Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Introduction

Purpose of plan

The rally car design challenge project will provide a definition


of project ,including the project goals and its objectives

The project plan defines the following

* Project purpose

*Project goals and objectives

*Scope

*Assumptions and constraints

*Project timeline

Background Information

A roll cage is a specially engineered and constructed frame built in (or


sometimes around, in which case it is known as an exo cage) the passenger
compartment of a vehicle to protect its occupants from being injured in an
accident, particularly in the event of a roll-over

There are many different roll cage designs depending on the application,
hence different racing organizations have differing specifications and regulations.
They also help stiffen the chassis, which is desirable in racing applications

A roll bar is a single bar behind the driver that provides moderate roll-
over protection. Due to the lack of a protective top, some modern convertibles
utilize a strong windscreen frame acting as a roll bar. Also, a roll hoop may be
placed behind both headrests (usually one on older cars), which is essentially a roll
bar spanning the width of a passenger's shoulders.
A chassis consists of an internal vehicle frame that supports an artificial
object in its construction and use, can also provide protection for some internal
parts. An example of a chassis is the underpart of a motor vehicle, consisting of the
frame (on which the body is mounted). If the running gear such as wheels and
transmission, and sometimes even the driver's seat, are included, then the assembly
is described

Project Approach

This section outlines the way we will roll out the plan, including the
highest level Milestone

PLAN:

Phase I : Design the roll cage with the exact dimensions

Phase II : Analyse the design for the failures

Phase III : select the materials used roll cage and chassis

Phase IV : Use the best of the selected materials

Phase V : Manufacture the rollcage and chassis

Phase VI : Analyse and test for failures

Phase VII: Making changes in components to avoid failures


PROJECT GOALS AND OBJECTIVES

The goals and objectives for this project will focus on


implementing a report that:

You might also like