Indoor Building Coverage System

Preliminary Acceptance Test Report

PurchaserChina Mobile Pakistan Limited

Supplier GrenTech Pakistan(PVT) LTD.

Date:
Content
1. PROJECT SUMMARY............................................................................................................................... 1
2. MATERIAL LIST ....................................................................................................................................... 2
3. PROJECT CHANGE ORDER ................................................................................................................... 3
4. REPEATER PERFORMANCE TEST RECORD .................................................................................... 4
5. IN-BUILDING COVERAGE SYSTEM PERFORMANCE TEST RECORD ...................................... 5
1IN-LINE AMPLIFIER PERFORMANCE TEST RECORD ................................................................................... 5
2VSWR TEST RECORD ............................................................................................................................... 6
3ANTENNA POWER TEST RECORD .............................................................................................................. 7
4IN-BUILDING SIGNAL STRENGTH AND CALL TEST RECORD ..................................................................... 8
5HANDOVER TEST RECORD ........................................................................................................................ 9
6. COVERAGE EFFECT ANALYSIS......................................................................................................... 10

7. APPLICATION OF PRELIMINARY ACCEPTANCE TEST ............................................................. 11


8. SYSTEM DIAGRAM ................................................................. ERROR! BOOKMARK NOT DEFINED.
China Mobile Pakistan

1. Project Summary

Project Name Pc Bhurban Expansion

Project Scale

Coverage Objective To provide good coverage and quality.

Repeater Manufacturer GrenTech


Repeater Style Indoor
Repeater Model SGR-R3B0CT-2
Installation Site Pc Bhurban Expansion
Kick Off Date
Completion Date

Status of Signal Source BTS

Cell Name
Channel/Carrier
Nos.
BTS

Working
Frequency
Frequency
Hopping
Status of Repeater
Channel/Carrier
Numbers.
Repeater

Working
Frequency
Access
Approach

Purchaser Representative:
Supplier Representative: Date:

-1-
China Mobile Pakistan

2. Material List
Site ID: Site name : Pc Bhurban Expansion.
PurchaserChina Mobile Pakistan Limited Supplier GrenTech Pakistan (PVT) LTD.
SN Equipment Name Model Unit Quantity Remark
1 BTS PCS
2 Gsm900 selective 10W repeater SGR-R311D-10 PCS
3 Gsm1800 selective repeater10W for Lahore SGR-R321D-10(2) PCS
4 Gsm1800 selective repeater 10W for Karachi SGR-R321D-10(2) PCS
5 Gsm900 selective repeater 2W for Islamabad SGR-R311D-2 PCS
6 Gsm1800 selective repeater 2W for Lahore SGR-R320C-2(2) PCS
7 Gsm1800 selective repeater 2W for Karachi SGR-R321D-2(2) PCS
8 2W Amplifier SGR-R3B0CT-2 PCS 1
9 PICO repeater(900M) for Islamabad SGR-R310C-50m/PK/8M V1.0 PCS
10 PICO repeater(1800M) for Lahore SGR-R320C-50m(2)/PK PCS
11 PICO repeater(1800M) for Karachi SGR-R320C-50m(2)/PK-I PCS
12 Omni Antenna Multiband SGR-DGCTX-XD-G3/6 PCS
13 Indoor Panel Antenna SGR-DGCTX-BG-G8/10-90/65 PCS
14 Yagi Antenna SGR-GCTX-BM-G10-40 PCS
15 Logarithm Period Antenna SGR-DGCTX-DS-G10/11-65/50 PCS
16 Power Splitter 2 Way Multi Band SGR-GFQ-2D PCS
17 Power Splitter 3 Way Multi Band SGR-GFQ-3D PCS
18 Power Splitter 4 Way Multi Band SGR-GFQ-4D PCS
19 3dB Bridge Coupler200W SGR-DQ-3-D PCS
20 Coupler 6dB Multiband5dB&7dB200W SGR-OHQ-6D PCS
21 Coupler 10dB Multiband 200W SGR-OHQ-10D PCS
22 Coupler 15dB Multiband 200W SGR-OHQ-15D PCS
23 Coupler 20dB Multiband 200W SGR-OHQ-20D PCS
24 Attenuator 6dB Multiband SGR-SJQ-6 PCS
25 Attenuator 10dB Multiband SGR-SJQ-10 PCS
26 Attenuator 15dB Multiband SGR-SJQ-15 PCS
27 NM Connector for 1/2" feeder 1/2" Normal N-Male PCS 40
28 NM Connector for 7/8" feeder 7/8"Normal N-Male PCS 130
29 connector NJJ (male-male) SGR-ZJT-NJJ PCS
30 connector NKK(female-female) SGR-ZJT-NKK PCS
31 Right Angle N-Male-Female SGR-N-KJW PCS
32 1/2" Normal Feeder Cable SGR-KX-1/2 m 6
33 7/8" Normal Feeder Cable SGR-KX-7/8 m 4

34 Lay PVC Tube Cable Duct, Flexible Pipe etc m


Lay Armoured Cable AC 2.5MM23DC 6MM2
35 2 m
Lay Protection Iron Tube, Steel Hanger, Trunking
36 slot(10040MM m
37 Lay protection power lines m
38 Lay protection plicacorrugated pipe m
Lay grounding wire(lateral 16MM2 copper pistil
39 wrap with rubber m
40 Install gantry and watertight caisson PCS
41 Electric Meter(10A) and install Electric Meter case m
42 Air switch PCS

Purchaser Representative:
Supplier Representative: Date:
-2-
China Mobile Pakistan

3. Project Change Order


Site Name: Pc Bhurban Expansion
Site Address: Pc Bhurban Expansion

Original Design
Requirement

Changed Content

Reason for Change

Authorizing
Department

Purchaser Representative:
Supplier Representative: Date:

-3-
China Mobile Pakistan

4. Repeater Performance Test Record

Manufacturer GrenTech ModelSGR-R3B0CT-2 Site NamePc Bhurban Expansion.

Item Manufacturer Provided Record Test Record Remark


Uplink Downlink Uplink Downlink
1Frequency Range
2System Gain
3Total Output Power, Downlink
4Isolation
5Donor Antenna VSWR
6Service Antenna VSWR

Purchaser Representative Supplier Representative Date

-4-
China Mobile Pakistan

5. In-Building Coverage System Performance Test Record

1In-Line Amplifier Performance Test Record

Manufacturer GrenTech
Product ModelSGR-R3B0CT-2

Test Item Test Result Remark

Input Signal PowerdBm

Output Signal PowerdBm

Downlink GaindB

Uplink Noisy PowerdBm

Purchaser Representative:
Supplier Representative: Date:

-5-
China Mobile Pakistan

2VSWR Test Record

SN Test Point VSWR Meters Remark

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Purchaser Representative:
Supplier Representative: Date:

-6-
China Mobile Pakistan

3Antenna Power Test Record

SN Antenna Code BSIC/CID BCCH Input Power

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Purchaser Representative
Supplier Representative Date:

-7-
China Mobile Pakistan

4In-Building Signal Strength and Call Test Record

SN Test Point BSIC/CID BCCH Level Quality Quality Drop Remark

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
PS
1. In Test Point Column, fill in the test location such as 500 meter from repeater, southeast, and
mark out in-building or out-building.
2. In BSIC and BCCH Column, fill in the BSIC and BCCH code of donor BTS.
3. In "Quality" Column, fill in the highest value during the call.

Purchaser Representative
Supplier Representative Date:

-8-
China Mobile Pakistan

5Handover Test Record

SN Test Line Handover Status Quality Call Drop


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Purchaser Representative
Supplier Representative Date:

-9-
China Mobile Pakistan

6. Coverage Effect Analysis

Purchaser Representative

Supplier Representative: Date

- 10 -
China Mobile Pakistan

7. Application of Preliminary Acceptance Test

Project
Supplier GrenTech Pakistan(PVT) LTD. Pc Bhurban Expansion
Name

Site
Purchaser China Mobile Pakistan Limited Pc Bhurban Expansion
Address

Kick-off Completion
Date Date

Quality Self-Test Comments Quality Manager Comments:

Technical Manager Quality Manager:

Applicant
Date:

Submitted to

CC

- 11 -
China Mobile Pakistan

Engineering Technical Specification

Effective Owner Replace Date Revision Reference


15-Sep-13 N.A. F ETS

SNAG LIST Pc Bhurban Expansion:


Address: Pc Bhurban Expansion

Fault Fault Resolved(Clear)


Severity Verify
Item Detail Description Date Vendor
Level CMPak

Note: Vendor to include all faults identified on equipment - specific tests in the above list.
Severity Level A faults must be resolved immediately.
Severity Level B faults must be resolved within 7 days. (Number should not exceed 20)Target Date to clear the snags:________
Main Vendor: Accepted by for (CMPak)
Authorized Person (Manager): Authorized Person (Regional PM):
Name: _________________________
Name:
Sign: _________________________ Sign: ________________________
Date: _________________________ Date: ________________________

- 12 -
China Mobile Pakistan

Engineering Technical Specification

Effective Owner Replace Date Revision Reference


25-Sep-13 N.A. F ETS
Date: _________________________ Date: ________________________

Site ID: Site name Pc Bhurban Expansion:

PRELIMINARY ACCEPTANCE TEST performed by:

Vendor: TI Supervisor CMPak TI Supervisor

Authorized Person: Authorized Person:


Name: Name:

Sign: Sign:
Date: Date:
Approved by:

CMPak
Regional Project Manager- Rollout: Regional Manager O&M:
Name: Name:

Sign: Sign:

Date: Date:
FINAL ACCEPTANCE TEST performed by:

Vendor: CMPak

Authorized Person: Authorized Person:


Name: Name:

Sign: Sign:
Date: Date:
Approved by:

CMPak
Regional Manager O&M: RCTO:
Name: Name:

Sign: Sign:

Date: Date: