Professional Documents
Culture Documents
Typical Drawings of Railway Cross Sections
Typical Drawings of Railway Cross Sections
23
3
2 9
21
1
2
15
16
13
18
2
12
17
19
20
1
14
2
11
LEGEND 8
1
0
2
DIRECTION OF FLOW (DEPENDS ON FORMATION GRADE) CAT
CH 7
1
BA
BENCH DRAINS NK
DIRECTION OF FLOW (DEPENDS ON GROUND CONTOURS)
TO BE DISCHARGED 6
1
10
5
1
CA
TC
H
14
NOTE:
13
BA
12
NK
11
FOR DRY WEATHER ACCESS,
FALL
PROVIDE CONCRETE INVERT CROSSING. BENCH
OR FOR WET WEATHER ACCESS, PROVIDE
4
1
CROSSING OVER EXTENDED CULVERT.
FALL
CESS DRAIN OUTLET
BENCH MAINTENANCE ACCESS ROAD TYPE 2
MAI
NTE
TYPE 2 NANCE AC 12
E ACCESS ROAD CESS ROAD TY
NTE
MAI NANC PE 2
1
1
MAINTENANCE ACCESS ROAD TYPE 2
NK
BA
H
TC
CA
TABLE DRAIN TABLE DRAIN
MAINTENANCE ACCESS ROAD TYPE 1
140
100
120
160
180
80
60
40
20
TRACK
CULVERT
EMBANKMENT CUTTING
FALL
4. TRACK STANDARD SHALL BE AS SPECIFIED BY THE MANAGER TRACK AND CIVIL SYSTEMS.
BENCH
5. FOR DETAILS OF TRACK FORMATION AT STATION YARDS REFER TO THE MANAGER TRACK
AND CIVIL SYSTEMS.
BENCH DRAINS
7. WHERE EXTRA MATERIAL IS REQUIRED FOR EMBANKMENTS EITHER:-
TO BE DISCHARGED
(A) THE MAINTENANCE ACCESS ROAD SHALL BE PLACED AT FORMATION LEVEL IN CUTTINGS OR
ALONG CONTOUR LINES
(B) THE WIDTH OF THE TABLE DRAIN MAY BE INCREASED
# TRACK CENTRES (DOUBLE TRACK)
DRAWING No. 2718, 2720 AND 2721. 2721, 2722 AND 2723 SUPERSEDES STANDARD DRAWING Nos. 2567, 2568, 2569,
6000 2570, 2571, 2572 AND 2478. 10.WHERE THE TABLE DRAIN IS INDEPENDENTLY GRADED TO THE FORMATION,
EVERYWHERE
(DESIRABLE) 3. FOR DETAILS OF TRIPLE AND QUADRUPLE TRACK CENTRES REFER THE TABLE DRAIN PROFILE IS TO BE AMENDED AS NECESSARY.
TO STANDARD DRAWING No. 2721. 3. ALL DIMENSIONS SHOWN ARE IN METRES UNLESS NOTED OTHERWISE.
4500 CONTOURS AND FORMATION LEVELS ARE IN METRES.
COAL LINES
(MINIMUM)
4000
ELSEWHERE 11.00 15.00 (MIN.)
(MINIMUM)
50
50
n 40
1i 1i
n 40 MAST
50
500
LEVELS
0.
0.
0.
n 40
1i 1i
n 40 n 40
1i 1i
n 40
TABLE DRAIN
FORMATION LEVEL RAIL LEVEL
50
RAIL LEVEL
50
50
50
00
00
0.
0.
0.
0.
.
1
1
00
00
.
1
REFER TO TABLE
SUBGRADE "CAPPING LAYER" SUBGRADE
"CAPPING LAYER"
2.50 3.00 4.50 2.50 2.50 4.50 # 4.50 2.50 SUBGRADE LEVEL SUBGRADE LEVEL
REFER TO TABLE
FOR BATTER SLOPES "CAPPING LAYER"
"CAPPING LAYER" SUBGRADE FOR BATTER SLOPES
REFER TO NOTES SUBGRADE LEVEL SUBGRADE SUBGRADE LEVEL REFER TO NOTES
SINGLE TRACK CUTTINGS DOUBLE TRACKS
00
REFER TO NOTES REFER TO NOTES
BOTH BATTERS
.
1
(IF SPECIFIED)
00
00
SUBGRADE SUBGRADE
.
.
1
1
BULK FILL
SUBGRADE LEVEL "OUTER VERGE MATERIAL"
"CAPPING LAYER" BULK FILL "CAPPING LAYER"
BOTH BATTERS
SUBGRADE (IF SPECIFIED) SUBGRADE LEVEL
"CAPPING LAYER" BULK FILL SUBGRADE BULK FILL
"OUTER VERGE MATERIAL"
"CAPPING LAYER"
SUBGRADE LEVEL BOTH BATTERS
SUBGRADE LEVEL SINGLE TRACK DOUBLE TRACKS
EMBANKMENTS (IF SPECIFIED) EMBANKMENTS
SINGLE TRACK DOUBLE TRACKS 0 2000 4000mm
1:100
ELECTRIFIED LINES NON-ELECTRIFIED LINES 0 5000 10000mm