Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

RATE ANALYSIS

Project:
Contractor:
Item: 2 Date: 02/12/2017
Description: EXCAVATION OF FOUNDATION ( PITS & TRENCHES)

Performance:
Code: Unit: Quantity:

MATERIALS
No. Description Unt. Quant. Desp. Price Total

Total Materials:
EQUIPMENT
No. Description Quant. Cop/Dep Price Total

Total Equipment:
Unit Equipment Cost

LABOUR
No. Description Quant. Wage Bonus Total Wage Total Bonus

LaboursubTotal:
Social benefits:
Labour General Total :
Unit Labor Cost:

DIRECT COST SUBTOTAL A:


Administrative and General Expenses:
SUBTOTAL B:
Unpredicted Utility:
SUBTOTAL C:
0,00 Financing:
UNIT PRICE WITHOUT TAX:
0,00 VAT (tax.):
0,00 Other taxes:

UNIT PRICE (D):


Project:
Contractor:
Date:
Item:
Description: SURFACE TREATMENT OF MATERIAL COMING FROM EXCAVATION

Performance:
Code: Unit: Quantity:

MATERIALS
No. Description Unt. Quant. Desp. Price Total

Total Materials:
EQUIPMENT
No. Description Quant. Cop/Dep Price Total

Total Equipment:
Unit Equipment Cost

LABOUR
No. Description Quant. Wage Bonus Total Wage Total Bonus

LaboursubTotal:
Social benefits:
Labour General Total :
Unit Labor Cost:

DIRECT COST SUBTOTAL A:


Administrative and General Expenses:
SUBTOTAL B:
Unpredicted Utility:
SUBTOTAL C:
0,00 Financing:
UNIT PRICE WITHOUT TAX:
0,00 VAT (tax.):
0,00 Other taxes:

UNIT PRICE (D):

RATE ANALYSIS
Poject:
Contractor:

Item.: 5 Date: 02/05/17

Description: SUPPLY, TRANSPORTATION, PREPARATION AND PLACEMENT OF


REINFORCEMENT STEEL FY 4200 KGF / CM2, USING BAR NO.6 TO NO.12
(DIAMETER 1 "TO 1 3/8") FOR INFRASTRUCTURE
Performance:
Code: Unit: Quantity:

MATERIALS
No. Description Unt. Quant. Desp. Price Total

Total Materials:

EQUIPMENT
No. Description Quant. Cop/Dep Price Total

Total Equipment:
Unit Equipment Cost:
LABOUR
No. Description Quant. Wage Bonus Total Wage Total Bonus

LaboursubTotal :
328,00 Social benefits:
Labour General Total:
Unit Labor Cost:

DIRECT COST SUBTOTAL A:


15,00 Administrative and General Expenses:
SUBTOTAL B:
10,00 Unpredicted Utility:
SUBTOTAL C:
0,00 Financing:
PRECIO UNITARIO SIN IMPUESTO:
0,00 VAT (tax.):
0,00 Other taxes:

UNIT PRICE (D):