Scope of Work for Pipeline Integrity at PSO KT

Under the supervision of API 570 Certified Inspector

1. Visual external inspection:


General Visual inspection of pipe sections and pumping manifolds
Visual inspection of flange joints
Visual inspection of valves
Visual inspection of each pipe supports
Visual inspection of each concert pipe support
Visual inspection of associated steel structures
Visual inspection of deadlegs
Visual inspection of dead ends

2. Thickness survey:
Thickness monitoring location (TML) marking on pipe sections
Measurement of pipe wall thickness reading in four direction at each meter

3. Paint condition survey:


Visual thickness of pant condition
Measurement of paint thickness in four direction at each meter

4. Weld joint inspection:


Inspection of weld cracks (surface or near to surface) by DPT / MPI method of complete each
weld joint.
5. Calculations:
(In case of previous thicknesses and design date are made available)
Corrosion rate calculations of pipe sections
Maximum Allowable Working Pressure Determination
Retirement Thickness Determination

6. Recommendation for repair and modification:


7. Reporting