Indonesia Sulawesi Mining Investment

Company 2 150MW unit operation ticket


Numbering:
Operation task: # Slip parameter shutdown
Operation start time

()

()

It has
been Operatin

execut g time
ed
Preparation before the shutdown
Received a long order to stop the order, notify the professional
1
staff to do the preparatory work before the shutdown
Expected to stop the time, contact the coal in advance to control
2
the coal control coal
Start the fuel pump, try to vote oil gun, to ensure that the oil
3
gun and oil system well spare
According to the nature of the unit outage, the length of time to
4
determine whether the original coal warehouse coal burning
The boiler equipment to conduct a comprehensive inspection; the
5 heating surface for a full sober once; check the automatic
adjustment system is normal, proof of the drum water level gauge
The boiler equipment to conduct a comprehensive and serious
6 inspection, and statistics of the equipment defects, write defect
contact
Shutdown operation
As the case will be automatically changed to manually adjust to
maintain the water level is normal, the furnace combustion
stability, and gradually buck to the speed control valve fully
1
open, according to the sliding parameters of the shutdown curve to
control the cooling rate, and to meet the relevant requirements of
the turbine.
Numbering:
Operation task: # Slip parameter shutdown
The main parameters of the recording unit before the load
reduction: load ____MW, the main steam pressure ____Mpa, reheat
2
steam pressure _____Mpa, the main steam temperature _____ ,
reheat steam temperature _____ .
Load from 90%, the unit into the sliding mode of operation, to
confirm the opening of the high pressure valve in the 88% to 90% of
3
the opening, the main steam pressure decreases with the
corresponding load reduction
According to the load gradually reduce the amount of coal. Control
4 the main steam pressure down speed 0.15Mpa / min, the main steam
temperature down speed 1 / min
When the unit load is reduced to 110 MW, the first milling system
operation (pulverizing system) is stopped according to the
5
situation. Before the coal mill outage, the mill and the air duct
should be thoroughly ventilated and purged
When the unit load is reduced to 50%, a milling system (pulverizing
6
system) is stopped according to the situation.
7 Put the boiler air preheater continuous soot.
When the load is reduced by 30%, the input layer ____ oil gun
8
combustion. Maintain furnace combustion stability.
9 Boiler feed pipe switch to bypass operation.
After feeding the fuel to help the petrol long value, contact the dust
10
on duty staff, exit the electrostatic precipitator to run.
With the reduction of the load, stop the last milling system
11
(milling system). Gradually stop ____ layer oil gun.
Load down to 0, the generator out of the column, the steam engine to
12 stop, stop all the oil gun, boiler flameout, confirm the MFT action is
normal
Drum water level up to +250 mm, open economizer recycling, pay attention to
13
the upper and lower wall temperature difference 50
Confirm that all the fuel cut off, stop two primary fans and sealed fan operation,
14 confirm the fuel supply, return oil quick closing valve closed, check the first and
second temperature water gate is indeed closed.
Stop A blower, A induced draft fan, to maintain the furnace air volume in 30% of
15
the total air volume, the furnace to purge.
After the furnace is purged for 5 minutes, stop the B blower and B drawer to
16
run and close the damper, flue baffle.
Air preheater inlet smoke temperature dropped to below 150 , the air stop
17
pre-discharge.
Numbering:
Operation task: # Slip parameter shutdown
When the furnace outlet temperature dropped below 80 , stop the fire test
18
cooling fan running.
Such as the need to bring pressure to the water, the drum pressure
down to 0.6MPa, drum wall temperature below the point of 140 ,
water-cooled screen, screen superheater wall temperature allows,
19
can be hot water, with pressure , Drum wall temperature difference
50 , if overrun trend, should be suspended to the water, to be
stable after the temperature, and then to the water.
When the drum pressure drops to 0.2MPa, open all the air doors at
20 the top of the furnace. When the drum pressure drops to zero and
the drum water temperature is lower than 90 ,
Precautions
Shutdown process should be strictly controlled drum wall between
1
any two points temperature difference 50
During the shutdown process should ensure that the steam superheat>
2
50
Buck rate: superheated steam pressure 0.02 ~ 0.05MPa / min ,;
3
cooling rate: superheated steam temperature 1 ~ 1.5 / min
Remarks