING CT Connector - Hall

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 56
07/04/2014
COILED TUBING Pipe Stress

Depending on the location of Pressure


the pipe in the operation, Pressure, tension and bending
different primary stress and bending
conditions may be in action

Effects of pressure and tension


are closely related (cumulative
forces) consequently operating
limits should consider both
factors
Tension
and
For example, increasing compression
tension:
Lowers collapse
resistance Pressure, tension or compression
and
Increases burst
possible torque
resistance
Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 57
07/04/2014
COILED TUBING Pipe Stress

Pressure
and bending
Pressure, tension
and bending

Tension and
compression

Pressure, tension or
compression and
possible torque

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 58
07/04/2014
COILED TUBING Pipe Stress
Axial Stress
Radial Stress
(Tension - Compression)
(Bending Stress)

Hoop Stress
(Ballooning - Necking)
Bending

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 59
07/04/2014
COILED TUBING - CoilLIMIT
CT Operation Limit

Pressure and Tension


Diameter and Ovality
Fatigue and Corrossion
Pumped and Produced fluid
H2S Consideration

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 60
07/04/2014
COILED TUBING - CoilLIMIT
CT Operation Limit
The CoilLIMIT* module (part of the CoilCADE software
suite) determines pressure and tension limits which
are based on:
physical properties of the material
geometry of the tube
diameter
ovality
wall thickness (compensated for corrosive service)
relationship between pressure and tension effects
anticipated wellbore conditions

Prepared for each tubing size (OD and wall thickness)


Determined using Von Misses incipient yield criteria,
i.e., advanced equations/algorithms

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 61
07/04/2014
COILED TUBING - CoilLIMIT
CT Operation Limit

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 62
07/04/2014
COILED TUBING CoilLIMIT

CT

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 63
07/04/2014
COILED TUBING - CoilLIMIT

Tension & Pressure Limit (Fix Nmbrs)


Early attempts relied on fixed number guidelines
Burst Pressure: Static 5000 psi
Dynamic 4000 psi
Collapse Pressure 1500 psi
Wellhead Pressure 3500 psi
Tension 80% of manufacturer yield

Ignoring pipe size, casing size, and bending effects was not
good enough
These numbers are still used today

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 64
07/04/2014
COILED TUBING

Coil Tubing Advantage


Save & efficient well intervention
Capability for rapid mobilization,rig up & prep.
Ability to Circulate Liquid/Inject Gas during
RIH & POOH
Reduce trip time,less down time
Lower environmental impact & risk
Reduced crew&personnel requirements
Relatively low cost
Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 65
07/04/2014
COILED TUBING
Coil Tubing Features

Live well operation


High pressure
Continous operation
Rigidity&Strength Tools/Devices push/pull
thru High dev. or Horizontal section
Installation of Conductor & Conduits in the CT

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 66
07/04/2014
COILED TUBING

Coil Tubing DHE:


Check Valve (Ball ,Flapper) ~ double
Connectors & Disconnectors
Circulation & Control Valve
Jar & Accelerators
Tool Head & Deployment Bar
Running Pulling & Shifting Tools
Tubing End & Nipple Locator

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 67
07/04/2014
COILED TUBING

Coil Tubing Operation:

Nitrogen Kick Off


Well Bore Clean Out
High Pressure Jetting
Downhole Motors
Cementing through CT
Acidizing through CT
Coil Fract

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 68
07/04/2014
COILED TUBING

Coil Tubing Operation:

Water Control Polymer Injection


Fishing/Stiffline
Bridge Plug & Packer
Coiled Tubing Logging
CT Perforation
CT Drilling (CTD)
CT Completion

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 69
07/04/2014
COILED TUBING

Some Coil Tubing operational problem:

CT Pinch
CT Parted
CT Oval , buckling
CT Stuck
Surface equipment problems

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 70
07/04/2014
COILED TUBING

Common Downhole Tool used

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 71
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 72
07/04/2014
COILED TUBING

Nitrogen Kick Off

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 73
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 74
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 75
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 76
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 77
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 78
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 79
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 80
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 81
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 82
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 83
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 84
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 85
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 86
07/04/2014
COILED TUBING

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 87
07/04/2014
Wired CT Components

CTL System
CT Reel with Cable
CT Logging Head
Surface Power, Data and
Depth comm. between CT
Power Depth and Logging Unit
&
Deployment System
Data
Surface Window and/or
riser
DH deployment bar

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 88
Wired CT Features

A CT string with a Cable installed provides the following


key features which, in various combinations, enables many
possibilities.
Electrical power to downhole tools or systems
Data from downhole tools or systems
Fluid conduit with continuous circulation/injection
capability
Continuous and controllable motion (up and down)
Rigidity and strength for the application of force
Safe live well operation

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 89
07/04/2014
Wired Coiled Tubing Applications

Logging (conveying wireline logging tools):


In deviated and horizontal well bores
High flow rate wells
Logging while pumping lifting non-flowing wells or
cooling geothermal wells
Perforating:
Deviated well bores or flowing wells
Down hole monitoring and data acquisition:
Support of Coiled Tubing Drilling (CTD*) systems
Monitoring/recording BHP and BHT while pumping
fluids
Advanced applications, e.g., selective well testing
Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 90
07/04/2014
Wired CT Coiled Tubing Logging

As an alternative to Drill pipe or Wireline conveyed logging,


CTL techniques provide several advantages
Shorter trip times
Continuous logging capability (up and down)
Rigidity and strength for deviated or high rate
applications
Logging cable is protected by CT for tough or
aggressive conditions
Forces applied by CT equipment are less likely to
damage the toolstring (especially compression)
Continuous circulation ability, e.g., for lubricating
fluids
Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 91
07/04/2014
Wired CT Perforating

As an alternative to Tubing, Wireline or Snubbing conveyed


perforating, CT provides several advantages
Safe and efficient live well operations
Ability to circulate before and after perforating, e.g.,
perforating or kick-off fluid
Cable enables greater depth control or correlation
with known formation features (i.e., tubing or
snubbing conveyed methods cannot have internal
cable)
SAFE* system developed for connection of explosive
devices

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 92
07/04/2014
Reel Configuration for Wired CT

Pressure Cable

bulkhead Coiled tubing

CT isolation
Jumper cable
valve

Reel Reel Reel

collector axle swivel

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 93
07/04/2014
Cable Injection

CT Reel
Logging Cable

Flow Tube Cable Seal

Water Tank

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 94
07/04/2014
Conveying Guns - Wired Firing System
Features
CT with Cable
Cable head /
Deployment bar
S.A.F.E. System
Advantages
Depth Correlation
Dis-advantages
Length of lubricator
only
Mech. Disconnect
Deployment Bar

Cable head Firing Head Guns

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 95
07/04/2014
WELL SERVICE OPERATION

Syafruddin Zubaer
2.2 Basic of Coiled Tubing Operation 96
07/04/2014