OBJECTIVE:
1. To measure different types of pipes.
2. To cut different types of pipes.
3. To join or connect different types of pipes.
INSTRUCTION:
1. Solve for the total number of pipes of the following figure.
2. Solve for the amount of solvent cement.
PROCEDURE:
1. Determine first the total length of the pipe in the figure by adding the engagement
lengths and the face to face distance.
2. Divide the total length of pipe by the effective length of one pipe. Available effective
lengths are 3.00m and 6.00m in selected diameters of the pipe. Effective lengths are
as follows:
3. Solve for the amount of solvent cement per joints. Every pipe has 2 joints. Table
shows how much solvent cement you will use based on the diameter of the pipe.
COMPUTATION:
PRACTICAL QUESTION:
What strategy you will consider to lessen the waste of the pipe you will use?
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________